Home / Browse projects / Raigarh, Maharashtra / ARIHANT CLAN AALISHAN PHASE II
ARIHANT CLAN AALISHAN PHASE II
By ARIHANT VATIKA REALTY PRIVATE LIMITED
RG-MH-49222 · RERA P52000017271 · Last updated on MahaRERA portal: 17 Apr 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Litigation declared, 4 cases
- 3 complaints at MahaRERA
Clear
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- All 1 earlier projects delivered on promise
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
ARIHANT CLAN AALISHAN PHASE II is a Residential / Group Housing project by ARIHANT VATIKA REALTY PRIVATE LIMITED in Raigarh, Maharashtra, registered with MahaRERA as P52000017271 on 27 Jul 2018. Possession is promised by 30 Dec 2027. 265 of the 515 units on this registration are recorded sold or booked, and 12 of 22 construction stages are filed complete. 3 complaints are on record with the regulator.
At a glance
Project
- NameARIHANT CLAN AALISHAN PHASE II
- TypeResidential / Group Housing
- Location
- PANVEL THANE VIA MUMBRA ROAD
- ROHINJAN
- Panvel
- Raigarh
- 410206
- Pincode410206
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52000017271
- ReraGenie IDRG-MH-49222
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on27 Jul 2018
- Promised completion30 Dec 2027
- Revised completionNone
- Buildings2 building records
- Documents filed123 files
Current status
Figures as on 17 Apr 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| BARAZ-II | NA | 54 | 48 | 375 | 0 | 375 |
| ZEENAT | NA | 54 | 47 | 140 | 0 | 140 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 17 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
12 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Internal walls, at 77%.
BARAZ-II78%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 77% |
| Sanitary Fittings within the flats / premises | 44% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 70% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 30% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 37% |
ZEENAT78%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 74% |
| Sanitary Fittings within the flats / premises | 44% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 70% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 30% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 41% |
Progress on shared amenities15
As on 17 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 40% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 100% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Parking filed529
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| BARAZ-II | 357 | 357 |
| ZEENAT | 172 | 172 |
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| SUPREME CONSTRUCTION AND DEVELOPERS PVT. LTD. | Mumbai City | Mumbai City |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| BARAZ-II | NA | Rs 98.59 cr | Rs 97.94 cr |
| ZEENAT | NA | Rs 98.59 cr | Rs 97.94 cr |
| - | NA | Rs 6.80 cr | - |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | YOGITA BHANDARKAR |
| Engineer | KALEEM SAYYAD |
| Engineer | YOGESH RAO |
| Chartered Accountant | ANJANI KUMAR GOYAL |
| Chartered Accountant | Ummed Jain & Co. |
| Partner | Role in project |
|---|---|
| ARIHANT VATIKA REALTY PRIVATE LIMITED | - |
Litigation declared4
| Case | Court | Status |
|---|---|---|
| 2016 | HIGH COURT BOMBAY | Closed |
| Special Civil Suit No 3/2018 | Civil Judge Senior Division at Panvel | Pending for argument for exhibit |
| 3/2018/2018 | CIVIL JUDGE SENIOR DIVISION | Ongoing |
| 21/2020/2020 | CIVIL JUDGE JUNIOR DIVISION | Ongoing |
Complaints filed with MahaRERA3
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000197421 | Mrs. Sujata Mahesh Padhghan & Mr. Mahesh Sankar Padghan | Promoter Rakesh Agarwal-Supreme Construction and Developers Pvt Ltd | 07/07/2021 |
| CC006000000292272 | Pravin Upreti | Arihant Vatika Realty Private Limited | 07/08/2022 |
| CC12602691 | SANTOSH REENAKSHI NAYAK | ARIHANT VATIKA REALTY PRIVATE LIMITED | 09/05/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 21 Jul 2018 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 1 Dec 2020 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 1 Dec 2020 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 1 Dec 2020Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 30 Nov 2020
Documents filed123
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 123 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: 16 Form 1_Aalishan Ph II_310326.pdf | 17 Apr 2026 |
| Withdrawal Update Form 2File: Form 2_Aalishan Ph II_250326.pdf | 17 Apr 2026 |
| Withdrawal Update Form 3File: 16 Form 3_ Aalishan Ph II_250326.pdf | 17 Apr 2026 |
| Withdrawal Update Form 1File: Form 1_Aalishan Ph II_31122025_signed.pdf | 28 Jan 2026 |
| Withdrawal Update Form 2File: Form 2_Aalishan Ph II_31122025.pdf | 28 Jan 2026 |
| Withdrawal Update Form 3File: Form 3_Aalishan Ph II_31122025.pdf | 28 Jan 2026 |
| Withdrawal Update Form 1File: Form 1_AALISHAN PHASE II_30092025.pdf | 18 Oct 2025 |
| Withdrawal Update Form 2File: Form 2_Aalishan Ph II_30092025.pdf | 18 Oct 2025 |
| Withdrawal Update Form 3File: Form 3_Aalishan Phase II_30092025.pdf | 18 Oct 2025 |
| Form 5 (FY 2024-2025)File: Aalishan Phase II.pdf | 17 Oct 2025 |
| Form 2A (FY 2024-2025)File: Aalishan Phase II.pdf | 4 Oct 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-Aalishan Ph II_310325.pdf | 19 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-Aalishan Ph II_310325_signed.pdf | 19 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-Aalishan Ph II_310325.pdf | 19 Apr 2025 |
| Certificates of CA (Form 3)File: Form 3 - Aalishan Ph II_310325_SIGNED.pdf | 18 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE SIGNED.pdf | 18 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Aalishan Phase II_Signed.pdf | 20 Jan 2025 |
| Certificates of CA (Form 3)File: Form 3 - Aalishan Ph II.pdf | 19 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Aalishan Ph II.pdf | 19 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE SIGNED.pdf | 19 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Aalishan Phase II_signed.pdf | 12 Nov 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Alishan Phase II FY 22-23.pdf | 11 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM I - AALISHAN PHASE II_SIGNED.pdf | 22 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Aalishan Ph II.pdf | 21 Oct 2024 |
| Certificates of CA (Form 3)File: Aalishan 2_SIGNED.pdf | 19 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE_SIGNED.pdf | 19 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A AALISHAN II FY 22-23.pdf | 23 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A AALISHAN II FY 23-24.pdf | 23 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Aalishan II.pdf | 22 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arihant Aalishan Phase II.pdf | 20 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure SIGNED.pdf | 20 Jul 2024 |
| Certificates of CA (Form 3)File: FORM 3 30062024 Aalishan II SIGNED.pdf | 20 Jul 2024 |
| Certificates of CA (Form 3)File: 31032024 Aalishan 2 SIGN.pdf | 23 Apr 2024 |
| Certificates of CA (Form 3)File: Aalishan Clan 2.pdf | 13 Feb 2024 |
| Certificates of CA (Form 3)File: Aalishan Phase-2.pdf | 7 Feb 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: 1 (9).pdf | 3 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Aalishan phase II - FORM I - ARCHITECT CERTIFICATE 31ST DECEMBER 2023.pdf | 20 Jan 2024 |
| Certificates of CA (Form 3)File: Aalishan II.pdf | 21 Jul 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARIHANT CLAN AALISHAN PHASE II - FORM I- ARCHITECT CERTIFICATE 30TH JUNE 2023.PDF | 19 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM2 RERA Aalishan 2 June 2023.pdf | 19 Jul 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM I CLAN AALISHAN PHASE II 31 MARCH 2023.PDF | 21 Apr 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Aalishan_phase2_31032023.PDF | 21 Apr 2023 |
| Certificates of CA (Form 3)File: Aalishan II_11zon.pdf | 21 Apr 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARIHANT AALISHAN PHASE II- 31 MARCH 2021.PDF | 16 Feb 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 21122021.pdf | 16 Feb 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Aalishan Phase 2 31122021 Architect Certificate.pdf | 16 Feb 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 31032022.pdf | 16 Feb 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 30062022.pdf | 16 Feb 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 30092022.pdf | 16 Feb 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Aalishan Phase2 31122022 Architect Certificate.pdf | 16 Feb 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Aalishan 21122021.PDF | 16 Feb 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Aalishan 31122021.PDF | 16 Feb 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Aalishan 31032022.PDF | 16 Feb 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Aalishan 30062022.PDF | 16 Feb 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Aalishan 30092022.PDF | 16 Feb 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Aalishan 31122022.PDF | 16 Feb 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERAFORM2AALISHANPH22019.PDF | 16 Feb 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERAFORM2AALISHANPH22020.PDF | 16 Feb 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERAFORM2AALISHANPH22021.PDF | 16 Feb 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Aalishan 30062022.PDF | 16 Feb 2023 |
| Certificates of CA (Form 3)File: Aalishan II 310319.PDF | 16 Feb 2023 |
| Certificates of CA (Form 3)File: 310320 aalishan.pdf | 16 Feb 2023 |
| Certificates of CA (Form 3)File: Aalishan II 310321.PDF | 16 Feb 2023 |
| Certificates of CA (Form 3)File: From 3 Arihant Aalishan Ph II 31122021.PDF | 16 Feb 2023 |
| Certificates of CA (Form 3)File: From 3 Arihant Aalishan Ph II 31032022 new.pdf | 16 Feb 2023 |
| Certificates of CA (Form 3)File: From 3 Arihant Aalishan Ph II 30062022 new.pdf | 16 Feb 2023 |
| Certificates of CA (Form 3)File: From 3 Arihant Aalishan Ph II 30092022.PDF | 16 Feb 2023 |
| Certificates of CA (Form 3)File: From 3 Arihant Aalishan Ph II 31122022 new.pdf | 16 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: form5 Aalishan PH 2 310322.pdf | 16 Feb 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARIHANT AALISHAN PHASE II- 31 MARCH 2019.PDF | 15 Feb 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARIHANT AALISHAN PHASE II- 31 MARCH 2020.PDF | 15 Feb 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: aalishan 2 2022.pdf | 19 Dec 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Arihant Aalishan Phase II.pdf | 22 Feb 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5_Aalishan II_19-20_RERA.pdf | 22 Jul 2021 |
| Layout approvalFile: Layout Plan_Aalishan.pdf | 1 Dec 2020 |
| Building plan approvalFile: 8.pdf | 1 Dec 2020 |
| Building plan approvalFile: 10.pdf | 1 Dec 2020 |
| Building plan approvalFile: 11.pdf | 1 Dec 2020 |
| Building plan approvalFile: 12.pdf | 1 Dec 2020 |
| Building plan approvalFile: 13.pdf | 1 Dec 2020 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| ARIHANT ANMOL PHASE I | JOUVELI BADLAPUR EAST | 434 | Completed | Oct 2016 | Oct 2016 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Raigarh
Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.
Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 8 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 123 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep ARIHANT CLAN AALISHAN PHASE II on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near ROHINJAN5,900+ in Raigarh
Filed coordinates, straight-line distance. 153 registered projects within 2 km.
SHREE RAM DELTA
Shreenathji Enterprises
Brillante
Callista Realty Limited
SAI SUNCITY PHASE 3
Chariot Properties LLP
ANANDAM PHASE - II
TODAY GLOBAL HOMES
Maximus Residency Phase-I
Superb Maa Developers LLP
Sai Vrindavan Dham
KT & LK SWEET HOMES
See every Raigarh project, with the district possession charts
Builder: ARIHANT VATIKA REALTY PRIVATE LIMITED
ARIHANT VATIKA REALTY PRIVATE LIMITED has 9 registrations on MahaRERA, including ARIHANT ANAIKA PHASE I and ARIHANT ANMOL PHASE II. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Raigarh district page.
Frequently asked questions
What are my rights if ARIHANT CLAN AALISHAN PHASE II is delayed beyond 30 Dec 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of ARIHANT CLAN AALISHAN PHASE II?
The registered promoter entity is ARIHANT VATIKA REALTY PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in ARIHANT CLAN AALISHAN PHASE II?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against ARIHANT CLAN AALISHAN PHASE II?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for ARIHANT CLAN AALISHAN PHASE II?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at ARIHANT CLAN AALISHAN PHASE II?
The professionals named in the filing: Architect: YOGITA BHANDARKAR; Engineer: KALEEM SAYYAD; Engineer: YOGESH RAO; Chartered Accountant: ANJANI KUMAR GOYAL; Chartered Accountant: Ummed Jain & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in ARIHANT CLAN AALISHAN PHASE II?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback