Home / Browse projects / Raigarh, Maharashtra / SWARAJ COMPLEX
SWARAJ COMPLEX
RG-MH-07311 · RERA P52000054894 · Last updated on MahaRERA portal: 18 Apr 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.
See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SWARAJ COMPLEX is a Residential / Group Housing project by AMI REALTY DEVELOPERS LLP in Raigarh, Maharashtra, registered with MahaRERA as P52000054894 on 15 Feb 2024. Possession is promised by 31 Mar 2028. 217 of the 768 units on this registration are recorded sold or booked, and 24 of 132 construction stages are filed complete.
At a glance
Project
- NameSWARAJ COMPLEX
- TypeResidential / Group Housing
- Location
- POLADPUR
- Poladpur (Urban)
- Raigarh
- 402303
- Pincode402303
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52000054894
- ReraGenie IDRG-MH-07311
Builder
- NameAMI REALTY DEVELOPERS LLP
- Entity typePartnership
- PartnersMANISH MAHENDRA MODI, MAHENDRA JAYANTILAL MODI, AARTHI RAMAKRISHNAN, NARENDRA DEEPCHAND SHAH
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on15 Feb 2024
- Promised completion31 Mar 2028
- Revised completionNone
- Buildings12 building records
- Documents filed82 files
Current status
Figures as on 18 Apr 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| BUILDING NO 1 | NA | 9 | 8 | 64 | 0 | 64 |
| BUILDING NO 2 | NA | 9 | 8 | 64 | 0 | 64 |
| BUILDING NO 3 | NA | 9 | 8 | 64 | 0 | 64 |
| BUILDING NO 4 | NA | 9 | 8 | 64 | 0 | 64 |
| BUILDING NO 5 | NA | 9 | 8 | 64 | 0 | 64 |
| BUILDING NO 6 | NA | 9 | 8 | 64 | 0 | 64 |
| BUILDING NO 7 | NA | 9 | 8 | 64 | 0 | 64 |
| BUILDING NO 8 | NA | 9 | 8 | 64 | 0 | 64 |
| BUILDING NO 9 | NA | 9 | 8 | 64 | 0 | 64 |
| BUILDING NO 10 | NA | 9 | 8 | 64 | 0 | 64 |
| BUILDING NO 11 | NA | 9 | 8 | 64 | 0 | 64 |
| BUILDING NO 12 | NA | 9 | 8 | 64 | 0 | 64 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building12
As on 18 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
24 of 132 construction stages are filed complete across 12 buildings. The stage furthest along is Slabs of Super Structure, at 80%.
BUILDING NO 125%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 80% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUILDING NO 235%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 20% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 20% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 50% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUILDING NO 330%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 80% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 50% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUILDING NO 425%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 70% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUILDING NO 518%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUILDING NO 618%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUILDING NO 718%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUILDING NO 830%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 10% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 20% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUILDING NO 90%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUILDING NO 1031%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 20% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 20% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUILDING NO 1132%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 20% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 30% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUILDING NO 120%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 18 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed804
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Open Space | Total |
|---|---|---|
| BUILDING NO 1 | 67 | 67 |
| BUILDING NO 2 | 67 | 67 |
| BUILDING NO 3 | 67 | 67 |
| BUILDING NO 4 | 67 | 67 |
| BUILDING NO 5 | 67 | 67 |
| BUILDING NO 6 | 67 | 67 |
| BUILDING NO 7 | 67 | 67 |
| BUILDING NO 8 | 67 | 67 |
| BUILDING NO 9 | 67 | 67 |
| BUILDING NO 10 | 67 | 67 |
| BUILDING NO 11 | 67 | 67 |
| BUILDING NO 12 | 67 | 67 |
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| BUILDING NO 1 | NA | Rs 7.48 cr | Rs 2.45 cr |
| BUILDING NO 2 | NA | Rs 7.48 cr | Rs 2.45 cr |
| BUILDING NO 3 | NA | Rs 7.48 cr | Rs 2.45 cr |
| BUILDING NO 4 | NA | Rs 7.48 cr | Rs 2.45 cr |
| BUILDING NO 5 | NA | Rs 7.48 cr | Rs 2.45 cr |
| BUILDING NO 6 | NA | Rs 7.48 cr | Rs 2.45 cr |
| BUILDING NO 7 | NA | Rs 7.48 cr | Rs 2.45 cr |
| BUILDING NO 8 | NA | Rs 7.48 cr | Rs 2.45 cr |
| BUILDING NO 9 | NA | Rs 7.48 cr | - |
| BUILDING NO 10 | NA | Rs 7.48 cr | Rs 2.45 cr |
| BUILDING NO 11 | NA | Rs 7.48 cr | Rs 2.45 cr |
| BUILDING NO 12 | NA | Rs 7.48 cr | - |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | AJAY WADE |
| Engineer | NILESH RAMAKANT DIVEKAR |
| Chartered Accountant | DINESH J POKAR |
| Chartered Accountant | VISHAL GALA AND ASSOCIATES |
| Partner | Role in project |
|---|---|
| AMI REALTY DEVELOPERS LLP | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 16 Dec 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 29 Dec 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 30 Dec 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 16 Dec 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Mar 2028
Documents filed82
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 82 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form1.pdf | 18 Apr 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 18 Apr 2026 |
| Withdrawal Update Form 3File: Form 3.pdf | 18 Apr 2026 |
| Withdrawal Update Form 1File: Form 1.pdf | 2 Feb 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 2 Feb 2026 |
| Withdrawal Update Form 3File: Form 3_Final 1.pdf | 2 Feb 2026 |
| Form 5 (FY 2024-2025)File: Form 5.pdf | 13 Dec 2025 |
| Form 5 (FY 2023-2024)File: Form 5.pdf | 13 Dec 2025 |
| Withdrawal Update Form 1File: Form 1.pdf | 25 Oct 2025 |
| Withdrawal Update Form 2File: Form 2.pdf | 25 Oct 2025 |
| Withdrawal Update Form 3File: Form3.pdf | 25 Oct 2025 |
| Withdrawal Update Form 1File: Form 1.pdf | 14 Aug 2025 |
| Withdrawal Update Form 2File: Form 2.pdf | 14 Aug 2025 |
| Withdrawal Update Form 3File: Form 3 (1).pdf | 14 Aug 2025 |
| Withdrawal Update Form 1File: Form 1.pdf | 11 Aug 2025 |
| Withdrawal Update Form 2File: Form 2.pdf | 11 Aug 2025 |
| Withdrawal Update Form 3File: Form 3 (1).pdf | 11 Aug 2025 |
| Withdrawal Update Form 1File: Form 1.pdf | 6 Aug 2025 |
| Withdrawal Update Form 1File: Form 1.pdf | 6 Aug 2025 |
| Withdrawal Update Form 1File: Form 1.pdf | 6 Aug 2025 |
| Withdrawal Update Form 2File: Form 2.pdf | 6 Aug 2025 |
| Withdrawal Update Form 2File: Form 2.pdf | 6 Aug 2025 |
| Withdrawal Update Form 2File: Form 2.pdf | 6 Aug 2025 |
| Withdrawal Update Form 3File: Form 3 (1).pdf | 6 Aug 2025 |
| Withdrawal Update Form 3File: Form 3 (1).pdf | 6 Aug 2025 |
| Withdrawal Update Form 3File: Form 3 (1).pdf | 6 Aug 2025 |
| Form 1File: Form 1_31st December 2024.pdf | 18 Jun 2025 |
| Form 2File: Form 2_31st December 2024.pdf | 18 Jun 2025 |
| Form 3File: Form 3 31st March 2025.pdf | 18 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: QPR - 31st March 2025.pdf | 18 Jun 2025 |
| Form 1File: Form 1_31st March 2025.pdf | 18 Jun 2025 |
| Form 2File: Form 2_31st March 2025.pdf | 18 Jun 2025 |
| Form 3File: Form 3 31st March 2025.pdf | 18 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: QPR - 31st March 2025.pdf | 18 Jun 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5.pdf | 7 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 8 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 8 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 (1).pdf | 8 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 8 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 (1).pdf | 8 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 8 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 22 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 22 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 (1).pdf | 22 May 2024 |
| Deviation Report with respect to model copy of AgreementFile: No Deviation In Agreement For Sale.pdf | 20 Jan 2024 |
| Building plan approvalFile: 2.pdf | 30 Dec 2023 |
| Building plan approvalFile: 3.pdf | 30 Dec 2023 |
| Building plan approvalFile: 4.pdf | 30 Dec 2023 |
| Building plan approvalFile: 5.pdf | 30 Dec 2023 |
| Building plan approvalFile: 6.pdf | 30 Dec 2023 |
| Building plan approvalFile: 7.pdf | 30 Dec 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 2.pdf | 30 Dec 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 3.pdf | 30 Dec 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 4.pdf | 30 Dec 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 5.pdf | 30 Dec 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 6.pdf | 30 Dec 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 7.pdf | 30 Dec 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Rera Carpet area.pdf | 30 Dec 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FINAL FORM 3.pdf | 30 Dec 2023 |
| Layout approvalFile: LAYOUT APPROVAL 1.pdf | 29 Dec 2023 |
| Layout approvalFile: LAYOUT APPROVAL 2.pdf | 29 Dec 2023 |
| Copy of Layout Approval (in case of layout)File: LAYOUT APPROVAL 1.pdf | 29 Dec 2023 |
| Copy of Layout Approval (in case of layout)File: LAYOUT APPROVAL 2.pdf | 29 Dec 2023 |
| Declaration in FORM BFile: Revised Affidavit Cum Declaration form B.pdf | 29 Dec 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Percentage Completion.pdf | 29 Dec 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Signed.pdf | 29 Dec 2023 |
| CERSAI detailsFile: Undertaking For No Cersai Report.pdf | 29 Dec 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Int in Other Real Estate Org.pdf | 29 Dec 2023 |
| Proforma of Agreement for saleFile: AGREEMENT FOR SALE 20012024.pdf | 29 Dec 2023 |
| Proforma of Allotment letterFile: ALLOTMENT LETTER 20012024.pdf | 29 Dec 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: DECLARATION FOR BANK ACCOUNT.pdf | 29 Dec 2023 |
| Deviation Report with respect to Allotment letterFile: No Deviation In Allotment Letter.pdf | 29 Dec 2023 |
| Details of encumbrances concerned to FinanceFile: Declaration of No Encumbrances concerned to Finance for Project Swaraj Complex.pdf | 18 Dec 2023 |
| Details of encumbrances concerned to FinanceFile: Declaration of No Encumbrances concerned to Legal for Project Swaraj Complex.pdf | 18 Dec 2023 |
| Details of encumbrances concerned to LegalFile: Declaration of No Encumbrances concerned to Finance for Project Swaraj Complex.pdf | 18 Dec 2023 |
| Details of encumbrances concerned to LegalFile: Declaration of No Encumbrances concerned to Legal for Project Swaraj Complex.pdf | 18 Dec 2023 |
| Building plan approvalFile: 1.pdf | 16 Dec 2023 |
| PAN CardFile: Ami Realty Developers LLP - Pan Card.pdf | 16 Dec 2023 |
| Copy of the legal title reportFile: SEARCH REPORT.pdf | 16 Dec 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 1.pdf | 16 Dec 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Raigarh
Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.
Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 82 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep SWARAJ COMPLEX on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near POLADPUR5,900+ in Raigarh
MANGALMURTI PARK
ELANZA DEVELOPER
SIDDHI SAMRUDDHI RESIDENCY
SURENDRA KASHIRAM CHAVAN
SHIV PLAZA
GAIKWAD BUILDERS AND DEVELOPERS
SHREE SAMARTH KRUPA A/B WING
RAJESH SHANTARAM MAHADIK
RAMCHANDRA NANA APPARTMENT
SANJAY NANA JADHAV
NANA SADAN
SANJAY NANA JADHAV
See every Raigarh project, with the district possession charts
Builder: AMI REALTY DEVELOPERS LLP
AMI REALTY DEVELOPERS LLP has 1 registration on MahaRERA, including SWARAJ COMPLEX. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.
Frequently asked questions
What are my rights if SWARAJ COMPLEX is delayed beyond 31 Mar 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SWARAJ COMPLEX?
The registered promoter entity is AMI REALTY DEVELOPERS LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SWARAJ COMPLEX?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SWARAJ COMPLEX?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SWARAJ COMPLEX?
The professionals named in the filing: Architect: AJAY WADE; Engineer: NILESH RAMAKANT DIVEKAR; Chartered Accountant: DINESH J POKAR; Chartered Accountant: VISHAL GALA AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SWARAJ COMPLEX?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback