Home / Browse projects / Raigarh, Maharashtra / ARIHANT CLAN AALISHAN PHASE II

Registered Litigation declared Residential / Group Housing project

ARIHANT CLAN AALISHAN PHASE II

By ARIHANT VATIKA REALTY PRIVATE LIMITED

RG-MH-49222 · RERA P52000017271 · Last updated on MahaRERA portal: 17 Apr 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 4 cases
  • 3 complaints at MahaRERA

Clear

  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
12 of 22Construction stages doneacross 2 buildings; furthest along: Internal walls, 77%
250 of 515Units unsoldnot recorded sold or booked
3Complaints at MahaRERAon this registration
Jump to the 123 documents Report an error

ARIHANT CLAN AALISHAN PHASE II is a Residential / Group Housing project by ARIHANT VATIKA REALTY PRIVATE LIMITED in Raigarh, Maharashtra, registered with MahaRERA as P52000017271 on 27 Jul 2018. Possession is promised by 30 Dec 2027. 265 of the 515 units on this registration are recorded sold or booked, and 12 of 22 construction stages are filed complete. 3 complaints are on record with the regulator.

At a glance

Project

  • NameARIHANT CLAN AALISHAN PHASE II
  • TypeResidential / Group Housing
  • Location
    • PANVEL THANE VIA MUMBRA ROAD
    • ROHINJAN
    • Panvel
    • Raigarh
    • 410206
  • Pincode410206
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000017271
  • ReraGenie IDRG-MH-49222

Builder

  • NameARIHANT VATIKA REALTY PRIVATE LIMITED
  • Entity typeCompany
  • DirectorASHOKKUMAR BHANWARLAL CHHAJER
  • Other registrations8 more →
  • Completed7 of 9
  • Declared earlier projects1 →

Key dates

this monthRegisteredJul 2018PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on27 Jul 2018
  • Promised completion30 Dec 2027
  • Revised completionNone
  • Buildings2 building records
  • Documents filed123 files

Current status

51%265 of 515 units booked
96.0%Work done, per cost certificate

Figures as on 17 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BARAZ-IINA54483750375
ZEENATNA54471400140

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 17 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

12 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Internal walls, at 77%.

BARAZ-II78%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises77%
Sanitary Fittings within the flats / premises44%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks70%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.30%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.37%
ZEENAT78%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises74%
Sanitary Fittings within the flats / premises44%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks70%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.30%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.41%

Progress on shared amenities15

As on 17 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes40%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed529

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots529
Closed/Covered529
BuildingClosed/CoveredTotal
BARAZ-II357357
ZEENAT172172

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area8,124 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on19 Jun 2025
LandownerVillageDistrict
SUPREME CONSTRUCTION AND DEVELOPERS PVT. LTD.Mumbai CityMumbai City

Approvals and building plan

Sanctioning authorityPANVEL MUNICIPAL CORPORATION
Permissible FSI32487.4
Proposed, not sanctioned32,487 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSECTOR-17, VARDHMAN MARKET PREMISES CO-OPERATIVE SOCIETY, VASHI, NAVI MUMBAI - 400703
Estimated costRs 203.97 cr
Cost incurredRs 195.87 cr
Work done96.03%
BuildingWingEstimatedIncurred
BARAZ-IINARs 98.59 crRs 97.94 cr
ZEENATNARs 98.59 crRs 97.94 cr
-NARs 6.80 cr-

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectYOGITA BHANDARKAR
EngineerKALEEM SAYYAD
EngineerYOGESH RAO
Chartered AccountantANJANI KUMAR GOYAL
Chartered AccountantUmmed Jain & Co.
PartnerRole in project
ARIHANT VATIKA REALTY PRIVATE LIMITED-

Litigation declared4

CaseCourtStatus
2016HIGH COURT BOMBAYClosed
Special Civil Suit No 3/2018Civil Judge Senior Division at PanvelPending for argument for exhibit
3/2018/2018CIVIL JUDGE SENIOR DIVISIONOngoing
21/2020/2020CIVIL JUDGE JUNIOR DIVISIONOngoing

Complaints filed with MahaRERA3

Case no.ComplainantRespondentFiled
CC006000000197421Mrs. Sujata Mahesh Padhghan & Mr. Mahesh Sankar PadghanPromoter Rakesh Agarwal-Supreme Construction and Developers Pvt Ltd07/07/2021
CC006000000292272Pravin UpretiArihant Vatika Realty Private Limited07/08/2022
CC12602691SANTOSH REENAKSHI NAYAKARIHANT VATIKA REALTY PRIVATE LIMITED09/05/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 21 Jul 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 1 Dec 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 1 Dec 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 1 Dec 2020Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 30 Nov 2020

Documents filed123

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 123 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: 16 Form 1_Aalishan Ph II_310326.pdf17 Apr 2026
Withdrawal Update Form 2File: Form 2_Aalishan Ph II_250326.pdf17 Apr 2026
Withdrawal Update Form 3File: 16 Form 3_ Aalishan Ph II_250326.pdf17 Apr 2026
Withdrawal Update Form 1File: Form 1_Aalishan Ph II_31122025_signed.pdf28 Jan 2026
Withdrawal Update Form 2File: Form 2_Aalishan Ph II_31122025.pdf28 Jan 2026
Withdrawal Update Form 3File: Form 3_Aalishan Ph II_31122025.pdf28 Jan 2026
Withdrawal Update Form 1File: Form 1_AALISHAN PHASE II_30092025.pdf18 Oct 2025
Withdrawal Update Form 2File: Form 2_Aalishan Ph II_30092025.pdf18 Oct 2025
Withdrawal Update Form 3File: Form 3_Aalishan Phase II_30092025.pdf18 Oct 2025
Form 5 (FY 2024-2025)File: Aalishan Phase II.pdf17 Oct 2025
Form 2A (FY 2024-2025)File: Aalishan Phase II.pdf4 Oct 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-Aalishan Ph II_310325.pdf19 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-Aalishan Ph II_310325_signed.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-Aalishan Ph II_310325.pdf19 Apr 2025
Certificates of CA (Form 3)File: Form 3 - Aalishan Ph II_310325_SIGNED.pdf18 Apr 2025
Disclosure of sold/ booked inventoryFile: DISCLOSURE SIGNED.pdf18 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Aalishan Phase II_Signed.pdf20 Jan 2025
Certificates of CA (Form 3)File: Form 3 - Aalishan Ph II.pdf19 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Aalishan Ph II.pdf19 Jan 2025
Disclosure of sold/ booked inventoryFile: DISCLOSURE SIGNED.pdf19 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Aalishan Phase II_signed.pdf12 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Alishan Phase II FY 22-23.pdf11 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM I - AALISHAN PHASE II_SIGNED.pdf22 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Aalishan Ph II.pdf21 Oct 2024
Certificates of CA (Form 3)File: Aalishan 2_SIGNED.pdf19 Oct 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE_SIGNED.pdf19 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A AALISHAN II FY 22-23.pdf23 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A AALISHAN II FY 23-24.pdf23 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Aalishan II.pdf22 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arihant Aalishan Phase II.pdf20 Jul 2024
Disclosure of sold/ booked inventoryFile: Disclosure SIGNED.pdf20 Jul 2024
Certificates of CA (Form 3)File: FORM 3 30062024 Aalishan II SIGNED.pdf20 Jul 2024
Certificates of CA (Form 3)File: 31032024 Aalishan 2 SIGN.pdf23 Apr 2024
Certificates of CA (Form 3)File: Aalishan Clan 2.pdf13 Feb 2024
Certificates of CA (Form 3)File: Aalishan Phase-2.pdf7 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: 1 (9).pdf3 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Aalishan phase II - FORM I - ARCHITECT CERTIFICATE 31ST DECEMBER 2023.pdf20 Jan 2024
Certificates of CA (Form 3)File: Aalishan II.pdf21 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARIHANT CLAN AALISHAN PHASE II - FORM I- ARCHITECT CERTIFICATE 30TH JUNE 2023.PDF19 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM2 RERA Aalishan 2 June 2023.pdf19 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM I CLAN AALISHAN PHASE II 31 MARCH 2023.PDF21 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Aalishan_phase2_31032023.PDF21 Apr 2023
Certificates of CA (Form 3)File: Aalishan II_11zon.pdf21 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARIHANT AALISHAN PHASE II- 31 MARCH 2021.PDF16 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 21122021.pdf16 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Aalishan Phase 2 31122021 Architect Certificate.pdf16 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 31032022.pdf16 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 30062022.pdf16 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 30092022.pdf16 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Aalishan Phase2 31122022 Architect Certificate.pdf16 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Aalishan 21122021.PDF16 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Aalishan 31122021.PDF16 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Aalishan 31032022.PDF16 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Aalishan 30062022.PDF16 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Aalishan 30092022.PDF16 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Aalishan 31122022.PDF16 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERAFORM2AALISHANPH22019.PDF16 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERAFORM2AALISHANPH22020.PDF16 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERAFORM2AALISHANPH22021.PDF16 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Aalishan 30062022.PDF16 Feb 2023
Certificates of CA (Form 3)File: Aalishan II 310319.PDF16 Feb 2023
Certificates of CA (Form 3)File: 310320 aalishan.pdf16 Feb 2023
Certificates of CA (Form 3)File: Aalishan II 310321.PDF16 Feb 2023
Certificates of CA (Form 3)File: From 3 Arihant Aalishan Ph II 31122021.PDF16 Feb 2023
Certificates of CA (Form 3)File: From 3 Arihant Aalishan Ph II 31032022 new.pdf16 Feb 2023
Certificates of CA (Form 3)File: From 3 Arihant Aalishan Ph II 30062022 new.pdf16 Feb 2023
Certificates of CA (Form 3)File: From 3 Arihant Aalishan Ph II 30092022.PDF16 Feb 2023
Certificates of CA (Form 3)File: From 3 Arihant Aalishan Ph II 31122022 new.pdf16 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: form5 Aalishan PH 2 310322.pdf16 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARIHANT AALISHAN PHASE II- 31 MARCH 2019.PDF15 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARIHANT AALISHAN PHASE II- 31 MARCH 2020.PDF15 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: aalishan 2 2022.pdf19 Dec 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Arihant Aalishan Phase II.pdf22 Feb 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5_Aalishan II_19-20_RERA.pdf22 Jul 2021
Layout approvalFile: Layout Plan_Aalishan.pdf1 Dec 2020
Building plan approvalFile: 8.pdf1 Dec 2020
Building plan approvalFile: 10.pdf1 Dec 2020
Building plan approvalFile: 11.pdf1 Dec 2020
Building plan approvalFile: 12.pdf1 Dec 2020
Building plan approvalFile: 13.pdf1 Dec 2020

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
ARIHANT ANMOL PHASE IJOUVELI BADLAPUR EAST434CompletedOct 2016Oct 2016

How this compares with Raigarh

51%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ARIHANT CLAN AALISHAN PHASE II on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near ROHINJAN5,900+ in Raigarh

2 kmARIHANT CLAN AALISHAN PHCompleted 37Lapsed / revoked 34Other 82Dot size: filed unitsN

Filed coordinates, straight-line distance. 153 registered projects within 2 km.

Builder: ARIHANT VATIKA REALTY PRIVATE LIMITED

ARIHANT VATIKA REALTY PRIVATE LIMITED has 9 registrations on MahaRERA, including ARIHANT ANAIKA PHASE I and ARIHANT ANMOL PHASE II. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if ARIHANT CLAN AALISHAN PHASE II is delayed beyond 30 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ARIHANT CLAN AALISHAN PHASE II?

The registered promoter entity is ARIHANT VATIKA REALTY PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ARIHANT CLAN AALISHAN PHASE II?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against ARIHANT CLAN AALISHAN PHASE II?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for ARIHANT CLAN AALISHAN PHASE II?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ARIHANT CLAN AALISHAN PHASE II?

The professionals named in the filing: Architect: YOGITA BHANDARKAR; Engineer: KALEEM SAYYAD; Engineer: YOGESH RAO; Chartered Accountant: ANJANI KUMAR GOYAL; Chartered Accountant: Ummed Jain & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ARIHANT CLAN AALISHAN PHASE II?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ARIHANT CLAN AALISHAN PHASE II. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ARIHANT CLAN AALISHAN PHASE II to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.