Home / Browse projects / Raigarh, Maharashtra / SAI SUNCITY PHASE II

Registered No litigation declared Residential / Group Housing project

SAI SUNCITY PHASE II

By Chariot Properties LLP

RG-MH-96802 · RERA P52000045371 · Last updated on MahaRERA portal: 14 Jul 2026

Source: official MahaRERA filing

Red flags

  • 4 complaints at MahaRERA
  • Rs 300.00 crore secured on the land, in favour of Aditya Birla Capital Limited
  • The declared charge does not appear in the CERSAI report on the filing

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • All 9 earlier projects delivered on promise

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedno revision filed
6 of 66Construction stages doneacross 6 buildings; furthest along: Basement (if any), 80%
218 of 1,352Units unsoldnot recorded sold or booked
4Complaints at MahaRERAon this registration
Jump to the 113 documents Report an error

SAI SUNCITY PHASE II is a Residential / Group Housing project by Chariot Properties LLP in Raigarh, Maharashtra, registered with MahaRERA as P52000045371 on 18 May 2022. Possession is promised by 30 Dec 2028. 1,134 of the 1,352 units on this registration are recorded sold or booked, and 6 of 66 construction stages are filed complete. 4 complaints are on record with the regulator.

At a glance

Project

  • NameSAI SUNCITY PHASE II
  • TypeResidential / Group Housing
  • Location
    • MIDC Road
    • Ghot
    • Panvel
    • Raigarh
    • 410208
  • Pincode410208
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000045371
  • ReraGenie IDRG-MH-96802

Builder

  • NameChariot Properties LLP
  • Entity typePartnership
  • PartnersManish Madhu Bathija, Amit Madhu Bathija, Madhu Bhagwandas Bathija
  • Other registrations3 more →
  • Declared earlier projects9 →

Key dates

this monthRegisteredMay 2022PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on18 May 2022
  • Promised completion30 Dec 2028
  • Revised completionNone
  • Buildings6 building records
  • Documents filed113 files

Current status

84%1134 of 1,352 units booked
54.4%Work done, per cost certificate

Figures as on 14 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Tower 3 CoralNA37292260226
Tower 5 EMERALDNA37292260226
Tower 8 JADENA37292260226
Tower 6 IVORYNA37292260226
Tower 4 OPALNA37292240224
Tower 7 RUBYNA37292240224

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building6

As on 14 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 66 construction stages are filed complete across 6 buildings. The stage furthest along is Basement (if any), at 80%.

Tower 3 Coral40%
ActivityProgress
Excavation100%
Basement (if any)70%
Podiums (if any)70%
Plinth70%
Stilt Floor60%
Slabs of Super Structure30%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises5%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks36%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Tower 5 EMERALD42%
ActivityProgress
Excavation100%
Basement (if any)70%
Podiums (if any)70%
Plinth70%
Stilt Floor60%
Slabs of Super Structure43%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises5%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks39%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Tower 8 JADE40%
ActivityProgress
Excavation100%
Basement (if any)70%
Podiums (if any)70%
Plinth70%
Stilt Floor60%
Slabs of Super Structure30%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks36%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Tower 6 IVORY38%
ActivityProgress
Excavation100%
Basement (if any)80%
Podiums (if any)70%
Plinth70%
Stilt Floor60%
Slabs of Super Structure7%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks29%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Tower 4 OPAL41%
ActivityProgress
Excavation100%
Basement (if any)70%
Podiums (if any)70%
Plinth70%
Stilt Floor60%
Slabs of Super Structure37%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises5%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks39%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Tower 7 RUBY35%
ActivityProgress
Excavation100%
Basement (if any)65%
Podiums (if any)65%
Plinth65%
Stilt Floor60%
Slabs of Super Structure5%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks27%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 14 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed6

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots6
Closed/Covered6
BuildingClosed/CoveredTotal
Tower 3 Coral11
Tower 5 EMERALD11
Tower 8 JADE11
Tower 6 IVORY11
Tower 4 OPAL11
Tower 7 RUBY11

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area12,766 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofAditya Birla Capital Limited
Secured amountRs 300.00 crore
CERSAI search filedYes
Declared on1 Jan 2026

Approvals and building plan

Sanctioning authorityPanvel Municipal Corporation
Permissible FSI98272.0
Proposed, not sanctioned98,272 sq m
Buildings approved6
Buildings sanctioned6

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShop no 4 Arihant Aura, Thane Belapur Road Turbhe Navi Mumbai 400705
Estimated costRs 270.00 cr
Cost incurredRs 146.77 cr
Work done54.36%
BuildingWingEstimatedIncurred
Tower 3 CoralNARs 40.00 crRs 24.46 cr
Tower 5 EMERALDNARs 40.00 crRs 24.46 cr
Tower 8 JADENARs 40.00 crRs 24.46 cr
Tower 6 IVORYNARs 40.00 crRs 24.46 cr
Tower 4 OPALNARs 40.00 crRs 24.46 cr
Tower 7 RUBYNARs 40.00 crRs 24.46 cr
-NARs 30.00 cr-

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectHiten Sethi & Associates
EngineerStructural Concept Designs Pvt Ltd
EngineerSuresh
EngineerBharat Dave
Chartered AccountantRangani & co.
Chartered AccountantS.U.Radhakrishnani & co
PartnerRole in project
Chariot Properties LLP-

Complaints filed with MahaRERA4

Case no.ComplainantRespondentFiled
CC12503596Natarajan VenkataramanChariot Properties LLP09/10/2025
SM12600046Bhakti AchrekarChariot Properties LLP10/01/2026
CC12602598Chariot Properties LLPJitendra Bhagwan Kharatmol04/05/2026
CC12603721Chariot Properties LLPLate Mr Abdul Rauab Ali Shiakh and Mrs Jahida Abdul Majid Shaikh16/06/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 4 Nov 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 10 May 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 10 May 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 25 Aug 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Dec 2028

Documents filed113

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 113 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1.pdf14 Jul 2026
Withdrawal Update Form 2File: Form 2.pdf14 Jul 2026
Withdrawal Update Form 3File: Form 3.pdf14 Jul 2026
Form 2A (FY 2025-2026)File: SSC PHASE II.pdf7 May 2026
Withdrawal Update Form 1File: Form 1.pdf15 Apr 2026
Withdrawal Update Form 2File: Form 2.pdf15 Apr 2026
Withdrawal Update Form 3File: Form 3.pdf15 Apr 2026
Withdrawal Update Form 1File: Form 1.pdf6 Feb 2026
Withdrawal Update Form 2File: Form 2.pdf6 Feb 2026
Withdrawal Update Form 3File: Form 3 SSC P2.pdf6 Feb 2026
Withdrawal Update Form 1File: Form 1.pdf17 Jan 2026
Withdrawal Update Form 2File: Form 2.pdf17 Jan 2026
Withdrawal Update Form 3File: Form 3 SSC P2.pdf17 Jan 2026
Form 1File: Form 1.pdf15 Oct 2025
Form 2File: Form 2.pdf15 Oct 2025
Form 3File: Form 3.pdf15 Oct 2025
Disclosure of Sold and Booked InventoryFile: Inventory.pdf15 Oct 2025
Self-declaration of Quarterly ProgressFile: Self Declaration.pdf15 Oct 2025
Form 1File: FORM 1.pdf15 Jul 2025
Form 2File: Form 2.pdf15 Jul 2025
Form 3File: Form 3.pdf15 Jul 2025
Disclosure of Sold and Booked InventoryFile: Inventory.pdf15 Jul 2025
Self-declaration of Quarterly ProgressFile: Undertaking.pdf15 Jul 2025
Form 2A (FY 2024-2025)File: FORM 2A.pdf27 Jun 2025
Form 5 (FY 2024-2025)File: FORM 5.pdf19 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf19 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf17 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 3.pdf17 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf17 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_compressed.pdf25 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Phase 2.pdf25 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Phase 2.pdf25 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Phase 2.pdf19 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf14 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf14 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf14 Aug 2024
Details of encumbrances concerned to FinanceFile: ENCUMBRANCE CERTIFICATE.pdf11 Jun 2024
Details of encumbrances concerned to LegalFile: ENCUMBRANCE CERTIFICATE.pdf11 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A 22042024 SSC-2 March 2024.pdf10 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A 12042023.pdf26 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A 12042023.pdf26 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A 12042023.pdf26 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: SSC -II 2022-23.pdf15 Mar 2024
Copy of the legal title reportFile: Phase 2.pdf4 Nov 2023
Details of encumbrances concerned to FinanceFile: Phase 2.pdf4 Nov 2023
Details of encumbrances concerned to LegalFile: Phase 2.pdf4 Nov 2023
Commencement Certificates / NA Order for plotted developmentFile: CC LETTER.pdf25 Aug 2023
Commencement Certificates / NA Order for plotted developmentFile: CC Suncity.pdf25 Aug 2023
Copy of the legal title reportFile: Title Report BW.pdf9 Jul 2022
Details of encumbrancesFile: Encumbrance certificate- 2.pdf9 Jul 2022
CERSAI detailsFile: CERSAI.pdf9 Jul 2022
Layout approvalFile: 1.pdf10 May 2022
Building plan approvalFile: 1.pdf10 May 2022
Building plan approvalFile: 2.pdf10 May 2022
Building plan approvalFile: 3.pdf10 May 2022
Building plan approvalFile: 4.pdf10 May 2022
Building plan approvalFile: 5.pdf10 May 2022
Building plan approvalFile: 6.pdf10 May 2022
Building plan approvalFile: 7.pdf10 May 2022
Building plan approvalFile: 8.pdf10 May 2022
Building plan approvalFile: 9.pdf10 May 2022
Building plan approvalFile: 10.pdf10 May 2022
Building plan approvalFile: 11.pdf10 May 2022
Building plan approvalFile: 12.pdf10 May 2022
Building plan approvalFile: 13.pdf10 May 2022
Building plan approvalFile: 14.pdf10 May 2022
Building plan approvalFile: 15.pdf10 May 2022
Building plan approvalFile: 16.pdf10 May 2022
Building plan approvalFile: 17.pdf10 May 2022
Building plan approvalFile: 18.pdf10 May 2022
Building plan approvalFile: 19.pdf10 May 2022
Building plan approvalFile: 20.pdf10 May 2022
Building plan approvalFile: 21.pdf10 May 2022
Building plan approvalFile: 22.pdf10 May 2022
Building plan approvalFile: 23.pdf10 May 2022
PAN CardFile: Pan Card.pdf10 May 2022
Copy of the legal title reportFile: Legal Title Report.pdf10 May 2022
Details of encumbrancesFile: Encumbrance.pdf10 May 2022

Promoter's earlier projects9

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

9 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
Sai RiverdaleSector 7 Taloja244CompletedOct 2017Jul 2017
Sai MannatSector 34A325CompletedJul 2017Jul 2017
Sai HarmonySector 21 Ulwe115CompletedJul 2017Jul 2017
Sai WonderSector 35F Kharghar95CompletedJul 2017May 2017
Sai SolitaireSector 35H Kharghar83CompletedJan 2017Jun 2016
Sai CrystalSector 35D166CompletedOct 2016Sep 2016
Sai SpringSector 35G Kharghar148CompletedAug 2016Jul 2016
Sai MiracleSector 35E110CompletedAug 2016Jul 2016
Sai SapphireSector 20 Ulwe162CompletedJul 2015Jul 2015

How this compares with Raigarh

84%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SAI SUNCITY PHASE II on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Ghot5,900+ in Raigarh

2 kmSAI SUNCITY PHASE IICompleted 34Lapsed / revoked 10Other 43Dot size: filed unitsN

Filed coordinates, straight-line distance. 87 registered projects within 2 km.

Builder: Chariot Properties LLP

Chariot Properties LLP has 4 registrations on MahaRERA, including SAI SUNCITY PHASE 1 and SAI SUNCITY PHASE II. Its filings disclose 9 earlier MahaRERA projects: declares 9 of 9 past projects completed on time. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if SAI SUNCITY PHASE II is delayed beyond 30 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SAI SUNCITY PHASE II?

The registered promoter entity is Chariot Properties LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SAI SUNCITY PHASE II?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against SAI SUNCITY PHASE II?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for SAI SUNCITY PHASE II?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SAI SUNCITY PHASE II?

The professionals named in the filing: Architect: Hiten Sethi & Associates; Engineer: Structural Concept Designs Pvt Ltd; Engineer: Suresh; Engineer: Bharat Dave; Chartered Accountant: Rangani & co.; Chartered Accountant: S.U.Radhakrishnani & co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SAI SUNCITY PHASE II?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SAI SUNCITY PHASE II. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SAI SUNCITY PHASE II to a free account