Home / Browse projects / Raigarh, Maharashtra / Yogakshema Residency Phase-II

Registered No litigation declared Residential / Group Housing project

Yogakshema Residency Phase-II

By Superb Maa Infra and Housing LLP

RG-MH-06626 · RERA P52000053597 · Last updated on MahaRERA portal: 14 Nov 2026

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA
  • Completion date moved by 40 months, 4 of them under MahaRERA's automatic 4-month extension
  • 1 extension taken

Clear

  • No litigation declared
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Apr 2030Possession promisedmoved 40 months from the original
8 of 44Construction stages doneacross 4 buildings; furthest along: Slabs of Super Structure, 24%
325 of 505Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 105 documents Report an error

Yogakshema Residency Phase-II is a Residential / Group Housing project by Superb Maa Infra and Housing LLP in Raigarh, Maharashtra, registered with MahaRERA as P52000053597 on 10 Nov 2023. Possession is promised by 30 Apr 2030. The completion date has moved by 40 months from the original filing, 4 of them under MahaRERA's automatic 4-month extension for the West Asia conflict. 180 of the 505 units on this registration are recorded sold or booked, and 8 of 44 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameYogakshema Residency Phase-II
  • TypeResidential / Group Housing
  • Location
    • Giravale Village Road
    • Giravale
    • Panvel
    • Raigarh
    • 410221
  • Pincode410221
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000053597
  • ReraGenie IDRG-MH-06626

Builder

  • NameSuperb Maa Infra and Housing LLP
  • Entity typePartnership
  • PartnersSugat Gyaneshwar Waghmare, Milind Pralhad Kamble, Vishal Maheshkumar Dave, Vaibhav Dilip Wankhade
  • Other registrations1 more →

Key dates

this monthRegisteredNov 2023First promiseDec 2026Revised toApr 2030

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on10 Nov 2023
  • Promised completion30 Apr 2030
  • Revised completionRevised to 30 Apr 2030 (originally 31 Dec 2026)
  • Buildings4 building records
  • Documents filed105 files

Current status

36%180 of 505 units booked
13.5%Work done, per cost certificate

Figures as on 14 Nov 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Block CNA29272070207
Block DNA27251920192
Block ENA29271060106
Block FNA20000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 14 Nov 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Slabs of Super Structure, at 24%.

Block C31%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure24%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks17%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Block D9%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Block E29%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure10%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks6%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Block F9%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 14 Nov 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes4%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed1097

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1,097
Closed/Covered244
Open Space853
BuildingClosed/CoveredOpen SpaceTotal
Block C90322412
Block D92320412
Block E62211273

Land and ownership20

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area31,830 sq m
Land owned byThe promoter, with other names on the file
Named landowners20
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on10 Jun 2025
LandownerVillageDistrict
Asha Rajkumar ThakurJiteRaigarh
Ram Balu BhomkarUranRaigarh
Ankita Vikas ChoragheChikhaleRaigarh
Asmita Ganesh PatilSomtaneRaigarh
Vaijyanti Deepak PawarKhalapurRaigarh
Bhagyashri Bhagwan KondilkarApteRaigarh
Manjula Baban BhomkarGiravaleRaigarh
Ruchita Ravindra PatilChikhaleRaigarh
Aniket Balaram MhatreShirdhonRaigarh
Dattatray Narayan BhomkarKharpadaRaigarh
Anant Babu TareGiravaleRaigarh
Suresh Babu TareGiravaleRaigarh
Ramesh Babu TareGiravaleRaigarh
Anita Namdev KedariJatadeRaigarh
Sugandha Janardan PatilSomtaneRaigarh
Santosh Dattu ThakurParadeRaigarh
Bhau Dattu ThakurTuradeRaigarh
Vanita Vasant DigheSomtaneRaigarh
Rajani alias Kunda Sunil MhatreShirkiRaigarh
Janardhan Narayan TakleGiravaleRaigarh

Approvals and building plan

Sanctioning authorityMaharashtra State Road Development Corporation Limited
Permissible FSI40967.89
Proposed, not sanctioned40,968 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchICICI Bank Ltd., Bombay Hub, Z Wing, Kamla Mill Compound, Senapati Bapat Marg, Lower Parel, Mumbai.400013, Maharashtra
Estimated costRs 240.38 cr
Cost incurredRs 32.50 cr
Work done13.52%
BuildingWingEstimatedIncurred
-NARs 70.00 crRs 65.09 lakh
Block ENARs 58.21 crRs 10.77 cr
Block DNARs 55.16 crRs 3.46 cr
Block CNARs 53.06 crRs 15.14 cr
Block FNARs 3.95 crRs 2.48 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVAO Architects Research And Design Studio
EngineerRudraksh G Pathak
EngineerFidesto Projects Private Limited
Chartered AccountantH S B and Co
Chartered AccountantShrada Shankar Bagwale
Chartered AccountantK Parekh Associates
PartnerRole in project
Superb Maa Infra and Housing LLP-

Extensions2

A revised date filed with the regulator does not change the possession date in your agreement for sale. Commentary on the order notes that a buyer's right to interest for delay under section 18 of RERA may still stand; that question has not been tested.

MahaRERA order of 7 Aug 2026Dec 2029 → Apr 2030

Granted by MahaRERA, not applied for by the promoterMahaRERA's order of 7 August 2026 extended the completion date of eligible registered projects by four months, treating the West Asia conflict as force majeure. Promoters did not have to apply for it.

EA30062621626Dec 2026 → Dec 2029

Reason as filed by the promoterWe, hereby apply for extension u/s 7(3), of the registered project Yogakshema Residency Phase-II bearing vide no P52000053597, until date 31/12/2029. As prescribed under circular no 07/2019 dated 8 Feb 2019, the consent of 53.88% of the allottees is enclosed herewith. The said consents are calculated as per 14(2)(ii). The construction of the upper floors of the 2 buildings i.e. Block C & Block E as well as construction of entire Block D as per latest Approved plans is being done expeditiously and Promoter is striving to complete the balance work at the earliest. The Promoter is also in the pro

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12606633Santosh Dattu ThakurSuperb Maa Infra and Housing LLP09/10/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 4 Sep 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 4 Sep 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 22 May 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 30 Aug 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Apr 2030

Documents filed105

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 105 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2023-2024)File: YR_P-II_Form-2A_2023-24.pdf14 Nov 2026
Form 2A (FY 2024-2025)File: YR_P-II_Form-2A_2024-25.pdf14 Nov 2026
Form 2A (FY 2025-2026)File: YR_P-II_Form-2A_2025-26.pdf14 Nov 2026
Form 5 (FY 2024-2025)File: YR_P-II_Form-5_2024-25.pdf6 Nov 2026
Form 5 (FY 2025-2026)File: YR_P-II_Form-5_2025-26.pdf6 Nov 2026
Withdrawal Update Form 1File: YR_P-II Form-1 Sep 2026.pdf31 Oct 2026
Withdrawal Update Form 2File: YR_P-II Form-2 Sep 2026.pdf31 Oct 2026
Withdrawal Update Form 3File: YR_P-II Form-3 Sep 2026.pdf31 Oct 2026
Form 5 (FY 2023-2024)File: YR_P-II_FY-2023-24_Form-5.pdf31 Oct 2026
Withdrawal Update Form 1File: YR_P-II_Form-1 June 2026.pdf24 Oct 2026
Withdrawal Update Form 2File: YR_P-II_Form-2 June 2026.pdf24 Oct 2026
Withdrawal Update Form 3File: YR_P-II_Form-3 June 2026-C.pdf24 Oct 2026
Building plan approvalFile: Amended Approval Plans_Part 1 of 3.pdf22 May 2026
Building plan approvalFile: Amended Approval Plans_Part 2 of 3.pdf22 May 2026
Building plan approvalFile: Amended Approval Plans_Part 3 of 3.pdf22 May 2026
Withdrawal Update Form 1File: YR_P-II Form-1 March 2026.pdf11 Apr 2026
Withdrawal Update Form 2File: YR_P-II Form-2 March 2026.pdf11 Apr 2026
Withdrawal Update Form 3File: YR_P-II Form-3 March 2026.pdf11 Apr 2026
Building plan approvalFile: YR_Parking Plan.pdf10 Feb 2026
Withdrawal Update Form 1File: YR_P-II Form-1 Dec 2025.pdf22 Jan 2026
Withdrawal Update Form 2File: YR_P-II Form-2 Dec 2025.pdf22 Jan 2026
Withdrawal Update Form 3File: YR_P-II Form-3 Dec 2025.pdf22 Jan 2026
Declaration and undertaking (Annexure A)File: Affidavit cum declaration sec 3 RERA.pdf20 Jan 2026
Withdrawal Update Form 1File: YR_P-II Form-1 Sep 2025.pdf10 Dec 2025
Withdrawal Update Form 1File: YR_P-II Form-1 June 2025.pdf10 Dec 2025
Withdrawal Update Form 2File: YR_P-II Form-2 Sep 2025.pdf10 Dec 2025
Withdrawal Update Form 2File: YR_P-II Form-2 June 2025.pdf10 Dec 2025
Withdrawal Update Form 3File: YR_P-II Form-3 Sep 2025.pdf10 Dec 2025
Withdrawal Update Form 3File: YR_P-II Form-3 June 2025.pdf10 Dec 2025
Form 1File: 202403 Ar.pdf23 Jul 2025
Form 1File: 202312 Ar.pdf23 Jul 2025
Form 1File: YR P II 202406 Form 1.pdf23 Jul 2025
Form 1File: YR P II 202409 Form 1.pdf23 Jul 2025
Form 2File: 202403 Er.pdf23 Jul 2025
Form 2File: 202312_Er.pdf23 Jul 2025
Form 2File: YR P II 202406 Form 2.pdf23 Jul 2025
Form 2File: YR P II 202409 Form 2.pdf23 Jul 2025
Form 3File: 202403 CA.pdf23 Jul 2025
Form 3File: 202312_CA.pdf23 Jul 2025
Form 3File: YR P II 202406 Form 3.pdf23 Jul 2025
Form 3File: YR P II 202409 Form 3.pdf23 Jul 2025
Disclosure of Sold and Booked InventoryFile: 202403 Sold.pdf23 Jul 2025
Disclosure of Sold and Booked InventoryFile: 202312_Sold.pdf23 Jul 2025
Disclosure of Sold and Booked InventoryFile: YR P II 202406 Sold.pdf23 Jul 2025
Disclosure of Sold and Booked InventoryFile: YR P II 202409 Sold.pdf23 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: YR_P-II_202409_Form-1.pdf22 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: YR_P-II_202409_Form-2.pdf22 Nov 2024
Disclosure of sold/ booked inventoryFile: YR_P-II_202409_Sold.pdf22 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: YR_P-II_202409_Form-1.pdf18 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: YR_P-II_202406_Form-1.pdf18 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: YR_P-II_202406_Form-3.pdf18 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: YR_P-II_202409_Form-3.pdf18 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: YR_P-II_202409_Form-2.pdf18 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: YR_P-II_202406_Form-2.pdf18 Nov 2024
Disclosure of sold/ booked inventoryFile: YR_P-II_202406_Sold.pdf18 Nov 2024
Disclosure of sold/ booked inventoryFile: YR_P-II_202409_Sold.pdf18 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 202312_Er.pdf7 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 202403_Er.pdf7 Aug 2024
Details of encumbrances concerned to FinanceFile: YR_P2-Encumbrance_032024.PDF5 Aug 2024
Details of encumbrances concerned to LegalFile: YR_P2-Encumbrance_032024.PDF5 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 202312_CA.pdf2 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 202403_CA.pdf2 Aug 2024
Disclosure of sold/ booked inventoryFile: 202312_Sold.pdf28 Jul 2024
Disclosure of sold/ booked inventoryFile: 202403_Sold.pdf28 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 202312_Ar.pdf10 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 202403_Ar.pdf10 Jul 2024
Details of encumbrances concerned to FinanceFile: 3A_encumbrance letter.pdf5 Sep 2023
Details of encumbrances concerned to FinanceFile: 3B_legal encumbrance declaration.pdf5 Sep 2023
Details of encumbrances concerned to LegalFile: 3A_encumbrance letter.pdf5 Sep 2023
Details of encumbrances concerned to LegalFile: 3B_legal encumbrance declaration.pdf5 Sep 2023
CERSAI detailsFile: 12_CERSAI.pdf5 Sep 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: 17_MPK_OREO.pdf5 Sep 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: 17_SGW_OREO.pdf5 Sep 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: 17_VDW_OREO.pdf5 Sep 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: 17_VMD_OREO.pdf5 Sep 2023
Proforma of Agreement for saleFile: 14_YR_P-II_AfS_Final.pdf5 Sep 2023
Proforma of Allotment letterFile: 13_YR_P-II_Allotment Letter.pdf5 Sep 2023
Deviation Report with respect to Allotment letterFile: 13A_Allotment deviation.pdf5 Sep 2023
Deviation Report with respect to model copy of AgreementFile: 14A_AfS_Deviation.pdf5 Sep 2023
Layout approvalFile: 4_8.pdf4 Sep 2023

How this compares with Raigarh

36%of this project is bookeddistrict median 28%
21%of Raigarh projects moved their completion datethis one moved by 40 months
25%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Yogakshema Residency Phase-II on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Giravale5,900+ in Raigarh

2 kmYogakshema Residency PhaCompleted 9Lapsed / revoked 3Other 23Dot size: filed unitsN

Filed coordinates, straight-line distance. 35 registered projects within 2 km.

Builder: Superb Maa Infra and Housing LLP

Superb Maa Infra and Housing LLP has 2 registrations on MahaRERA, including Yogakshema Residency Phase-I and Yogakshema Residency Phase-II. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if Yogakshema Residency Phase-II is delayed beyond 30 Apr 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Yogakshema Residency Phase-II?

The registered promoter entity is Superb Maa Infra and Housing LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Yogakshema Residency Phase-II?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Yogakshema Residency Phase-II?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Yogakshema Residency Phase-II?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Yogakshema Residency Phase-II?

The professionals named in the filing: Architect: VAO Architects Research And Design Studio; Engineer: Rudraksh G Pathak; Engineer: Fidesto Projects Private Limited; Chartered Accountant: H S B and Co; Chartered Accountant: Shrada Shankar Bagwale; Chartered Accountant: K Parekh Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Yogakshema Residency Phase-II?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Yogakshema Residency Phase-II. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Yogakshema Residency Phase-II to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.