Red flags

  • Completion date moved by 30 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedmoved 30 months from the original
72 of 187Construction stages doneacross 17 buildings; furthest along: Internal walls, 98%
682 of 1,589Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 131 documents Report an error

Plot No -1 Sector - 28 Khandeshwar Railway Station is a Others project by CITY AND INDUSTRIAL DEVELOPMENT CORPORATION OF MAHARASHTRA LIMITED in Raigarh, Maharashtra, registered with MahaRERA as P52000028246 on 18 Feb 2021. Possession is promised by 31 Dec 2027. The completion date has moved by 30 months from the original filing. 907 of the 1,589 units on this registration are recorded sold or booked, and 72 of 187 construction stages are filed complete.

At a glance

Project

  • NamePlot No -1 Sector - 28 Khandeshwar Railway Station
  • TypeOthers
  • Location
    • Sector -28
    • Kamothe
    • Panvel
    • Raigarh
    • 410209
  • Pincode410209
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000028246
  • ReraGenie IDRG-MH-29258

Builder

  • NameCITY AND INDUSTRIAL DEVELOPMENT CORPORATION OF MAHARASHTRA LIMITED
  • Entity typeCompany
  • Authorized SignatoryAvinash Kashinath Patil
  • Other registrations21 more →
  • Completed7 of 22
  • No longer live2 lapsed, de-registered or revoked
  • Declared earlier projects7 →

Key dates

this monthRegisteredFeb 2021First promiseJun 2025Revised toDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on18 Feb 2021
  • Promised completion31 Dec 2027
  • Revised completionRevised to 31 Dec 2027 (originally 30 Jun 2025)
  • Buildings17 building records
  • Documents filed131 files

Current status

57%907 of 1,589 units booked
73.0%Work done, per cost certificate

Figures as on 15 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
E-B-01NA131282789
E -C-15NA131212013133
E-B-03NA131282789
E-B-04NA131282587
E-B-05NA131282789
E-B-06NA131282789
E-B-07NA131282688
E-B-08NA131282688
E-B-09NA131288088
E-B-10NA131289089
E-B-11NA131287087
E-B-12NA131282789
E-B-13NA131282789
E-B-14NA131282587
E-B-16NA131282688
E-B-17NA131282587
E-C-02NA131212013133

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building17

As on 15 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

72 of 187 construction stages are filed complete across 17 buildings. The stage furthest along is Internal walls, at 98%.

E-B-0128%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor40%
Slabs of Super Structure50%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks19%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
E -C-1550%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises31%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.16%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
E-B-0333%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor40%
Slabs of Super Structure75%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises5%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks45%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
E-B-0455%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.52%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
E-B-0553%
ActivityProgress
Excavation100%
Basement (if any)-
Podiums (if any)-
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises44%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.38%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
E-B-0654%
ActivityProgress
Excavation100%
Basement (if any)-
Podiums (if any)-
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises49%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.46%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
E-B-0765%
ActivityProgress
Excavation100%
Basement (if any)-
Podiums (if any)-
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises98%
Sanitary Fittings within the flats / premises20%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.84%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.15%
E-B-0864%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises97%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.20%
E-B-0969%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises55%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.98%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.10%
E-B-1043%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor70%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises19%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks70%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.14%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
E-B-1140%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor30%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises25%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks70%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.10%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
E-B-1259%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.66%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.5%
E-B-1359%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises73%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.69%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.5%
E-B-1460%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises71%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.79%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.5%
E-B-1648%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises25%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.5%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
E-B-1745%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises14%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks86%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
E-C-0231%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor40%
Slabs of Super Structure58%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises5%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks35%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 15 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes30%
Water SupplyYes20%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes25%
Storm Water DrainsYes38%
Landscaping & Tree PlantingYes2%
Street LightingYes26%
Community BuildingsYes55%
Treatment And Disposal Of Sewage And Sullage WaterYes25%
Solid Waste Management And DisposalYes25%
Water conservation /Rain water harvestingYes40%
Energy managemcntYes5%
Fire protection and fire safety requirementsYes10%
Electrical meter room, sub-station, receiving stationYes40%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed450

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots450
Closed/Covered61
Open Space389
BuildingClosed/CoveredOpen SpaceTotal
E-B-0142024
E -C-1523436
E-B-0342226
E-B-0442226
E-B-0542024
E-B-0632124
E-B-0742125
E-B-0842125
E-B-0942125
E-B-1042125
E-B-1142125
E-B-1232124
E-B-1342125
E-B-1442327
E-B-1642327
E-B-1732326
E-C-0223436

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area44,116 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityCITY AND INDUSTRIAL DEVELOPMENT CORPORATION OF MAHARASHTRA LIMITED
Permissible FSI93746.14
Proposed, not sanctioned52,001 sq m
Buildings approved17
Buildings sanctioned17

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKonkan Bhavan CBD Belapur
Estimated costRs 472.93 cr
Cost incurredRs 345.35 cr
Work done73.02%
BuildingWingEstimatedIncurred
E-B-01NARs 26.43 crRs 11.07 cr
E -C-15NARs 26.43 crRs 19.12 cr
E-B-03NARs 26.43 crRs 11.85 cr
E-B-04NARs 26.43 crRs 22.42 cr
E-B-05NARs 26.43 crRs 21.83 cr
E-B-06NARs 26.43 crRs 20.94 cr
E-B-07NARs 26.43 crRs 26.43 cr
E-B-08NARs 26.43 crRs 26.43 cr
E-B-09NARs 26.43 crRs 26.43 cr
E-B-10NARs 26.43 crRs 16.78 cr
E-B-11NARs 26.43 crRs 18.15 cr
E-B-12NARs 26.43 crRs 24.28 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectArchitect Hafeez Contractor
EngineerSandeep Shirke and Associates
EngineerSK Consultants & Engineers
Chartered AccountantRutuja Narsingh and Associates
Chartered AccountantNB Sayed & Associates
Chartered AccountantANUPAMA NARENDRA SHETTY
PartnerRole in project
CITY AND INDUSTRIAL DEVELOPMENT CORPORATION OF MAHARASHTRA LIMITED-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52000027665Jun 2025 → Dec 2030

Reason as filed by the promoterWe apologize for the delay in the completion of the project and the submission of this request. The delay has occurred due to issues with procurement, unforeseen site conditions, and coordination challenges. Despite these setbacks, we are working diligently to address these issues and complete the remaining work. We are closely monitoring progress and taking all necessary steps to ensure timely completion. Given the circumstances, we kindly request an extension until 31/12/2030 to complete the project and fulfil all regulatory requirements.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 25 Jan 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 19 Jan 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 11 Feb 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 19 Jan 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed131

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 131 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 - Khandeshwar Station as on March 2026.pdf15 May 2026
Withdrawal Update Form 2File: Form 2 - Khandeshwar Station as on March 2026 (Signed).pdf15 May 2026
Withdrawal Update Form 3File: Final Form 3 of Khandeshwar 31st March 2026.pdf15 May 2026
Withdrawal Update Form 1File: Form 1 - Khandeshwar Railway Station as on Dec 2025_.pdf11 Mar 2026
Withdrawal Update Form 2File: Form 2 - Khandeshwar Station as on Dec 2025.pdf11 Mar 2026
Withdrawal Update Form 3File: Final _Form 3 of Khandeshwar 31st December 2025.pdf11 Mar 2026
Form 5 (FY 2024-2025)File: Form 5 of Plot 01 Sector 28 Khandeshwar Station as on 31-03-2025.pdf24 Feb 2026
Form 5 (FY 2023-2024)File: Form 5 - Khandeshwar FY 2023-24.pdf24 Feb 2026
Building plan approvalFile: Khandeshwar - 1 Highlighted.pdf11 Feb 2026
Building plan approvalFile: Khandeshwar - 2.pdf11 Feb 2026
Building plan approvalFile: Khandeshwar - 3.pdf11 Feb 2026
Building plan approvalFile: Khandeshwar - 4.pdf11 Feb 2026
Building plan approvalFile: Khandeshwar - 5.pdf11 Feb 2026
Building plan approvalFile: Khandeshwar -6.pdf11 Feb 2026
Building plan approvalFile: Khandeshwar - 7.pdf11 Feb 2026
Building plan approvalFile: Khandeshwar - 8.pdf11 Feb 2026
Building plan approvalFile: Khandeshwar - 9.pdf11 Feb 2026
Building plan approvalFile: Khandeshwar - 10.pdf11 Feb 2026
Building plan approvalFile: Khandeshwar - 11.pdf11 Feb 2026
Building plan approvalFile: Khandeshwar - 12.pdf11 Feb 2026
Building plan approvalFile: Khandeshwar - 13.pdf11 Feb 2026
Building plan approvalFile: Khandeshwar - 14.pdf11 Feb 2026
Building plan approvalFile: Khandeshwar - 15.pdf11 Feb 2026
Building plan approvalFile: Khandeshwar - 16.pdf11 Feb 2026
Building plan approvalFile: Khandeshwar - 17.pdf11 Feb 2026
Building plan approvalFile: Khandeshwar - 18.pdf11 Feb 2026
Building plan approvalFile: Khandeshwar - 19.pdf11 Feb 2026
Form 1File: Form 1 - Khandeshwar Railway Station as on Sep 2025.pdf5 Nov 2025
Form 2File: Form 2 - Khandeshwar Railway Station as on Sep 2025.pdf5 Nov 2025
Form 3File: Form 3 - Khandeshwar Railway Station as on Sep 2025.pdf5 Nov 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 - Khandeshwar Railway Station as on Sep 2025.pdf5 Nov 2025
Form 1File: Form 1 - Khandeshwar Railway Station as on June 2025.pdf24 Jul 2025
Form 2File: Form 2 - Khandeshwar Railway Station as on June 2025.pdf24 Jul 2025
Form 3File: Form 3 - Khandeshwar Railway Station as on June 2025.pdf24 Jul 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 - Khandeshwar Railway Station as on June 2025.pdf24 Jul 2025
Declaration in FORM BFile: Form B.pdf2 Jul 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 - 20-21.pdf2 Jul 2025
Disclosure of sold/ booked inventoryFile: Scan--Knadheshwar Rly stn-C29.pdf2 Jul 2025
Declaration about Commencement CertificateFile: Format D.pdf2 Jul 2025
CERSAI detailsFile: Cersai declaration for the project namen--Khandeshwar.pdf2 Jul 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A.pdf2 Jul 2025
Other - TechnicalFile: PERT Chart_11zon (4).pdf2 Jul 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Annual report on statement of accounts.pdf2 Jul 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A.pdf2 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Khandeshwar Railway station as on March 2025_compressed.pdf27 Jun 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 of Khandeshwar Station as on 31st March, 2025.pdf27 Jun 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Khandeshwar - Dec 2022_1_11zon.pdf25 Jun 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Khandeshwar - Mar 2023_6_11zon.pdf25 Jun 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Khandeshwar - June 2023_4_11zon.pdf25 Jun 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Khandeshwar - Dec 2023_2_11zon.pdf25 Jun 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Khandeshwar - Sep 2023_9_11zon.pdf25 Jun 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Khandeshwar - Dec 2023_2_11zon.pdf25 Jun 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Khandeshwar - Mar 2024_7_11zon.pdf25 Jun 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Khandeshwar - June 2024_5_11zon.pdf25 Jun 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Khandeshwar - Sep 2024_10_11zon.pdf25 Jun 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Khandeshwar - Dec 2024_3_11zon.pdf25 Jun 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Khandeshwar - March 2025_8_11zon.pdf25 Jun 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: form 5 - khandes 2023-24.pdf25 Jun 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Khandeshwar - Dec 2022_1_11zon.pdf25 Jun 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Khandeshwar - Mar 2023_6_11zon.pdf25 Jun 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Khandeshwar - June 2023_4_11zon.pdf25 Jun 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Khandeshwar - Dec 2023_2_11zon.pdf25 Jun 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Khandeshwar - Sep 2023_9_11zon.pdf25 Jun 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Khandeshwar - Dec 2023_2_11zon.pdf25 Jun 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Khandeshwar - Mar 2024_7_11zon.pdf25 Jun 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Khandeshwar - June 2024_5_11zon.pdf25 Jun 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Khandeshwar - Sep 2024_10_11zon.pdf25 Jun 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Khandeshwar - Dec 2024_3_11zon.pdf25 Jun 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Khandeshwar - March 2025_8_11zon.pdf25 Jun 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: form 5 - khandes 2023-24.pdf25 Jun 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Khandeshwar - Dec 2022_1_11zon.pdf24 Jun 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: form 5 khan.pdf24 Jun 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 of Khandeshwar Station as on 31st December, 2022.pdf3 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 of Khandeshwar Station as on 31st March 2023.pdf3 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 of Khandeshwar Station as on 30th June 2023.pdf3 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 of Khandeshwar Station as on 30th September 2023.pdf3 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 of Khandeshwar Station as on 31st December, 2023.pdf3 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 of Khandeshwar Station as on 31st March 2024.pdf3 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 of Khandeshwar Station as on 30th June 2024.pdf3 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 of Khandeshwar Station as on 30th September 2024.pdf3 May 2025

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered late
ProjectLocationFlatsStatusPromisedDelivered
SWAPNAPOORTI HOUSING SCHEMEPlot No-2 Sector-36 Kharghar Navi Mumbai3,590CompletedMay 2015Late, Jun 2016
VALLEY SHILPHOUSINGSCHEMEPlot No-3 Sector36 Kharghar Navi Mumbai1,224CompletedMay 2014Late, May 2015

How this compares with Raigarh

57%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one moved by 30 months
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Plot No -1 Sector - 28 Khandeshwar Railway S on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kamothe5,900+ in Raigarh

2 kmPlot No -1 Sector - 28 KCompleted 67Lapsed / revoked 10Other 63Dot size: filed unitsN

Filed coordinates, straight-line distance. 140 registered projects within 2 km.

Builder: CITY AND INDUSTRIAL DEVELOPMENT CORPORATION OF MAHARASHTRA LIMITED

CITY AND INDUSTRIAL DEVELOPMENT CORPORATION OF MAHARASHTRA LIMITED has 22 registrations on MahaRERA, including SECTOR 21 TALOJA and SECTOR 22, TALOJA. Its filings disclose 7 earlier MahaRERA projects: declares 0 of 7 past projects completed on time. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if Plot No -1 Sector - 28 Khandeshwar Railway Station is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Plot No -1 Sector - 28 Khandeshwar Railway Station?

The registered promoter entity is CITY AND INDUSTRIAL DEVELOPMENT CORPORATION OF MAHARASHTRA LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Plot No -1 Sector - 28 Khandeshwar Railway Station?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Plot No -1 Sector - 28 Khandeshwar Railway Station?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Plot No -1 Sector - 28 Khandeshwar Railway Station?

The professionals named in the filing: Architect: Architect Hafeez Contractor; Engineer: Sandeep Shirke and Associates; Engineer: SK Consultants & Engineers; Chartered Accountant: Rutuja Narsingh and Associates; Chartered Accountant: NB Sayed & Associates; Chartered Accountant: ANUPAMA NARENDRA SHETTY. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Plot No -1 Sector - 28 Khandeshwar Railway Station?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Plot No -1 Sector - 28 Khandeshwar Railway Station. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Plot No -1 Sector - 28 Khandeshwar Railway S to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.