Brillante
RG-MH-53023 · RERA P52000005604 · Last updated on MahaRERA portal: 5 Jun 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- 7 complaints at MahaRERA
Clear
- No litigation declared
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Brillante is a Others project by Callista Realty Limited in Raigarh, Maharashtra, registered with MahaRERA as P52000005604 on 11 Aug 2017. Possession is promised by 30 May 2028. 188 of the 902 units on this registration are recorded sold or booked, and 0 of 55 construction stages are filed complete. 7 complaints are on record with the regulator.
At a glance
Project
- NameBrillante
- TypeOthers
- Location
- Kolkhe
- Panvel
- Raigarh
- 410206
- Pincode410206
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52000005604
- ReraGenie IDRG-MH-53023
Builder
- NameCallista Realty Limited
- Entity typeCompany
- GSTIN27AAECC6230H1ZU
- Managing DirectorsVinayak Subhash Sonavane, Shobha Vinayak Sonavane, Sanjay Kumar KishanKumar Kedia
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on11 Aug 2017
- Promised completion30 May 2028
- Revised completionNone
- Buildings5 building records
- Documents filed174 files
Current status
Figures as on 5 Jun 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| RENTAL HOUSING BUILDING A1 | NA | 14 | 14 | 0 | 0 | 0 |
| Rental Housing Building- A2 | NA | 26 | 26 | 0 | 0 | 0 |
| Brillante Wing A | NA | 42 | 35 | 266 | 0 | 266 |
| Brillante Wing B | NA | 40 | 35 | 230 | 0 | 230 |
| Brillante Wing B1 | NA | 40 | 35 | 406 | 0 | 406 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building5
As on 5 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
0 of 55 construction stages are filed complete across 5 buildings. The stage furthest along is Excavation, at 0%.
RENTAL HOUSING BUILDING A10%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Rental Housing Building- A20%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Brillante Wing A0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Brillante Wing B0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Brillante Wing B10%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 5 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed943
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| RENTAL HOUSING BUILDING A1 | 18 | 0 | 18 |
| Rental Housing Building- A2 | 60 | 0 | 60 |
| Brillante Wing A | 200 | 20 | 220 |
| Brillante Wing B | 205 | 20 | 225 |
| Brillante Wing B1 | 400 | 20 | 420 |
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Brillante Wing B | NA | Rs 91.83 cr | - |
| RENTAL HOUSING BUILDING A1 | NA | Rs 60.59 cr | - |
| Rental Housing Building- A2 | NA | Rs 50.87 cr | - |
| Brillante Wing B1 | NA | Rs 19.86 cr | - |
| Brillante Wing A | NA | Rs 1.86 cr | - |
Certifying professionals and partners8
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | MS LENA GOSAVI |
| Architect | DIMENSIONS ARCHITECTS PVT LTD |
| Engineer | Mahadeo Rahate |
| Chartered Accountant | ASHISH MAHESHWARI & ASSOCIATES |
| Chartered Accountant | PODDAR A. & ASSOCIATES |
| Chartered Accountant | Ronak A Jain & Associates |
| Chartered Accountant | DNJ & Associates |
| Chartered Accountant | A V Santara & Co |
| Partner | Role in project |
|---|---|
| Callista Realty Limited | - |
Complaints filed with MahaRERA7
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000057654 | Mazdiyar Bharucha | M/s Callista Reality Pvt Ltd, Arun Kedia 9820049590 | 24/02/2019 |
| CC006000000193508 | Rajesh Kumar Swain | Callista Realty Limited | 07/08/2020 |
| CC006000000220970 | KiritKumar Bhavanishankar Joshi | Callista Realty Ltd | 26/04/2022 |
| CC12400810 | Manish Jain | Callista Realty Limited | 18/11/2024 |
| CC12501810 | SUJOY JAYANT GUPTA | Callista Realty Limited | 02/06/2025 |
| CC12501809 | SUJOY JAYANT GUPTA | Callista Realty Limited | 02/06/2025 |
| CC12501991 | Ketan Nandlal Dattani | Callista Realty Limited | 18/06/2025 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 31 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 31 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 31 Jul 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 12 Nov 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 30 May 2028
Documents filed174
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 174 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: 30-09-2017 form 1.pdf | 5 Jun 2026 |
| Form 2File: Form 2 Sept 17.pdf | 5 Jun 2026 |
| Form 3File: Form 3 Sept 2017.pdf | 5 Jun 2026 |
| Disclosure of Sold and Booked InventoryFile: Circular 29 Sept 2017.pdf | 5 Jun 2026 |
| Form 1File: 31-12-2017 form 1.pdf | 5 Jun 2026 |
| Form 2File: Form 2 Dec 17.pdf | 5 Jun 2026 |
| Form 3File: Form 3 Dec 2017.pdf | 5 Jun 2026 |
| Disclosure of Sold and Booked InventoryFile: Circular 29 Dec 2017.pdf | 5 Jun 2026 |
| Form 1File: 31-03-2018 form 1.pdf | 5 Jun 2026 |
| Form 2File: Form 2 Mar 18.pdf | 5 Jun 2026 |
| Form 3File: Form 3 March 2018.pdf | 5 Jun 2026 |
| Disclosure of Sold and Booked InventoryFile: Circular 29 March 2018.pdf | 5 Jun 2026 |
| Form 1File: 30-06-2018 form 1.pdf | 5 Jun 2026 |
| Form 2File: Form 2 June 18.pdf | 5 Jun 2026 |
| Form 3File: Form 3 June 2018_9_11zon.pdf | 5 Jun 2026 |
| Disclosure of Sold and Booked InventoryFile: Circular 29 June 2018_11zon.pdf | 5 Jun 2026 |
| Form 1File: 30-09-2018 form 1.pdf | 5 Jun 2026 |
| Form 2File: Form 2 Sept 18.pdf | 5 Jun 2026 |
| Form 3File: Form 3 Sept 2018_23_11zon.pdf | 5 Jun 2026 |
| Disclosure of Sold and Booked InventoryFile: Circular 29 Sept 2018_11zon.pdf | 5 Jun 2026 |
| Form 1File: 31-12-2018 form 1.pdf | 5 Jun 2026 |
| Form 2File: Form 2 Dec 18.pdf | 5 Jun 2026 |
| Form 3File: Form 3 Dec 2018_2_11zon.pdf | 5 Jun 2026 |
| Disclosure of Sold and Booked InventoryFile: Circular 29 Dec 2018_11zon.pdf | 5 Jun 2026 |
| Form 1File: 31-03-2019 form 1.pdf | 5 Jun 2026 |
| Form 2File: Form 2 Mar 19.pdf | 5 Jun 2026 |
| Form 3File: Form 3 March 2019.pdf | 5 Jun 2026 |
| Disclosure of Sold and Booked InventoryFile: Circular 29 March 2019_11zon.pdf | 5 Jun 2026 |
| Form 1File: 30-06-2019 form 1.pdf | 5 Jun 2026 |
| Form 2File: Form 2 June 19.pdf | 5 Jun 2026 |
| Form 3File: Form 3 June 2019_10_11zon.pdf | 5 Jun 2026 |
| Disclosure of Sold and Booked InventoryFile: Circular 29 June 2019_11zon.pdf | 5 Jun 2026 |
| Form 1File: 30-09-2019 from 1.pdf | 5 Jun 2026 |
| Form 2File: Form 2 Sept 19.pdf | 5 Jun 2026 |
| Form 3File: Form 3 Sept 2019_24_11zon.pdf | 5 Jun 2026 |
| Disclosure of Sold and Booked InventoryFile: Circular 29 Sept 2019_11zon.pdf | 5 Jun 2026 |
| Form 1File: 31-12-2019 form 1.pdf | 5 Jun 2026 |
| Form 2File: Form 2 Dec 19.pdf | 5 Jun 2026 |
| Form 3File: Form 3 Dec 2019_3_11zon.pdf | 5 Jun 2026 |
| Disclosure of Sold and Booked InventoryFile: Circular 29 Dec 2019_11zon.pdf | 5 Jun 2026 |
| Form 1File: 31-03-2020 form 1.pdf | 5 Jun 2026 |
| Form 2File: Form 2 Mar 20.pdf | 5 Jun 2026 |
| Form 3File: Form 3 March 2020.pdf | 5 Jun 2026 |
| Disclosure of Sold and Booked InventoryFile: Circular 29 Mar 2020_11zon.pdf | 5 Jun 2026 |
| Form 1File: 30-06-2020 form 1.pdf | 5 Jun 2026 |
| Form 2File: Form 2 June 20.pdf | 5 Jun 2026 |
| Form 3File: Form 3 June 2020_11_11zon.pdf | 5 Jun 2026 |
| Disclosure of Sold and Booked InventoryFile: Circular 29 June 2020_11zon.pdf | 5 Jun 2026 |
| Form 1File: 30-09-2020 form 1.pdf | 5 Jun 2026 |
| Form 2File: Form 2 Sept 20.pdf | 5 Jun 2026 |
| Form 3File: Form 3 Sept 2020_11zon.pdf | 5 Jun 2026 |
| Disclosure of Sold and Booked InventoryFile: Circular 29 Sept 2020_11zon.pdf | 5 Jun 2026 |
| Form 1File: 31-12-2020 form 1.pdf | 5 Jun 2026 |
| Form 2File: Form 2 Dec 20.pdf | 5 Jun 2026 |
| Form 3File: Form 3 Dec 2020_4_11zon.pdf | 5 Jun 2026 |
| Disclosure of Sold and Booked InventoryFile: Circular 29 Dec 2020_11zon.pdf | 5 Jun 2026 |
| Form 1File: 31-03-2021 form 1.pdf | 5 Jun 2026 |
| Form 2File: Form 2 Mar 21.pdf | 5 Jun 2026 |
| Form 3File: Form 3 March 2021_18_11zon.pdf | 5 Jun 2026 |
| Disclosure of Sold and Booked InventoryFile: Circular 29 March 2021_11zon.pdf | 5 Jun 2026 |
| Form 1File: 30-06-2021 from 1.pdf | 5 Jun 2026 |
| Form 2File: Form 2 June 21.pdf | 5 Jun 2026 |
| Form 3File: Form 3 June 2021_12_11zon.pdf | 5 Jun 2026 |
| Disclosure of Sold and Booked InventoryFile: Circular 29 June 2021_11zon.pdf | 5 Jun 2026 |
| Form 1File: 30-09-2021 form 1.pdf | 5 Jun 2026 |
| Form 2File: Form 2 Sept 21.pdf | 5 Jun 2026 |
| Form 3File: Form 3 Sept 2021_11zon.pdf | 5 Jun 2026 |
| Disclosure of Sold and Booked InventoryFile: Circular 29 Sept 2021_11zon.pdf | 5 Jun 2026 |
| Form 1File: 31-12-2021 form 1.pdf | 5 Jun 2026 |
| Form 2File: Form 2 Dec 21.pdf | 5 Jun 2026 |
| Form 3File: Form 3 Dec 2021_5_11zon.pdf | 5 Jun 2026 |
| Disclosure of Sold and Booked InventoryFile: Circular 29 Dec 2021_11zon.pdf | 5 Jun 2026 |
| Form 1File: 31-03-2022 form 1.pdf | 5 Jun 2026 |
| Form 2File: Form 2 Mar 22.pdf | 5 Jun 2026 |
| Form 3File: Form 3 March 2022.pdf | 5 Jun 2026 |
| Disclosure of Sold and Booked InventoryFile: Circular 29 March 2022_11zon.pdf | 5 Jun 2026 |
| Form 1File: 30-06-2022 form 1.pdf | 5 Jun 2026 |
| Form 2File: Form 2 June 22.pdf | 5 Jun 2026 |
| Form 3File: Form 3 June 2022_13_11zon.pdf | 5 Jun 2026 |
| Disclosure of Sold and Booked InventoryFile: Circular 29 June 2022_11zon.pdf | 5 Jun 2026 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Raigarh
Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.
Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 174 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Brillante on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Kolkhe5,900+ in Raigarh
Filed coordinates, straight-line distance. 61 registered projects within 2 km.
SHREE RAM DELTA
Shreenathji Enterprises
SAI SUNCITY PHASE 3
Chariot Properties LLP
ANANDAM PHASE - II
TODAY GLOBAL HOMES
Maximus Residency Phase-I
Superb Maa Developers LLP
Sai Vrindavan Dham
KT & LK SWEET HOMES
Golf Meadows Godrej City, Panvel
CAROA PROPERTIES LLP
See every Raigarh project, with the district possession charts
Builder: Callista Realty Limited
Callista Realty Limited has 1 registration on MahaRERA, including Brillante. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.
Frequently asked questions
What are my rights if Brillante is delayed beyond 30 May 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Brillante?
The registered promoter entity is Callista Realty Limited, a company as per the filing. Its GSTIN 27AAECC6230H1ZU can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Brillante?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Brillante?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Brillante?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Brillante?
The professionals named in the filing: Architect: MS LENA GOSAVI; Architect: DIMENSIONS ARCHITECTS PVT LTD; Engineer: Mahadeo Rahate; Chartered Accountant: ASHISH MAHESHWARI & ASSOCIATES; Chartered Accountant: PODDAR A. & ASSOCIATES; Chartered Accountant: Ronak A Jain & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Brillante?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback