COMMANDERS HEERA SIDDHI HOMES PHASE III
RG-MH-21620 · RERA P52000023450 · Last updated on MahaRERA portal: 24 Feb 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- 2 complaints at MahaRERA
- Completion date moved by 48 months
- 1 extension taken
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
COMMANDERS HEERA SIDDHI HOMES PHASE III is a Residential / Group Housing project by MEGAPLEX PROPERTIES LLP in Raigarh, Maharashtra, registered with MahaRERA as P52000023450 on 16 Dec 2019. Possession is promised by 30 Dec 2027. The completion date has moved by 48 months from the original filing. 63 of the 480 units on this registration are recorded sold or booked, and 28 of 88 construction stages are filed complete. 2 complaints are on record with the regulator.
At a glance
Project
- NameCOMMANDERS HEERA SIDDHI HOMES PHASE III
- TypeResidential / Group Housing
- Location
- NEAR ANTHONY GARAGE
- KARADE KHURD
- Karade Kh.
- Panvel
- Raigarh
- 410220
- Pincode410220
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52000023450
- ReraGenie IDRG-MH-21620
Builder
- NameMEGAPLEX PROPERTIES LLP
- Entity typePartnership
- PartnerSEEMA JAGDISH CHAUDHARI
- Other registrations1 more →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on16 Dec 2019
- Promised completion30 Dec 2027
- Revised completionRevised to 30 Dec 2027 (originally 30 Dec 2023)
- Buildings8 building records
- Documents filed75 files
Current status
Figures as on 24 Feb 2025, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| B5 | NA | 9 | 9 | 70 | 12 | 82 |
| B6 | NA | 9 | 9 | 70 | 0 | 70 |
| B7 | NA | 9 | 9 | 56 | 0 | 56 |
| B8 | NA | 9 | 9 | 63 | 0 | 63 |
| B9 | NA | 9 | 9 | 35 | 0 | 35 |
| B10 | NA | 9 | 9 | 35 | 0 | 35 |
| B11 | NA | 9 | 9 | 63 | 0 | 63 |
| B12 | NA | 9 | 9 | 70 | 6 | 76 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building8
As on 24 Feb 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
28 of 88 construction stages are filed complete across 8 buildings. The stage furthest along is Slabs of Super Structure, at 15%.
B527%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
B627%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
B727%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
B827%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
B927%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
B1047%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 15% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
B1147%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 15% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
B1227%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 24 Feb 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed8
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| B5 | 1 | 1 |
| B6 | 1 | 1 |
| B7 | 1 | 1 |
| B8 | 1 | 1 |
| B9 | 1 | 1 |
| B10 | 1 | 1 |
| B11 | 1 | 1 |
| B12 | 1 | 1 |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | AR DHARMESH V BHALANI |
| Engineer | VIJAY BABULAL CHAUDHARI |
| Engineer | SK Consultants & Engineers |
| Chartered Accountant | HEMANT SHETTY |
| Chartered Accountant | Rutuja Narsingh & Associates |
| Chartered Accountant | K HEMANT & CO |
| Partner | Role in project |
|---|---|
| MEGAPLEX PROPERTIES LLP | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterIn accordance with circular no 28, we hereby apply for extension of our project u/s 7(3) in Format B. The project was delayed for reasons beyond our control on account of various reasons and more particularly on account of the pandemic of Covid-19. We have consent of 53.42% allottees for purpose of extension of RERA registration period of the said project.
Complaints filed with MahaRERA2
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000408469 | Kaluram Sukhdev Gaikwad | Jagdish Madhukar Chaudhari | 28/12/2023 |
| CC12502598 | KALURAM SUKHDEV GAIKWAD | MEGAPLEX PROPERTIES LLP | 28/07/2025 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 4 Dec 2019 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 4 Dec 2019 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 4 Dec 2019 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 4 Dec 2019Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 30 Dec 2027
Documents filed75
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf | 24 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 23 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 23 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 23 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 23 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 23 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 (12).pdf | 27 Nov 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Phase 3.pdf | 29 Dec 2023 |
| Disclosure of sold/ booked inventoryFile: Circular 29.pdf | 26 Dec 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - COMMANDERS HEERA SIDDHI HOMES PHASE III as on June 2023.pdf | 21 Dec 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - COMMANDERS HEERA SIDDHI HOMES PHASE III as on Sep 2023.pdf | 21 Dec 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - CHS 3 June 23.pdf | 21 Dec 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - CHS 3 September.pdf | 21 Dec 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - COMMANDERS HEERA SIDDHI HOMES PHASE III as on June 2023.pdf | 21 Dec 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - COMMANDERS HEERA SIDDHI HOMES PHASE III as on Sep 2023.pdf | 21 Dec 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 - Commanders Heera siddhi Homes 3 June 23.pdf | 21 Dec 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 - Commanders Heera siddhi Homes 3 Sept 23.pdf | 21 Dec 2023 |
| Declaration about Commencement CertificateFile: DACC Format D PPH III.pdf | 16 Dec 2023 |
| Declaration in FORM BFile: Affidavit Ph3.pdf | 16 Dec 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECT CERTIFICATE 160323.pdf | 16 Dec 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECT CERTIFICATE 160623.pdf | 16 Dec 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECT CERTIFICATE 160923.pdf | 16 Dec 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECT CERTIFICATE 081223.pdf | 16 Dec 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Phase 3 19-20.pdf | 16 Dec 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A Phase 3 20-21.pdf | 16 Dec 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A Phase 3 21-22.pdf | 16 Dec 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Phase 3 22-23.pdf | 16 Dec 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Commanders Heera P-III Mar-23.pdf | 15 Dec 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Commanders Heera P-III as on Mar 2023.pdf | 15 Dec 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: March 21-22 Form 5.pdf | 19 Apr 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21).pdf | 28 Mar 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 31 March, 21 engineers certificate.pdf | 28 Mar 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 31 March 22 Engineer certificate.pdf | 28 Mar 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: March, FY 19-20 FORM 5.pdf | 28 Mar 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: 31 March, 21 engineers certificate.pdf | 28 Mar 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: 31 March 22 Engineer certificate.pdf | 28 Mar 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: MArch 20-21 FORM 5.pdf | 28 Mar 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: March 21-22 Form 5.pdf | 28 Mar 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Progrees report.pdf | 12 Jan 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architec PH III_compressed.pdf | 25 Jun 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Engineers Certificate PH III_compressed.pdf | 25 Jun 2021 |
| Disclosure of sold/ booked inventoryFile: Sold flat details CHSH PH III.pdf | 25 Jun 2021 |
| Layout approvalFile: Approved Plan 2.pdf | 4 Dec 2019 |
| Layout approvalFile: Approved Plan 3.pdf | 4 Dec 2019 |
| Layout approvalFile: Approved Plan 4.pdf | 4 Dec 2019 |
| Layout approvalFile: Approved Plan 5.pdf | 4 Dec 2019 |
| Layout approvalFile: Approved Plan 6.pdf | 4 Dec 2019 |
| Layout approvalFile: Approved Plan 7.pdf | 4 Dec 2019 |
| Layout approvalFile: Approved Plan 1.pdf | 4 Dec 2019 |
| Building plan approvalFile: NA Order RERA.pdf | 4 Dec 2019 |
| Copy of the legal title reportFile: Title and Search Report Phase III.pdf | 4 Dec 2019 |
| Copy of Layout Approval (in case of layout)File: Approved Plan 1.pdf | 4 Dec 2019 |
| Copy of Layout Approval (in case of layout)File: Approved Plan 2.pdf | 4 Dec 2019 |
| Copy of Layout Approval (in case of layout)File: Approved Plan 3.pdf | 4 Dec 2019 |
| Copy of Layout Approval (in case of layout)File: Approved Plan 4.pdf | 4 Dec 2019 |
| Copy of Layout Approval (in case of layout)File: Approved Plan 5.pdf | 4 Dec 2019 |
| Copy of Layout Approval (in case of layout)File: Approved Plan 6.pdf | 4 Dec 2019 |
| Copy of Layout Approval (in case of layout)File: Approved Plan 7.pdf | 4 Dec 2019 |
| Building Plan Approval / NA Order for plotted developmentFile: NA Order RERA.pdf | 4 Dec 2019 |
| Commencement Certificates / NA Order for plotted developmentFile: NA Order RERA.pdf | 4 Dec 2019 |
| Declaration in FORM BFile: Form B Affidavit Cum Declaration RERA.pdf | 4 Dec 2019 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate PHASE III RERA.pdf | 4 Dec 2019 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate RERA.pdf | 4 Dec 2019 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate RERA.pdf | 4 Dec 2019 |
| Proforma of Allotment letterFile: Allotment Letter Phase III.pdf | 4 Dec 2019 |
| Proforma of Allotment letterFile: Draft Agreement Phase III RERA.pdf | 4 Dec 2019 |
| OtherFile: B5 Wing Plan.pdf | 4 Dec 2019 |
| OtherFile: B6 And B7 Wing Plan.pdf | 4 Dec 2019 |
| OtherFile: B8 And B9 Wing Plan.pdf | 4 Dec 2019 |
| OtherFile: B10 And B11 Wing Plan.pdf | 4 Dec 2019 |
| OtherFile: B12 Wing Plan.pdf | 4 Dec 2019 |
| OtherFile: PPT.pdf | 4 Dec 2019 |
| OtherFile: Others Features of the Project.pdf | 4 Dec 2019 |
| PAN CardFile: Pan Card Megaplex.pdf | 21 Nov 2019 |
| Details of encumbrancesFile: Details of Encumbrances.pdf | 21 Nov 2019 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Raigarh
Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.
Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 75 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep COMMANDERS HEERA SIDDHI HOMES PHASE III on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near KARADE KHURD5,900+ in Raigarh
Filed coordinates, straight-line distance. 401 registered projects within 2 km.
GURUKRUPA HEIGHTS
GURUKRUPA CONSTRUCTION CO
COMMANDERS HEERA SIDDHI HOMES
MEGAPLEX PROPERTIES LLP
DIVA ANTILIA
DEEP SAGAR ENTERPRISES
SHREE SADGURU COMPLEX - PHASE III
EARTH HOME
SHREE SADGURU COMPLEX - PHASE IV
EARTH HOME
SHREE SADGURU COMPLEX BUILDING - 5
EARTH HOME
See every Raigarh project, with the district possession charts
Builder: MEGAPLEX PROPERTIES LLP
MEGAPLEX PROPERTIES LLP has 2 registrations on MahaRERA, including COMMANDERS HEERA SIDDHI HOMES and COMMANDERS HEERA SIDDHI HOMES PHASE III. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.
Frequently asked questions
What are my rights if COMMANDERS HEERA SIDDHI HOMES PHASE III is delayed beyond 30 Dec 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of COMMANDERS HEERA SIDDHI HOMES PHASE III?
The registered promoter entity is MEGAPLEX PROPERTIES LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in COMMANDERS HEERA SIDDHI HOMES PHASE III?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against COMMANDERS HEERA SIDDHI HOMES PHASE III?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for COMMANDERS HEERA SIDDHI HOMES PHASE III?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at COMMANDERS HEERA SIDDHI HOMES PHASE III?
The professionals named in the filing: Architect: AR DHARMESH V BHALANI; Engineer: VIJAY BABULAL CHAUDHARI; Engineer: SK Consultants & Engineers; Chartered Accountant: HEMANT SHETTY; Chartered Accountant: Rutuja Narsingh & Associates; Chartered Accountant: K HEMANT & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in COMMANDERS HEERA SIDDHI HOMES PHASE III?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback