Home / Browse projects / Raigarh, Maharashtra / ARIHANT ADARSH PHASE I

Registered Litigation declared Others project

ARIHANT ADARSH PHASE I

By ARIHANT SUPERSTRUCTURES LIMITED

RG-MH-77018 · RERA P52000045699 · Last updated on MahaRERA portal: 17 Apr 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 4 cases
  • 5 complaints at MahaRERA
  • Completion date moved by 33 months
  • 1 extension taken
  • Rs 45.00 crore secured on the land, in favour of INDIA REAL ESTATE INVESTMENT FUND

Clear

  • Separate project account declared
  • Allotment letter follows the model form

5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2032Possession promisedmoved 33 months from the original
3 of 22Construction stages doneacross 2 buildings; furthest along: Stilt Floor, 50%
392 of 778Units unsoldnot recorded sold or booked
5Complaints at MahaRERAon this registration
Jump to the 107 documents Report an error

ARIHANT ADARSH PHASE I is a Others project by ARIHANT SUPERSTRUCTURES LIMITED in Raigarh, Maharashtra, registered with MahaRERA as P52000045699 on 6 Jun 2022. Possession is promised by 31 Dec 2032. The completion date has moved by 33 months from the original filing. 386 of the 778 units on this registration are recorded sold or booked, and 3 of 22 construction stages are filed complete. 5 complaints are on record with the regulator.

At a glance

Project

  • NameARIHANT ADARSH PHASE I
  • TypeOthers
  • Location
    • GHOT
    • PANVEL
    • Raigarh
    • 410208
  • Pincode410208
  • RERA no.P52000045699
  • ReraGenie IDRG-MH-77018

Builder

  • NameARIHANT SUPERSTRUCTURES LIMITED
  • Entity typeCompany
  • CINL51900MH1983PLC029643
  • GSTIN27AABCS1848L1Z2
  • CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • DirectorsASHOKKUMAR BHANWARLAL CHHAJER, PARTH ASHOKKUMAR CHHAJER
  • Other registrations13 more →
  • Completed5 of 14

Key dates

this monthRegisteredJun 2022First promiseMar 2030Revised toDec 2032

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on6 Jun 2022
  • Promised completion31 Dec 2032
  • Revised completionRevised to 31 Dec 2032 (originally 31 Mar 2030)
  • Buildings2 building records
  • Documents filed107 files

Current status

50%386 of 778 units booked
17.6%Work done, per cost certificate

Figures as on 17 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing ANA37363530353
Wing BNA37364250425

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 17 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Stilt Floor, at 50%.

Wing A27%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor50%
Slabs of Super Structure21%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises10%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks15%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Wing B14%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth50%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 17 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed522

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots522
Closed/Covered486
Open Space36
BuildingClosed/CoveredOpen SpaceTotal
Wing A2430243
Wing B24336279

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area4,041 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofINDIA REAL ESTATE INVESTMENT FUND
Secured amountRs 45.00 crore
CERSAI search filedYes
Declared on25 Jun 2025

Approvals and building plan

Sanctioning authorityPanvel Municipal Corporation
Permissible FSI43347.04
Proposed, not sanctioned43,347 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShop No 4, Arihant Auro Building, Opp Turbhe Railway Station, Turbhe MIDC, Thane-Belapur road, Navi Mumbai - 400705
Estimated costRs 168.82 cr
Cost incurredRs 29.72 cr
Work done17.6%
BuildingWingEstimatedIncurred
Wing ANARs 81.31 crRs 14.86 cr
Wing BNARs 81.31 crRs 14.86 cr
-NARs 6.21 cr-

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectYogita Bhandarkar
EngineerKALEEM SAYYAD
Chartered AccountantANJANI KUMAR GOYAL
Chartered AccountantUmmed Jain & Co.
PartnerRole in project
ARIHANT SUPERSTRUCTURES LIMITED-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52000019899Mar 2030 → Dec 2032

Reason as filed by the promoterIn accordance with circular no 28, we hereby apply for extension of our project u/s 7(3) in Format B. The project was delayed for reasons beyond our control on account of various reasons and more particularly on account of the pandemic of Covid-19. As we have 0 sold units, we do not require consents.

Litigation declared4

CaseCourtStatus
12/2025/2025NATIONAL GREEN TRIBUNAL BENCHOngoing
5096/2024/2024HIGH COURT MUMBAI BENCHOngoing
3987/2024/2024HIGH COURT MUMBAI BENCHOngoing
119/2025/2025HIGH COURT MUMBAI BENCHOngoing

Complaints filed with MahaRERA5

Case no.ComplainantRespondentFiled
CC12500551JAYSHRI B SHRIRAMEARIHANT SUPERSTRUCTURES LIMITED17/02/2025
CC12602225Faizal Altaf InamdarARIHANT SUPERSTRUCTURES LIMITED15/04/2026
CC12602226Faizal Altaf InamdarARIHANT SUPERSTRUCTURES LIMITED15/04/2026
SM12600282Bhakti AchrekarARIHANT SUPERSTRUCTURES LIMITED27/04/2026
CC12602452Rajni SinghARIHANT SUPERSTRUCTURES LIMITED26/04/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 25 May 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 5 Jun 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 5 Jun 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 18 May 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2032

Documents filed107

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 107 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: 4 Form 1_ADARSH_310326.pdf17 Apr 2026
Withdrawal Update Form 2File: Form 2_Adarsh Ph I_250326.pdf17 Apr 2026
Withdrawal Update Form 3File: 4 Form 3_Adarsh_250326.pdf17 Apr 2026
Withdrawal Update Form 1File: Form 1_Adarsh Phase I_31122025.pdf21 Jan 2026
Withdrawal Update Form 2File: Form 2_Adarsh Ph I_31122025.pdf21 Jan 2026
Withdrawal Update Form 3File: Form 3_Adarsh_31122025.pdf21 Jan 2026
Withdrawal Update Form 1File: Form 1_Adarsh Phase I_31122025.pdf20 Jan 2026
Withdrawal Update Form 2File: Form 2_Adarsh Ph I_31122025.pdf20 Jan 2026
Withdrawal Update Form 3File: Form 3_Adarsh_31122025.pdf20 Jan 2026
Withdrawal Update Form 1File: Form 1_ADARSH_30092025.pdf24 Oct 2025
Withdrawal Update Form 2File: Form 2_Adarsh_30092025.pdf24 Oct 2025
Withdrawal Update Form 3File: Form 3_Adarsh_30092025.pdf24 Oct 2025
Form 5 (FY 2024-2025)File: Adarsh Phase I.pdf17 Oct 2025
Form 2A (FY 2024-2025)File: Arihant Adarsh Phase I (1).pdf4 Oct 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-Adarsh Ph 1_310325.pdf19 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-Adarsh Ph I_150325.PDF18 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Adarsh Phase I_Form 3_15-03-2025.pdf17 Apr 2025
Disclosure of sold/ booked inventoryFile: DISCLOSURE SIGNED.pdf17 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Adarsh Phase I.pdf19 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Adarsh 1.pdf19 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Adarsh Ph I.pdf19 Jan 2025
Disclosure of sold/ booked inventoryFile: DISCLOSURE SIGNED.pdf19 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Adarsh Ph I.pdf21 Oct 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE_SIGNED.pdf21 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM I - ARIHANT ADARSH_SIGNED.pdf19 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Aadarsh_SIGNED.pdf19 Oct 2024
Details of encumbrancesFile: Adarsh Ph I - Finance Encumbrance Cert with Index II.pdf17 Oct 2024
Declaration in FORM BFile: Adarsh Ph I - Form B.pdf17 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Adarsh I.pdf22 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARIHANT ADARSH PHASE I.PDF20 Jul 2024
Disclosure of sold/ booked inventoryFile: Disclosure SIGNED.pdf20 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 30062024 Adarsh SIGNED.pdf20 Jul 2024
Building plan approvalFile: SHEET NO 02_compressed.pdf5 Jun 2024
Building plan approvalFile: SHEET NO 03_compressed.pdf5 Jun 2024
Building plan approvalFile: SHEET NO 04_compressed.pdf5 Jun 2024
Building plan approvalFile: SHEET NO 05_compressed.pdf5 Jun 2024
Building plan approvalFile: SHEET NO 06_compressed.pdf5 Jun 2024
Building plan approvalFile: SHEET NO 07_compressed.pdf5 Jun 2024
Building plan approvalFile: SHEET NO 08_compressed.pdf5 Jun 2024
Building plan approvalFile: SHEET NO 09_compressed.pdf5 Jun 2024
Building plan approvalFile: SHEET NO 10_compressed.pdf5 Jun 2024
Layout approvalFile: SHEET NO 01_compressed.pdf5 Jun 2024
Copy of Layout Approval (in case of layout)File: SHEET NO 01_compressed.pdf5 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: SHEET NO 02_compressed.pdf5 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: SHEET NO 03_compressed.pdf5 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: SHEET NO 04_compressed.pdf5 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: SHEET NO 05_compressed.pdf5 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: SHEET NO 06_compressed.pdf5 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: SHEET NO 07_compressed.pdf5 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: SHEET NO 08_compressed.pdf5 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: SHEET NO 09_compressed.pdf5 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: SHEET NO 10_compressed.pdf5 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1_Arihant Adarsh Phase 1.PDF1 Jun 2024
Disclosure of sold/ booked inventoryFile: Adarsh Phase 1_Disclosure of Sold Booked Inventory_310524_11zon.pdf1 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 31-05-2024.pdf31 May 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Aakarshan Ph 2 FY 22-23.pdf31 May 2024
Declaration in FORM BFile: Adarsh_Form B.pdf30 May 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Adarsh_Format A Bank Account Details.pdf29 May 2024
Commencement Certificates / NA Order for plotted developmentFile: CC LETTER.pdf18 May 2024
Declaration about Commencement CertificateFile: Format D.pdf18 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Aakarshan Ph 2 Form 2A 22-23.pdf18 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Aakarshan Ph 2 Form 2A 23-24.pdf18 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.PDF3 May 2024
Disclosure of sold/ booked inventoryFile: DISCOSURE OF SOLD BOOKED INVENTORY.PDF3 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.PDF28 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf28 Mar 2024
Other - LegalFile: Akarshan II_11zon (2).pdf17 Mar 2023
Other - FinanceFile: Akarshan II_11zon (2).pdf17 Mar 2023
Copy of the legal title reportFile: Title Certificate_Arihant Aakarshan Phase II_RERA.pdf25 May 2022
CERSAI detailsFile: CERSAI_Search_Report_Asset_Id_Based_200522.pdf25 May 2022
Proforma of Allotment letterFile: Arihant Akarshan Sale Agreement Phase 2.pdf25 May 2022
Declaration in FORM BFile: Form B_Aakarshan Phase II_RERA_Color.pdf13 May 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Aakarshan Phase II_RERA.pdf13 May 2022
Details of encumbrancesFile: Declaration for Encumbrances_Aakarshan Phase II_RERA.pdf28 Apr 2022
Declaration about Commencement CertificateFile: Declaratio for Commencement Certificate_Arihant Aakarshan Phase II.pdf28 Apr 2022
CERSAI detailsFile: Declaration for CERSAI_Aakarshan Phase II_RERA.pdf28 Apr 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Aakarshan Phase II.pdf27 Apr 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Aakarshan Phase II.pdf27 Apr 2022
Proforma of Allotment letterFile: Performa of the allotement letter_Arihant Aakarshan Phase II.pdf27 Apr 2022
Layout approvalFile: Layout Plan_Arihant Aakarshan Phase II.pdf25 Apr 2022

How this compares with Raigarh

50%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one moved by 33 months
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ARIHANT ADARSH PHASE I on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near PANVEL5,900+ in Raigarh

Builder: ARIHANT SUPERSTRUCTURES LIMITED

ARIHANT SUPERSTRUCTURES LIMITED has 14 registrations on MahaRERA, including ARIHANT ARSHIYA PHASE II and ARIHANT ARSHIYA PHASE III. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if ARIHANT ADARSH PHASE I is delayed beyond 31 Dec 2032?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ARIHANT ADARSH PHASE I?

The registered promoter entity is ARIHANT SUPERSTRUCTURES LIMITED, a company as per the filing. Its CIN L51900MH1983PLC029643 and GSTIN 27AABCS1848L1Z2 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ARIHANT ADARSH PHASE I?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against ARIHANT ADARSH PHASE I?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for ARIHANT ADARSH PHASE I?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ARIHANT ADARSH PHASE I?

The professionals named in the filing: Architect: Yogita Bhandarkar; Engineer: KALEEM SAYYAD; Chartered Accountant: ANJANI KUMAR GOYAL; Chartered Accountant: Ummed Jain & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ARIHANT ADARSH PHASE I?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ARIHANT ADARSH PHASE I. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ARIHANT ADARSH PHASE I to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.