ReraGenieLog inGet a buyer report

Home / Browse projects / Raigarh, Maharashtra / HAWARE GRANDE

Registered No litigation declared Mixed project

HAWARE GRANDE

By HAWARE GRANDE

RG-MH-82629 · RERA PM1270002500678 · Last updated on MahaRERA portal: 27 Jul 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 4 months
  • 1 extension taken
  • Allotment letter deviates from the model form

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • All 1 earlier projects delivered on promise

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Nov 2030Possession promisedmoved 4 months from the original
4 of 70Construction stages doneacross 7 buildings; furthest along: Plinth, 75%
585 of 649Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 24 documents Report an error

HAWARE GRANDE is a Mixed project by HAWARE GRANDE in Raigarh, Maharashtra, registered with MahaRERA as PM1270002500678 on 1 Sep 2025. Possession is promised by 30 Nov 2030. The completion date has moved by 4 months from the original filing. 64 of the 649 units on this registration are recorded sold or booked, and 4 of 70 construction stages are filed complete.

At a glance

Project

  • NameHAWARE GRANDE
  • TypeMixed
  • Location
    • NATIONAL HIGHWAY NO 66
    • Pen (M Cl)
    • Pen
    • Raigarh
    • 402107
  • Pincode402107
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PM1270002500678
  • ReraGenie IDRG-MH-82629

Builder

  • NameHAWARE GRANDE
  • Entity typePartnership
  • GSTIN27AANFH3672G1Z4
  • PartnersUJJWALA SATISH HAWARE, ANIL KUMAR SINGH
  • Declared earlier projects1 →

Key dates

this monthRegisteredSep 2025First promiseJul 2030Revised toNov 2030

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on1 Sep 2025
  • Promised completion30 Nov 2030
  • Revised completionRevised to 30 Nov 2030 (originally 31 Jul 2030)
  • Buildings7 building records
  • Documents filed24 files

Current status

10%64 of 649 units booked
9.5%Work done, per cost certificate

Figures as on 27 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
1A15131200120
1B151396096
1C15131070107
1D151398098
1E15131230123
1HOTEL1411011
1COMMERCIAL430104104

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building7

As on 27 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 70 construction stages are filed complete across 7 buildings. The stage furthest along is Plinth, at 75%.

1 · wing A21%
ActivityProgress
Excavation100%
Basement (if any)60%
Podiums (if any)Not applicable
Plinth50%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
1 · wing B12%
ActivityProgress
Excavation100%
Basement (if any)20%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
1 · wing C2%
ActivityProgress
Excavation25%
Basement (if any)0%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
1 · wing D0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
1 · wing E0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
1 · wing HOTEL31%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)Not applicable
Plinth75%
Stilt Floor0%
Slabs of Super Structure9%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks25%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
1 · wing COMMERCIAL10%
ActivityProgress
Excavation60%
Basement (if any)20%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks20%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 27 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNo0%
Water SupplyNo0%
Sewerage (Chamber, Lines, Septic Tank , STP)No0%
Storm Water DrainsNo0%
Landscaping & Tree PlantingNo0%
Street LightingNo0%
Community BuildingsNo0%
Treatment And Disposal Of Sewage And Sullage WaterNo0%
Solid Waste Management And DisposalNo0%
Water conservation /Rain water harvestingNo0%
Energy managemcntNo0%
Fire protection and fire safety requirementsNo0%
Electrical meter room, sub-station, receiving stationNo0%
Aggregate area of recreational Open SpaceNo0%
Open ParkingNo0%

Parking filed276

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots276
Stilt / Ground107
Basement169
BuildingStilt / GroundBasementTotal
1 A24832
1 B19524
1 C21728
1 D19524
1 E24832
1 HOTEL05454
1 COMMERCIAL08282

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area16,230 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on13 Aug 2025

Approvals and building plan

Sanctioning authorityPEN MUNCIPAL COUNCIL
Permissible FSI50934.76
Proposed, not sanctioned50,748 sq m
Buildings approved3
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPLOT NO.74,SECTOR NO.17, PERSEPOLIS PREMISES C.O.H.S., VASHI,NEW MUMBAI 400 703
Estimated costRs 167.03 cr
Cost incurredRs 15.91 cr
Work done9.52%
BuildingWingEstimatedIncurred
1CRs 28.19 crRs 70.48 lakh
1ERs 27.55 cr-
1ARs 26.48 crRs 5.56 cr
1COMMERCIALRs 22.30 crRs 2.23 cr
1BRs 19.81 crRs 2.38 cr
1DRs 17.14 cr-
1HOTELRs 16.32 crRs 5.03 cr
-NARs 9.23 cr-

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSWAPNIL ARCH AND ASSOCIATES
EngineerEngineering Creations Consultancy I Pvt Ltd
EngineerS D ABHYANKAR
EngineerRAHUL N THAKARE
Chartered AccountantMugdha Bajaj
PartnerRole in project
HAWARE GRANDE-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

PM1270002500678/WarJul 2030 → Nov 2030

Reason as filed by the promoterNA

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportNot on the file

    A lawyer's report on who owns the land and what is registered against it.

  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 12 Aug 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 2 Aug 2025
  4. Commencement CertificateNot on the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Nov 2030

Documents filed24

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Architect certificate Haware Grande Q1 FY 2026 27.pdf27 Jul 2026
Withdrawal Update Form 2File: Engineer Certificate Haware Grande Q1 FY 2026 27.pdf27 Jul 2026
Withdrawal Update Form 3File: Withdrawal Application Form3 Q1 FY 2026 27 Signed.pdf27 Jul 2026
Withdrawal Update Form 1File: Form1 Architect Certificate.pdf28 Apr 2026
Withdrawal Update Form 2File: Form 2 Engineer certificate.pdf28 Apr 2026
Withdrawal Update Form 3File: Withdrawal Application Form3 - Q4 - FY 2025-26 - Signed.pdf28 Apr 2026
Form 2A (FY 2025-2026)File: Form 2A- Engineer Certificate.pdf4 Apr 2026
Withdrawal Update Form 1File: Architect Certificate Haware Grande Pen Q3--.pdf16 Jan 2026
Withdrawal Update Form 2File: Engineer Certificate Haware Grande Pen Q3--.pdf16 Jan 2026
Withdrawal Update Form 3File: Withdrawal Application Form3 Q3 FY 202526 signed---.pdf16 Jan 2026
Withdrawal Update Form 1File: SEPT 2025 ARCHITECT CERTIFICATE FORM 2 .pdf2 Dec 2025
Withdrawal Update Form 2File: SEPT 2025 FORM 2.pdf2 Dec 2025
Withdrawal Update Form 3File: SEPT 2025 FORM 3.pdf2 Dec 2025
Layout approvalFile: LAYOUT PLAN REV.pdf12 Aug 2025
Building plan approvalFile: GROUND FLOOR PLAN rev.pdf2 Aug 2025
Building plan approvalFile: 1ST FLOOR PLOOR.pdf1 Aug 2025
Building plan approvalFile: 2ND FLOOR PLAN.pdf1 Aug 2025
Building plan approvalFile: 3RD FLOOR PLAN.pdf1 Aug 2025
Building plan approvalFile: TYPICAL FLOOR PLAN .pdf1 Aug 2025
Building plan approvalFile: 7TH FLOOR PLAN -.pdf1 Aug 2025
Building plan approvalFile: 12TH FLOOR PLAN.pdf1 Aug 2025
Building plan approvalFile: 13TH FLOOR PLAN.pdf1 Aug 2025
Building plan approvalFile: ELEVATION & SECTIONS.pdf1 Aug 2025
Declaration and undertaking (Annexure A)File: ANNEXURE A ORDER NO 50_2024.pdf23 Jul 2025

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationRegisteredStatusPromisedDelivered
Haware AlturaP51800029411Vikhroli East, Mumbai SuburbanMay 2021CompletedApr 2026Mar 2024

How this compares with Raigarh

10%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one moved by 4 months
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep HAWARE GRANDE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Pen (M Cl)5,900+ in Raigarh

2 kmHAWARE GRANDECompleted 50Lapsed / revoked 21Other 20Dot size: filed unitsN

Filed coordinates, straight-line distance. 91 registered projects within 2 km.

Builder: HAWARE GRANDE

HAWARE GRANDE has 1 registration on MahaRERA, including HAWARE GRANDE. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if HAWARE GRANDE is delayed beyond 30 Nov 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of HAWARE GRANDE?

The registered promoter entity is HAWARE GRANDE, a partnership as per the filing. Its GSTIN 27AANFH3672G1Z4 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in HAWARE GRANDE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for HAWARE GRANDE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at HAWARE GRANDE?

The professionals named in the filing: Architect: SWAPNIL ARCH AND ASSOCIATES; Engineer: Engineering Creations Consultancy I Pvt Ltd; Engineer: S D ABHYANKAR; Engineer: RAHUL N THAKARE; Chartered Accountant: Mugdha Bajaj. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in HAWARE GRANDE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About HAWARE GRANDE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save HAWARE GRANDE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.