AeroEstate
By HOABL Landmark Realty Private Limited
RG-MH-19376 · RERA P52000078507 · Last updated on MahaRERA portal: 17 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- 4 complaints at MahaRERA
- Rs 975.00 crore secured on the land, in favour of HDFC CAPITAL AFFORDABLE REAL ESTATE FUND THREE
Clear
- No litigation declared
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
AeroEstate is a Plotted project by HOABL Landmark Realty Private Limited in Raigarh, Maharashtra, registered with MahaRERA as P52000078507 on 19 Dec 2024. Possession is promised by 31 Dec 2028. 378 of the 589 units on this registration are recorded sold or booked. 4 complaints are on record with the regulator.
At a glance
Project
- NameAeroEstate
- TypePlotted
- Location
- NH 548/A
- Village Khambewadi
- Taluka Khalapur
- Khambewadi
- Khalapur
- Raigarh
- 410203
- Pincode410203
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52000078507
- ReraGenie IDRG-MH-19376
Builder
- NameHOABL Landmark Realty Private Limited
- Entity typeCompany
- DirectorsRakesh Gupta, Sagar Gawde
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on19 Dec 2024
- Promised completion31 Dec 2028
- Revised completionNone
- BuildingsNot stated in filing
- Documents filed95 files
Current status
Figures as on 17 Jul 2026, this project's latest MahaRERA filing.
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 17 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
NA Plot Without Structure:
| Activity | Progress |
|---|---|
| Excavation | Not applicable |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | Not applicable |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | Not applicable |
| Sanitary Fittings within the flats / premises | Not applicable |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | Not applicable |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | Not applicable |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | Not applicable |
Progress on shared amenities15
As on 17 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 5% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | No | Not applicable |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Land and ownership
A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| - | NA | Rs 97.96 cr | Rs 2.75 cr |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Sanjay Jain |
| Engineer | Akil Ahmad |
| Chartered Accountant | Udal Mishra |
| Chartered Accountant | Chirag Sarvaiya |
| Chartered Accountant | Mahadev Sawant & Co |
| Partner | Role in project |
|---|---|
| HOABL Landmark Realty Private Limited | - |
Complaints filed with MahaRERA4
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC12502294 | MOHAMMED AFZAL CHOUDHARY | RANA CHOUDHARY | 07/07/2025 |
| CC12600782 | Suraj Ramkumar Suthar | HOABL Landmark Realty Private Limited | 11/02/2026 |
| CC12600961 | Ayush Kumar | HOABL Landmark Realty Private Limited | 22/02/2026 |
| CC12601273 | Anil Valerian Noronha | HOABL Landmark Realty Private Limited | 09/03/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 28 Nov 2024 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 24 Sep 2025 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 26 Sep 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 10 Dec 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2028
Documents filed95
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 95 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1_Signed.pdf | 17 Jul 2026 |
| Withdrawal Update Form 2File: Form 2_Signed.pdf | 17 Jul 2026 |
| Withdrawal Update Form 3File: Form 3_Signed.pdf | 17 Jul 2026 |
| Form 2A (FY 2025-2026)File: Form-2A_EC_Signed.pdf | 22 Jun 2026 |
| Withdrawal Update Form 1File: Architect Certificate_AeroEstate_Signed.pdf | 20 Apr 2026 |
| Withdrawal Update Form 2File: Engineer Certificate_AeroEstate_Signed.pdf | 20 Apr 2026 |
| Withdrawal Update Form 3File: CA Certificate_AeroEstate_Signed.pdf | 20 Apr 2026 |
| Withdrawal Update Form 1File: Aeroestate - Architect Certificate.pdf | 20 Jan 2026 |
| Withdrawal Update Form 2File: Aeroestate - Engineer Certificate.pdf | 20 Jan 2026 |
| Withdrawal Update Form 3File: Aeroestate - CA Certificate.pdf | 20 Jan 2026 |
| Withdrawal Update Form 1File: Architect Certificate_AeroEstate_Signed.pdf | 20 Oct 2025 |
| Withdrawal Update Form 2File: Engineer Certificate_AeroEstate_Signed.pdf | 20 Oct 2025 |
| Withdrawal Update Form 3File: CA Certificate_AeroEstate_.pdf | 20 Oct 2025 |
| Form 5 (FY 2024-2025)File: Form 5_AeroEstate - 2024-25.pdf | 29 Sep 2025 |
| Declaration and undertaking (Annexure A)File: Annexure A - One plot one registration_Final.pdf | 27 Sep 2025 |
| Building plan approval or NA orderFile: AeroEstate - Demarcated plan_compressed_organized.pdf | 26 Sep 2025 |
| Layout approvalFile: Khambewadi Collector Plan compressed.pdf | 24 Sep 2025 |
| Building plan approval or NA orderFile: Khambewadi Collector NA Order compressed.pdf | 24 Sep 2025 |
| Building plan approval or NA orderFile: Khambewadi Collector Plan compressed.pdf | 24 Sep 2025 |
| Withdrawal Update Form 1File: AeroEstate-Architect certificate-June25_signed.pdf | 24 Sep 2025 |
| Withdrawal Update Form 2File: AeroEstate-Engineer certificate-June25_Signed.pdf | 24 Sep 2025 |
| Withdrawal Update Form 3File: AeroEstate-CA Certificate-June25_Signed.pdf | 24 Sep 2025 |
| Form 2A (FY 2024-2025)File: AeroEstate.pdf | 30 Jun 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AeroEstate-Architect certificate.pdf | 19 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: AeroEstate-P52000078507-CA certificate.pdf | 19 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: AeroEstate-Engineer certificate.pdf | 19 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory - AeroEstate-signed.pdf | 19 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AC_AeroEstate.pdf | 20 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Aero estate-Khopoli.pdf | 20 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: EC_AeroEstate.pdf | 20 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory_Aeroestate.pdf | 20 Jan 2025 |
| Other - LegalFile: 1 Registered Power of Attorney_Devkrish.pdf | 16 Dec 2024 |
| Other - LegalFile: 2 Registered Power of Attorney.pdf | 16 Dec 2024 |
| Other - LegalFile: 3 Registered Power of Attorney_Devkrish_organized_organized.pdf | 16 Dec 2024 |
| Layout approvalFile: Layout Plan Final.pdf | 13 Dec 2024 |
| Details of encumbrances concerned to FinanceFile: EC-Finance-signed.pdf | 13 Dec 2024 |
| Details of encumbrances concerned to FinanceFile: EC-Legal-signed.pdf | 13 Dec 2024 |
| Copy of Layout Approval (in case of layout)File: Layout Plan Final.pdf | 13 Dec 2024 |
| Other - LegalFile: S No 5-2 POA_compressed (4705 of 2023)-pages-6.pdf | 13 Dec 2024 |
| Other - LegalFile: S No 5-2 POA_compressed (4705 of 2023)-pages-3_compressed.pdf | 13 Dec 2024 |
| Other - LegalFile: S No 6-1 AFS scanned copy (4478 of 2023)-pages-1_compressed.pdf | 13 Dec 2024 |
| Other - LegalFile: S No 6-1 AFS scanned copy (4478 of 2023)-pages-2_compressed.pdf | 13 Dec 2024 |
| Other - LegalFile: S No 6-1 AFS scanned copy (4478 of 2023)-pages-3_compressed.pdf | 13 Dec 2024 |
| Other - LegalFile: S No 6-1 AFS scanned copy (4478 of 2023)-pages-4.pdf | 13 Dec 2024 |
| Other - LegalFile: S No 6-1 AFS scanned copy (4478 of 2023)-pages-5.pdf | 13 Dec 2024 |
| Other - LegalFile: S No 6-1 POA scanned copy (4479 of 2023)-pages-1_compressed.pdf | 13 Dec 2024 |
| Other - LegalFile: S No 6-1 POA scanned copy (4479 of 2023)-pages-2_compressed.pdf | 13 Dec 2024 |
| Other - LegalFile: S No 6-1 POA scanned copy (4479 of 2023)-pages-3_compressed.pdf | 13 Dec 2024 |
| Other - LegalFile: S No 6-1 POA scanned copy (4479 of 2023)-pages-4.pdf | 13 Dec 2024 |
| Other - LegalFile: S no 5-2 AFS_compressed (4704 of 2023)-pages-5 and 6_compressed.pdf | 13 Dec 2024 |
| Other - LegalFile: S No 5-2 POA_compressed (4705 of 2023)-pages-4_compressed.pdf | 13 Dec 2024 |
| Other - LegalFile: S No 5-2 POA_compressed (4705 of 2023)-pages-2_compressed.pdf | 13 Dec 2024 |
| Other - LegalFile: S No 5-2 POA_compressed (4705 of 2023)-pages-1_compressed.pdf | 13 Dec 2024 |
| Other - LegalFile: S no 5-2 AFS_compressed (4704 of 2023)-pages-7.pdf | 13 Dec 2024 |
| Other - LegalFile: S no 5-2 AFS_compressed (4704 of 2023)-pages-4_compressed.pdf | 13 Dec 2024 |
| Other - LegalFile: S no 5-2 AFS_compressed (4704 of 2023)-pages-3_compressed.pdf | 13 Dec 2024 |
| Other - LegalFile: S no 5-2 AFS_compressed (4704 of 2023)-pages-2_compressed.pdf | 13 Dec 2024 |
| Other - LegalFile: S no 5-2 AFS_compressed (4704 of 2023)-pages-1_compressed.pdf | 13 Dec 2024 |
| Other - LegalFile: Clarification letter-updated-signed.pdf | 13 Dec 2024 |
| Other - LegalFile: One plot one registration-signed.pdf | 13 Dec 2024 |
| Other - LegalFile: S No 5-2 POA_compressed (4705 of 2023)-pages-5_compressed.pdf | 13 Dec 2024 |
| Declaration about Commencement CertificateFile: Format D-updated-signed.pdf | 13 Dec 2024 |
| CERSAI detailsFile: CERSAI Report-signed.pdf | 13 Dec 2024 |
| Details of encumbrances concerned to LegalFile: EC-Finance-signed.pdf | 13 Dec 2024 |
| Details of encumbrances concerned to LegalFile: EC-Legal-signed.pdf | 13 Dec 2024 |
| Other - FinanceFile: Clarification letter-updated-signed.pdf | 13 Dec 2024 |
| Other - TechnicalFile: One plot one registration-signed.pdf | 13 Dec 2024 |
| Other - TechnicalFile: Clarification letter-updated-signed.pdf | 13 Dec 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: CC Confirmation.pdf | 10 Dec 2024 |
| Building plan approval or NA orderFile: wide_2024_11-28_20_49-20-Final_compressed_compressed (1).pdf | 28 Nov 2024 |
| Building plan approval or NA orderFile: Demarcated Plan_compressed.pdf | 28 Nov 2024 |
| PAN CardFile: PAN_signed.pdf | 28 Nov 2024 |
| Copy of the legal title reportFile: RERA title report_compressed_compressed.pdf | 28 Nov 2024 |
| Details of encumbrances concerned to FinanceFile: No encumbrances to Legal.pdf | 28 Nov 2024 |
| Proforma of Allotment letterFile: Allotment Letter.pdf | 28 Nov 2024 |
| Declaration in FORM BFile: Form B - Khambewadi (notarized) updated.pdf | 28 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Ceritificate_compressed.pdf | 28 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Aeroestate-Form 3_Revised.pdf | 28 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Ceritificate.pdf | 28 Nov 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Doc_20241128_194158.pdf | 28 Nov 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Raigarh
Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.
Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 95 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep AeroEstate on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Village Khambewadi, Taluka Khalapur5,900+ in Raigarh
Godrej Hillview Estate
Godrej Projects Development Limited
Haware My First Home Shil Phata Phase 2 Bldg 1
Haware Properties LLP
UNIMONT IMPERIA
RSM DESIGNERS
Haware My First Home Shil Phata Phase 1 Bldg 1
Haware Properties LLP
Haware My First Home Shil Phata Phase 2 Bldg 2
Haware Properties LLP
Haware My First Home Shil Phata Phase 1 Bldg 2
Haware Properties LLP
See every Raigarh project, with the district possession charts
Builder: HOABL Landmark Realty Private Limited
HOABL Landmark Realty Private Limited has 1 registration on MahaRERA, including AeroEstate. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.
Frequently asked questions
What are my rights if AeroEstate is delayed beyond 31 Dec 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of AeroEstate?
The registered promoter entity is HOABL Landmark Realty Private Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in AeroEstate?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against AeroEstate?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for AeroEstate?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at AeroEstate?
The professionals named in the filing: Architect: Sanjay Jain; Engineer: Akil Ahmad; Chartered Accountant: Udal Mishra; Chartered Accountant: Chirag Sarvaiya; Chartered Accountant: Mahadev Sawant & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in AeroEstate?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback