Registered No litigation declared Residential / Group Housing project

ARIHANT ASPIRE PHASE I

By ARIHANT ABODE LIMITED

RG-MH-77984 · RERA P52000014107 · Last updated on MahaRERA portal: 4 May 2026

Source: official MahaRERA filing

Red flags

  • 10 complaints at MahaRERA
  • Completion date moved by 12 months
  • 1 extension taken
  • Rs 150.00 crore secured on the land, in favour of TATA Capital Housing Finance Limited
  • The declared charge does not appear in the CERSAI report on the filing

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedmoved 12 months from the original
17 of 33Construction stages doneacross 6 buildings; furthest along: Staircases, 90%
97 of 1,210Units unsoldnot recorded sold or booked
10Complaints at MahaRERAon this registration
Jump to the 171 documents Report an error

ARIHANT ASPIRE PHASE I is a Residential / Group Housing project by ARIHANT ABODE LIMITED in Raigarh, Maharashtra, registered with MahaRERA as P52000014107 on 7 Nov 2017. Possession is promised by 30 Dec 2027. The completion date has moved by 12 months from the original filing. 1,113 of the 1,210 units on this registration are recorded sold or booked, and 17 of 33 construction stages are filed complete. 10 complaints are on record with the regulator.

At a glance

Project

  • NameARIHANT ASPIRE PHASE I
  • TypeResidential / Group Housing
  • Location
    • Palaspe
    • Panvel
    • Raigarh
    • 410221
  • Pincode410221
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000014107
  • ReraGenie IDRG-MH-77984

Builder

  • NameARIHANT ABODE LIMITED
  • Entity typeCompany
  • CINU70102MH2009PLC197090
  • GSTIN27AAICA0612R1ZH
  • CIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • DirectorASHOKKUMAR BHANWARLAL CHHAJER
  • Other registrations3 more →
  • Declared earlier projects3 →

Key dates

this monthRegisteredNov 2017First promiseDec 2026Revised toDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on7 Nov 2017
  • Promised completion30 Dec 2027
  • Revised completionRevised to 30 Dec 2027 (originally 30 Dec 2026)
  • Buildings6 building records
  • Documents filed171 files

Current status

92%1113 of 1,210 units booked

Figures as on 4 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ILIANANA46433199328
HORTENSIANA464331910329
DELLANA474349415509
WING BNA404001717
WING CHORTENSIA494301212
Wing FWing F474201515

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building6

As on 4 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

17 of 33 construction stages are filed complete across 6 buildings. The stage furthest along is Staircases, at 90%.

ILIANA77%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises63%
Sanitary Fittings within the flats / premises48%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.30%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.20%
HORTENSIA77%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises63%
Sanitary Fittings within the flats / premises48%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.30%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.20%
DELLA58%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure83%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises10%
Sanitary Fittings within the flats / premises7%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks37%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
WING BNot stated
ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable
WING C · wing HORTENSIANot stated
ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable
Wing F · wing Wing FNot stated
ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 4 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes30%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes55%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed907

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots907
Closed/Covered907
BuildingClosed/CoveredTotal
ILIANA311311
HORTENSIA311311
DELLA285285

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area16,295 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofTATA Capital Housing Finance Limited
Secured amountRs 150.00 crore
CERSAI search filedYes
Declared on27 May 2026

Approvals and building plan

Sanctioning authorityNAVI MUMBAI AIRPORT INFLUENCE NOTIFIED AREA
Permissible FSI162948.66
Proposed, not sanctioned65,714 sq m
Buildings approved6
Buildings sanctioned5

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPLOT NO 82 SECTOR - 17 VASHI NAVI MUMBAI 400703

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectYOGITA BHANDARKAR
EngineerKALEEM SAYYAD
EngineerYOGESH RAO
Chartered AccountantANJANI KUMAR GOYAL
Chartered AccountantUmmed Jain & Co.
PartnerRole in project
ARIHANT ABODE LIMITED-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA27052621108Dec 2026 → Dec 2027

Reason as filed by the promoterWe hereby state and declare that there has been a delay in the completion of the project as well as in the submission of the present request due to circumstances beyond our control. The delay has occurred due to unforeseen factors, including disruption in the supply chain of construction materials arising out of the prevailing war situation. The shipment and availability of essential construction materials were adversely affected for a significant period, which further resulted in financial constraints and impacted the overall progress of the project. Further, considering the adverse impact of

Complaints filed with MahaRERA10

Case no.ComplainantRespondentFiled
CC006000000195236Preeti SinghArihant Abode Ltd.14/12/2020
CC006000000195238Preeti SinghArihant Abode Ltd.14/12/2020
CC006000000199305surekha sanbhuienaArihant Abode LTD04/12/2021
CC12400363Anil Kashinath VarandeARIHANT ABODE LIMITED07/10/2024
CC12400709Prakash kashinath VarandeARIHANT ABODE LIMITED08/11/2024
CC12401276kavita sunil sadaranganiARIHANT ABODE LIMITED29/12/2024
CC12401277sunil shamsunder sadaranganiARIHANT ABODE LIMITED29/12/2024
CC12504687ARIHANT ABODE LIMITEDRaja Narayan Naidu30/12/2025
CC12601320VAISHALI MAHESH DAMUHSHTEARIHANT ABODE LIMITED10/03/2026
SM12600278Bhakti AchrekarARIHANT ABODE LIMITED27/04/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Oct 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 1 Mar 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 1 Mar 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 1 Mar 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Dec 2027

Documents filed171

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 171 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form 1_Aspire Phase I_31122025.pdf4 May 2026
Form 2File: Form 2_Aspire Ph I_31122025.pdf4 May 2026
Form 3File: Form 3_Aspire Phase I_ Final V1_revised_stamp.pdf4 May 2026
Disclosure of Sold and Booked InventoryFile: Aspire Ph I_Disclosure of sold unsold units_31122025_signed.pdf4 May 2026
Form 1File: Form 1_Aspire Ph I_310326.pdf4 May 2026
Form 2File: Form 2_Aspire Ph I_250326.pdf4 May 2026
Form 3File: Form 3_Aspire Ph I_250326.pdf4 May 2026
Disclosure of Sold and Booked InventoryFile: Aspire Ph I_Disclosure of sold unsold units_25032026_signed.pdf4 May 2026
Form 1File: Form 1_ASPIRE PHASE I_30092025_comp.pdf27 Oct 2025
Form 2File: Form 2_Aspire Ph I_30092025.pdf27 Oct 2025
Form 3File: Form 3_Aspire Ph I_30092025.pdf27 Oct 2025
Disclosure of Sold and Booked InventoryFile: Aspire Ph I_Disclosure of sold unsold units_30092025.pdf27 Oct 2025
Form 5 (FY 2024-2025)File: Aspire Phase I.pdf16 Oct 2025
Form 2A (FY 2024-2025)File: Aspire Phase I.pdf30 Sep 2025
Form 1File: Form 1_Aspire Ph I_30062025.pdf18 Jul 2025
Form 2File: Form 2_Aspire Ph I_30062025.pdf18 Jul 2025
Form 3File: Form 3_Aspire Ph I_30062025.pdf18 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclsoure_Signed.pdf18 Jul 2025
Certificates of CA (Form 3)File: Form 3 - Aspire Ph I_310325_Revised.pdf8 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-Aspire Ph I_310325.pdf19 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Aspire Ph I_310325_signed.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-Aspire Ph I_310325.pdf19 Apr 2025
Certificates of CA (Form 3)File: Form 3 - Aspire Ph I_310325.pdf18 Apr 2025
Disclosure of sold/ booked inventoryFile: DISCLOSURE SIGNED.pdf18 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Aspire Phase I_SIGNED.pdf20 Jan 2025
Certificates of CA (Form 3)File: form 3 - Aspire-1 - SIGNED.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - ASPIRE PH I.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: DISCLOSURE_SIGNED.pdf20 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Aspir Phase I_signed.pdf12 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM I - ASPIRE PHASE I_SIGNED.pdf22 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Aspire Ph I.pdf21 Oct 2024
Certificates of CA (Form 3)File: Aspire 1_SIGNED.pdf19 Oct 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE_SIGNED.pdf19 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A ASPIRE I FY 22-23.pdf23 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A ASPIRE I FY 23-24.pdf23 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Aspire I.pdf22 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arihant Aspire Phase I.pdf20 Jul 2024
Disclosure of sold/ booked inventoryFile: Disclosure SIGNED.pdf20 Jul 2024
Certificates of CA (Form 3)File: FORM 3 30062024 Aspire 1 SIGNED.pdf20 Jul 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5_Aspire Phase 1_FY 22-23.pdf7 Jun 2024
Disclosure of sold/ booked inventoryFile: Aspire I - Dec 23 SIGNED.pdf28 May 2024
Disclosure of sold/ booked inventoryFile: Aspire I - Mar 24 SIGNED.pdf28 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Aspire Phase 1 31122023.PDF4 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Aspire Phase 1 31032024.PDF4 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Aspire Phase 1 31032024.pdf4 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM2 ASPIRE PH1 DEC2023.pdf3 May 2024
Certificates of CA (Form 3)File: Form 3 Aspire Phase 1 Dec 23 SIGN.pdf2 May 2024
Certificates of CA (Form 3)File: 31032024 Aspire Phase 1 SIGN.pdf2 May 2024
Disclosure of sold/ booked inventoryFile: Arihant Aspire Phase I.pdf20 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM I ASPIRE PHASE I -30 SEPTEMBER 2023.PDF19 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 RERA Aspire Ph I Sept 2023.pdf19 Oct 2023
Certificates of CA (Form 3)File: Aspire Phase-1.pdf19 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM2 RERA ASPIRE PH1 JUNE2023.pdf20 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARIHANT ASPIRE PHASE I - FORM 1 - ARCHITECT CERTIFICATE 30TH JUNE 2023.PDF19 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM I ARIHANT ASPIRE PHASE I 31 MARCH 2023.PDF21 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: aspire phase 1_31032023.PDF21 Apr 2023
Certificates of CA (Form 3)File: Aspire I_11zon (1).pdf21 Apr 2023
Certificates of CA (Form 3)File: AspireI300322.pdf18 Feb 2023
Certificates of CA (Form 3)File: AspireI300322.pdf18 Feb 2023
Certificates of CA (Form 3)File: AspireI300622.pdf18 Feb 2023
Certificates of CA (Form 3)File: AspireI300922.pdf18 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM1RERAASPIRE12020.PDF16 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM1RERAASPIRE12018.PDF16 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM1RERAASPIRE12019.PDF16 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM1RERAASPIRE12020.PDF16 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM1RERAASPIRE1MARCH2021.PDF16 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM1RERAASPIRE1MARCH2022.PDF16 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM1RERAASPIRE1MARCH2021.PDF16 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM1RERAASPIRE1JUNE2022.PDF16 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM1RERAASPIRE1DEC2022.PDF16 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM2RERAASPIRE1DEC22.PDF16 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM2RERAASPIRE1JUNE22.PDF16 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM2RERAASPIRE1MARCH22.PDF16 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM2RERAASPIRE1SEP22.PDF16 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM2RERAASPIRE12018.PDF16 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM2RERAASPIRE12019.PDF16 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM2RERAASPIRE12020.PDF16 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM2RERAASPIRE12021.PDF16 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM2RERAASPIRE1311221.PDF16 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM2RERAASPIRE1211221.PDF16 Feb 2023

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Arihant Aspire Phase IIIP52000056197Panvel, Raigarh319May 2024OngoingDec 2031Not due yet
ARIHANT ASPIRE PHASE IIP52000050712Panvel, Raigarh360Apr 2023OngoingDec 2030Not due yet

How this compares with Raigarh

92%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one moved by 12 months
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ARIHANT ASPIRE PHASE I on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Panvel5,900+ in Raigarh

2 kmARIHANT ASPIRE PHASE ICompleted 30Lapsed / revoked 10Other 20Dot size: filed unitsN

Filed coordinates, straight-line distance. 60 registered projects within 2 km.

Builder: ARIHANT ABODE LIMITED

ARIHANT ABODE LIMITED has 4 registrations on MahaRERA, including ARIHANT ASPIRE PHASE I and ARIHANT ASPIRE PHASE II. Its filings disclose 3 earlier MahaRERA projects, none completed yet. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if ARIHANT ASPIRE PHASE I is delayed beyond 30 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ARIHANT ASPIRE PHASE I?

The registered promoter entity is ARIHANT ABODE LIMITED, a company as per the filing. Its CIN U70102MH2009PLC197090 and GSTIN 27AAICA0612R1ZH can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ARIHANT ASPIRE PHASE I?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against ARIHANT ASPIRE PHASE I?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for ARIHANT ASPIRE PHASE I?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ARIHANT ASPIRE PHASE I?

The professionals named in the filing: Architect: YOGITA BHANDARKAR; Engineer: KALEEM SAYYAD; Engineer: YOGESH RAO; Chartered Accountant: ANJANI KUMAR GOYAL; Chartered Accountant: Ummed Jain & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ARIHANT ASPIRE PHASE I?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ARIHANT ASPIRE PHASE I. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ARIHANT ASPIRE PHASE I to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.