ANANDAM PHASE - II
RG-MH-04327 · RERA P52000021559 · Last updated on MahaRERA portal: 21 Sep 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- 34 complaints at MahaRERA
- Completion date moved by 22 months
- 3 extensions taken
- Rs 70.00 crore secured on the land, in favour of AXIS FINANCE LIMITED
- The declared charge does not appear in the CERSAI report on the filing
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
ANANDAM PHASE - II is a Residential / Group Housing project by TODAY GLOBAL HOMES in Raigarh, Maharashtra, registered with MahaRERA as P52000021559 on 8 Jul 2019. Possession is promised by 30 Oct 2026. The completion date has moved by 22 months from the original filing. 440 of the 655 units on this registration are recorded sold or booked, and 29 of 44 construction stages are filed complete. 34 complaints are on record with the regulator.
At a glance
Project
- NameANANDAM PHASE - II
- TypeResidential / Group Housing
- Location
- ROHINJAN
- PANVEL
- Raigarh
- 410206
- Pincode410206
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52000021559
- ReraGenie IDRG-MH-04327
Builder
- NameTODAY GLOBAL HOMES
- Entity typePartnership
- PartnersBHADRESH RAJESH SHAH, BHAVESH RAJESH SHAH, SUNIL JAGDISH AGRAWAL, RAJESH BHOGILAL SHAH
- Other registrations3 more →
- Completed1 of 4
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on8 Jul 2019
- Promised completion30 Oct 2026
- Revised completionRevised to 30 Oct 2026 (originally 30 Dec 2024)
- Buildings4 building records
- Documents filed238 files
Current status
Figures as on 21 Sep 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| BUILDING NO - 4 | NA | 28 | 23 | 182 | 0 | 182 |
| BUILDING NO - 5A | NA | 31 | 25 | 130 | 0 | 130 |
| BUILDING NO - 5 B | NA | 31 | 26 | 213 | 0 | 213 |
| BUILDING NO - 5C | NA | 31 | 27 | 130 | 0 | 130 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building4
As on 21 Sep 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
29 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Internal walls, at 95%.
BUILDING NO - 4100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
BUILDING NO - 5A84%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 95% |
| Sanitary Fittings within the flats / premises | 50% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 95% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 80% |
BUILDING NO - 5 B85%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 95% |
| Sanitary Fittings within the flats / premises | 60% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 95% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 80% |
BUILDING NO - 5C83%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 80% |
| Sanitary Fittings within the flats / premises | 55% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 95% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 80% |
Progress on shared amenities15
As on 21 Sep 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 95% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 75% |
| Street Lighting | No | Not applicable |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 10% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Parking filed600
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| BUILDING NO - 4 | 150 | 150 |
| BUILDING NO - 5A | 150 | 150 |
| BUILDING NO - 5 B | 150 | 150 |
| BUILDING NO - 5C | 150 | 150 |
Land and ownership7
MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
| Landowner | Village | District |
|---|---|---|
| RAVINDRA PANDURANG PATIL | Rohinjan | Raigarh |
| ARCHANA RAGHUNATH PATIL | Panvel | Raigarh |
| KACHRU BHOKYA PATIL | Rohinjan | Raigarh |
| YOGESH YASHWANT PATIL | Rohinjan | Raigarh |
| BAIJUNATH VASANT PATIL | Rohinjan | Raigarh |
| GURUNATH VASANT PATIL | Rohinjan | Raigarh |
| SHRIPAT KALURAM PATIL | Rohinjan | Raigarh |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| BUILDING NO - 5 B | NA | Rs 59.33 cr | Rs 51.11 cr |
| BUILDING NO - 4 | NA | Rs 45.26 cr | Rs 45.26 cr |
| BUILDING NO - 5A | NA | Rs 34.37 cr | Rs 30.41 cr |
| BUILDING NO - 5C | NA | Rs 23.51 cr | Rs 23.04 cr |
| - | NA | Rs 5.00 cr | - |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | ACUBE ARCHITECTS |
| Engineer | STRUCTURAL CONCEPT DESIGNS PRIVATE LIMITED |
| Engineer | AADESH SHAH SHAH |
| Chartered Accountant | MAIDAWAT & ASSOCIATES |
| Chartered Accountant | CA SWATI |
| Chartered Accountant | Bhavik J Velani |
| Partner | Role in project |
|---|---|
| TODAY GLOBAL HOMES | - |
Extensions applied for3
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterShortage of Skilled Labor: In addition to the material shortages, the construction industry has also been severely impacted by an acute shortage of skilled labor, including masons, earthworkers, carpenters, plumbers, and other specialized trades. The COVID-19 pandemic has resulted in the migration of a large proportion of the labor force, particularly migrant workers, back to their native regions due to lockdowns, health concerns, and other social and economic factors. As a consequence, a substantial number of workers previously engaged on-site have been unable to return, thereby halting criti
Reason as filed by the promotercovid, planning authority delay
Reason as filed by the promoterNA
Complaints filed with MahaRERA34
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC12601517 | Shashikant Kedare | TODAY GLOBAL HOMES | 19/03/2026 |
| CC12501220 | Ravindra Ashok Kumbhavdekar | Today Global Homes | 12/04/2025 |
| CC12501972 | ASIT BARAN SAMUI | TODAY GLOBAL HOMES | 17/06/2025 |
| CC12504581 | SAMEER DIPAK KAPURE | TODAY GLOBAL HOMES | 22/12/2025 |
| CC12600448 | Shyjamol Sebastian | TODAY GLOBAL HOMES | 24/01/2026 |
| CC12600840 | DHIRAJ B MAGARE | TODAY GLOBAL HOMES | 14/02/2026 |
| CC12600837 | Sachin Agarwal | TODAY GLOBAL HOMES | 14/02/2026 |
| CC12600878 | Braja Kishore Rout | TODAY GLOBAL HOMES | 17/02/2026 |
| CC12600839 | Sachin Sopan Fulsundar | TODAY GLOBAL HOMES | 14/02/2026 |
| CC12600966 | RAJESH RANJAN | TODAY GLOBAL HOMES | 22/02/2026 |
| CC12600897 | Rajwinder Kaur Uppal | TODAY GLOBAL HOMES | 18/02/2026 |
| CC12600847 | Roshan Chandrahasa Karkera | TODAY GLOBAL HOMES | 15/02/2026 |
| CC12600874 | Lineesh Maliyakkal James | TODAY GLOBAL HOMES | 17/02/2026 |
| CC12601093 | Anuj Saxena | TODAY GLOBAL HOMES | 28/02/2026 |
| CC12600896 | Zinat Jahan Zuber Khan | TODAY GLOBAL HOMES | 18/02/2026 |
| CC12600972 | Bhupendra Shivaji Ahire | TODAY GLOBAL HOMES | 22/02/2026 |
| CC12601031 | Raghvendra Singh | TODAY GLOBAL HOMES | 25/02/2026 |
| CC12601008 | ASHUTOSH KUMAR | TODAY GLOBAL HOMES | 24/02/2026 |
| CC12601114 | Alok Omprakash Tule | TODAY GLOBAL HOMES | 01/03/2026 |
| CC12601142 | RAJIV RANJAN | TODAY GLOBAL HOMES | 02/03/2026 |
| CC12601188 | Fahim Chougle | TODAY GLOBAL HOMES | 04/03/2026 |
| CC12601190 | Binish Fahim Chougle | TODAY GLOBAL HOMES | 05/03/2026 |
| CC12601202 | Nitil Ashwin Joshi | TODAY GLOBAL HOMES | 05/03/2026 |
| CC12602511 | Ajay Vilas Parab | TODAY GLOBAL HOMES | 29/04/2026 |
| CC12601514 | Tarun Singh Aswal | TODAY GLOBAL HOMES | 19/03/2026 |
| CC12602011 | Abinash Kumar | TODAY GLOBAL HOMES | 05/04/2026 |
| CC12602312 | Sajid Shaikh | TODAY GLOBAL HOMES | 19/04/2026 |
| CC12602450 | Abhiruchi Anand | TODAY GLOBAL HOMES | 26/04/2026 |
| CC12603087 | Balram Chauhan | TODAY GLOBAL HOMES | 24/05/2026 |
| CC12602542 | SIYARAM SAH | TODAY GLOBAL HOMES | 01/05/2026 |
| CC12602631 | RAVINDRA CHANDRABHAN GODE | TODAY GLOBAL HOMES | 06/05/2026 |
| CC12603504 | Sanober Zaheer Khan | TODAY GLOBAL HOMES | 06/06/2026 |
| CC12604802 | Kanchan Pravin Madhavi | TODAY GLOBAL HOMES | 30/07/2026 |
| CC12605809 | Nazia Yakub Molkar | TODAY GLOBAL HOMES | 07/09/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 3 Jul 2019 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 25 May 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 21 Nov 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 25 May 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 30 Oct 2026
Documents filed238
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 238 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: FORM 1.pdf | 21 Sep 2026 |
| Withdrawal Update Form 2File: FORM 2.pdf | 21 Sep 2026 |
| Withdrawal Update Form 3File: FORM 3.pdf | 21 Sep 2026 |
| Form 5 (FY 2025-2026)File: Scan Form-5 TGH 1559.pdf | 27 Aug 2026 |
| Withdrawal Update Form 1File: 2332_001.pdf | 1 Jun 2026 |
| Withdrawal Update Form 2File: form 02.pdf | 1 Jun 2026 |
| Withdrawal Update Form 3File: 2335_001.pdf | 1 Jun 2026 |
| Form 2A (FY 2025-2026)File: form 2a (2).pdf | 1 Jun 2026 |
| Withdrawal Update Form 1File: form 02-1.pdf | 31 Jan 2026 |
| Withdrawal Update Form 2File: FORM 2_ JUNE 25_ ANANDAM PHASE II.pdf | 31 Jan 2026 |
| Withdrawal Update Form 3File: From-03_0001_compressed.pdf | 31 Jan 2026 |
| Withdrawal Update Form 1File: 01_ARCHITECT CERTIFICATE- WORK STATUS TILL SEPTEMBER 2025 (Anandam 1).pdf | 27 Dec 2025 |
| Withdrawal Update Form 2File: FORM 2_ JUNE 25_ ANANDAM PHASE II.pdf | 27 Dec 2025 |
| Withdrawal Update Form 3File: From-03_0001_compressed.pdf | 27 Dec 2025 |
| Form 2A (FY 2024-2025)File: ANANDAM PHASE 2_FORM 2A.pdf | 27 Dec 2025 |
| Form 5 (FY 2024-2025)File: Scan Form-5 TGH-559.pdf | 9 Oct 2025 |
| Withdrawal Update Form 1File: FORM 1_ JUNE 25_ ANANDAM PHASE II.pdf | 12 Sep 2025 |
| Withdrawal Update Form 2File: FORM 2_ JUNE 25_ ANANDAM PHASE II.pdf | 12 Sep 2025 |
| Withdrawal Update Form 3File: withdrawal update_ FORM 3_ JUNE 25_ ANANDAM PHASE II_compressed.pdf | 12 Sep 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1.pdf | 22 May 2025 |
| Certificates of CA (Form 3)File: Anandam I-Form 2 Q3_0001.pdf | 22 May 2025 |
| Certificates of CA (Form 3)File: Anandam I-Form 3 Q3_0001_compressed.pdf | 22 May 2025 |
| Certificates of CA (Form 3)File: Anandam I-Form 3_0001_compressed.pdf | 22 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Anandam I-Form 2 Q3_0001.pdf | 22 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Anandam I-Form 2_0001.pdf | 22 May 2025 |
| Disclosure of sold/ booked inventoryFile: inventory com.pdf | 22 May 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Anandam I-Form 2A_0001.pdf | 22 May 2025 |
| Declaration in FORM BFile: P52000021559_FileName_5.pdf | 21 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf | 1 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 14 Architect’s Certificate of Percentage of Completion of Work (Form 1) (1).pdf | 1 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 24 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf | 1 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 24 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf | 1 Jan 2025 |
| Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow | 1 Jan 2025 |
| Building plan approvalFile: PLAN.pdf | 21 Nov 2024 |
| Building plan approvalFile: PLAN.pdf | 21 Nov 2024 |
| Building Plan Approval (IOD)File: PLAN.pdf | 21 Nov 2024 |
| Building Plan Approval (IOD)File: PLAN.pdf | 21 Nov 2024 |
| Building plan approvalFile: 1_compressed.pdf | 29 Oct 2024 |
| Building Plan Approval (IOD)File: 1_compressed.pdf | 29 Oct 2024 |
| Certificates of CA (Form 3)File: form 3 Q2-1 revised_11zon (1).pdf | 26 Oct 2024 |
| Building plan approvalFile: 14.pdf | 25 Oct 2024 |
| Building plan approvalFile: 15.pdf | 25 Oct 2024 |
| Building plan approvalFile: 16.pdf | 25 Oct 2024 |
| Building plan approvalFile: 17.pdf | 25 Oct 2024 |
| Building plan approvalFile: 18.pdf | 25 Oct 2024 |
| Building plan approvalFile: 19.pdf | 25 Oct 2024 |
| Building plan approvalFile: 20.pdf | 25 Oct 2024 |
| Building plan approvalFile: 21.pdf | 25 Oct 2024 |
| Building plan approvalFile: 22.pdf | 25 Oct 2024 |
| Building plan approvalFile: 23.pdf | 25 Oct 2024 |
| Building plan approvalFile: 24.pdf | 25 Oct 2024 |
| Building plan approvalFile: 25.pdf | 25 Oct 2024 |
| Building plan approvalFile: 26.pdf | 25 Oct 2024 |
| Building plan approvalFile: 27.pdf | 25 Oct 2024 |
| Building plan approvalFile: 28.pdf | 25 Oct 2024 |
| Building plan approvalFile: 29.pdf | 25 Oct 2024 |
| Building plan approvalFile: 30.pdf | 25 Oct 2024 |
| Building plan approvalFile: 31.pdf | 25 Oct 2024 |
| Building plan approvalFile: 32.pdf | 25 Oct 2024 |
| Building plan approvalFile: 33.pdf | 25 Oct 2024 |
| Building plan approvalFile: 34.pdf | 25 Oct 2024 |
| Building plan approvalFile: 35.pdf | 25 Oct 2024 |
| Building plan approvalFile: 36.pdf | 25 Oct 2024 |
| Building plan approvalFile: 37.pdf | 25 Oct 2024 |
| Building plan approvalFile: 38.pdf | 25 Oct 2024 |
| Building plan approvalFile: 39.pdf | 25 Oct 2024 |
| Building plan approvalFile: 40.pdf | 25 Oct 2024 |
| Building plan approvalFile: 41.pdf | 25 Oct 2024 |
| Building plan approvalFile: 42.pdf | 25 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 01 ARCHITECT CERTIFICATE.pdf | 25 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 01 ARCHITECT CERTIFICATE.pdf | 25 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 01 ARCHITECT CERTIFICATE.pdf | 25 Oct 2024 |
| Certificates of CA (Form 3)File: FORM 03.pdf | 25 Oct 2024 |
| Building Plan Approval (IOD)File: 31.pdf | 25 Oct 2024 |
| Building Plan Approval (IOD)File: 30.pdf | 25 Oct 2024 |
| Building Plan Approval (IOD)File: 32.pdf | 25 Oct 2024 |
| Building Plan Approval (IOD)File: 33.pdf | 25 Oct 2024 |
| Building Plan Approval (IOD)File: 34.pdf | 25 Oct 2024 |
| Building Plan Approval (IOD)File: 35.pdf | 25 Oct 2024 |
| Building Plan Approval (IOD)File: 36.pdf | 25 Oct 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Raigarh
Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.
Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 5 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 3 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 238 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep ANANDAM PHASE - II on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near PANVEL5,900+ in Raigarh
Filed coordinates, straight-line distance. 87 registered projects within 2 km.
SHREE RAM DELTA
Shreenathji Enterprises
Brillante
Callista Realty Limited
SAI SUNCITY PHASE 3
Chariot Properties LLP
Maximus Residency Phase-I
Superb Maa Developers LLP
Sai Vrindavan Dham
KT & LK SWEET HOMES
Golf Meadows Godrej City, Panvel
CAROA PROPERTIES LLP
See every Raigarh project, with the district possession charts
Builder: TODAY GLOBAL HOMES
TODAY GLOBAL HOMES has 4 registrations on MahaRERA, including ANANDAM - PHASE I and ANANDAM PHASE - II. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.
Frequently asked questions
What are my rights if ANANDAM PHASE - II is delayed beyond 30 Oct 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of ANANDAM PHASE - II?
The registered promoter entity is TODAY GLOBAL HOMES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in ANANDAM PHASE - II?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against ANANDAM PHASE - II?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for ANANDAM PHASE - II?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at ANANDAM PHASE - II?
The professionals named in the filing: Architect: ACUBE ARCHITECTS; Engineer: STRUCTURAL CONCEPT DESIGNS PRIVATE LIMITED; Engineer: AADESH SHAH SHAH; Chartered Accountant: MAIDAWAT & ASSOCIATES; Chartered Accountant: CA SWATI; Chartered Accountant: Bhavik J Velani. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in ANANDAM PHASE - II?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback