Completed No litigation declared Residential / Group Housing project

SAI WORLD CITY PHASE II

By Paradise Lifespaces LLP

RG-MH-14456 · RERA P52000022708 · Last updated on MahaRERA portal: 21 Jul 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 4 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 11 earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Apr 2026Possession promisedregistration recorded completed
27 of 33Construction stages doneacross 3 buildings; furthest along: Sanitary Fittings within the flats /..., 95%
89 of 522Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 100 documents Report an error

SAI WORLD CITY PHASE II is a Residential / Group Housing project by Paradise Lifespaces LLP in Raigarh, Maharashtra, registered with MahaRERA as P52000022708 on 12 Oct 2019. The registration is recorded completed; possession was promised by 30 Apr 2026. The completion date has moved by 4 months from the original filing. 433 of the 522 units on this registration are recorded sold or booked, and 27 of 33 construction stages are filed complete.

At a glance

Project

  • NameSAI WORLD CITY PHASE II
  • TypeResidential / Group Housing
  • Location
    • NH 4B
    • Panvel
    • Kolkhe
    • Raigarh
    • 410206
  • Pincode410206
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000022708
  • ReraGenie IDRG-MH-14456

Builder

  • NameParadise Lifespaces LLP
  • Entity typePartnership
  • PartnersParadise Infracon Private Limited, Manish Madhu Bathija, Ebrahim Esmail Dhariwala
  • Other registrations2 more →
  • Completed2 of 3
  • Declared earlier projects12 →

Key dates

this monthRegisteredOct 2019First promiseDec 2025Revised toApr 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on12 Oct 2019
  • Promised completion30 Apr 2026
  • Revised completionRevised to 30 Apr 2026 (originally 30 Dec 2025)
  • Buildings3 building records
  • Documents filed100 files

Current status

83%433 of 522 units booked
70.4%Work done, per cost certificate

Figures as on 21 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Sale Building No 3Wing A36301740174
Sale Building No 3Wing B36301740174
Sale Building No 3Wing C36301740174

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 21 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

27 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Sanitary Fittings within the flats / premises, at 95%.

Sale Building No 3 · wing Wing A99%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises95%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%
Sale Building No 3 · wing Wing B99%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises95%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%
Sale Building No 3 · wing Wing C99%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises95%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%

Progress on shared amenities15

As on 21 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes95%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes90%
Storm Water DrainsYes95%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes90%
Solid Waste Management And DisposalYes90%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes90%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes90%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%

Land and ownership8

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area13,595 sq m
Land owned byNot the promoter
Named landowners8
Encumbrance on the landDeclared none
Declared on10 Mar 2026
LandownerVillageDistrict
Dhariwala DevelopmentsMumbai CityMumbai City
Mohsin Ebrahim DhariwalaMumbai CityMumbai City
Esmail Ebrahim DhariwalaMumbai CityMumbai City
Badruddin Legal Heir Zakiya Badruddin DhariwalaMumbai CityMumbai City
Badruddin Legal Heir Sara Moin UnwalaMumbai CityMumbai City
Badruddin Legal Heir Kutub Badruddin DhariwalaMumbai CityMumbai City
Yahya Ebrahim DhariwalaMumbai CityMumbai City
Aziz Esmail DhariwalaMumbai CityMumbai City

Approvals and building plan

Sanctioning authorityCIDCO/NAINA
Permissible FSI35582.0
Proposed, not sanctioned35,582 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchTulsiani Chambers, Free Press Journal Marg, Nariman Point Mumbai 400021
Estimated costRs 27.00 cr
Cost incurredRs 19.01 cr
Work done70.39%
BuildingWingEstimatedIncurred
-NARs 27.00 crRs 19.01 cr

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDimensions Architects Pvt. Ltd
ArchitectSpaceage Consultants Pvt Ltd
EngineerStructural Concept Designs Pvt Ltd
EngineerRanjan Kumar
Chartered AccountantRangani & co.
Chartered AccountantBhasin Hota & Co
Chartered AccountantS.U. Radhakrishnani & co.
PartnerRole in project
Paradise Lifespaces LLP-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA05122518550Dec 2025 → Apr 2026

Reason as filed by the promoterDespite all efforts the Promoter Could not complete the balance work i. e. external infrastructure work within the period of validity because of extended rainy season this year and due to intermittent rain causing delay in excavation work required for installation of electrical substation and water supply lines. The work is going on in full speed now therefore Promoter undertakes to complete the same and obtain the OC from Authority within 4 months’ time as stated above. The promoter humbly submits that the extension will enable promoter to complete the project and hand over possession of the

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 3 Oct 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 5 Dec 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 5 Dec 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 3 Oct 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed100

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 100 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupational CertificateFile: OC Bldg 3 Wing ABC 30042026.pdf21 Jul 2026
Occupational CertificateFile: Naina Mail for OC.pdf21 Jul 2026
Withdrawal Update Form 1File: Form 1.pdf14 Jul 2026
Withdrawal Update Form 2File: Form 2.pdf14 Jul 2026
Withdrawal Update Form 3File: Form 3.pdf14 Jul 2026
Form 5 (FY 2025-2026)File: Form 5.pdf9 May 2026
Form 2A (FY 2025-2026)File: Form 2A SWC Phase II.pdf1 May 2026
Withdrawal Update Form 1File: Form 1.pdf15 Apr 2026
Withdrawal Update Form 2File: Form 2.pdf15 Apr 2026
Withdrawal Update Form 3File: Form 3.pdf15 Apr 2026
Withdrawal Update Form 1File: Form 1.pdf6 Feb 2026
Withdrawal Update Form 1File: Form 1.pdf6 Feb 2026
Withdrawal Update Form 1File: Form 1.pdf6 Feb 2026
Withdrawal Update Form 1File: Form 1.pdf6 Feb 2026
Withdrawal Update Form 1File: Form 1.pdf6 Feb 2026
Withdrawal Update Form 1File: Form 1.pdf6 Feb 2026
Withdrawal Update Form 1File: Form 1.pdf6 Feb 2026
Withdrawal Update Form 2File: Form 2.pdf6 Feb 2026
Withdrawal Update Form 2File: Form 2.pdf6 Feb 2026
Withdrawal Update Form 2File: Form 2.pdf6 Feb 2026
Withdrawal Update Form 2File: Form 2.pdf6 Feb 2026
Withdrawal Update Form 2File: Form 2.pdf6 Feb 2026
Withdrawal Update Form 2File: Form 2.pdf6 Feb 2026
Withdrawal Update Form 2File: Form 2.pdf6 Feb 2026
Withdrawal Update Form 3File: Form 3.pdf6 Feb 2026
Withdrawal Update Form 3File: Form 3.pdf6 Feb 2026
Withdrawal Update Form 3File: Form 3.pdf6 Feb 2026
Withdrawal Update Form 3File: Form 3.pdf6 Feb 2026
Withdrawal Update Form 3File: Form 3.pdf6 Feb 2026
Withdrawal Update Form 3File: Form 3.pdf6 Feb 2026
Withdrawal Update Form 3File: Form 3.pdf6 Feb 2026
Withdrawal Update Form 1File: Form 1.pdf17 Jan 2026
Withdrawal Update Form 2File: Form 2.pdf17 Jan 2026
Withdrawal Update Form 3File: Form 3.pdf17 Jan 2026
Layout approvalFile: Amennded CC Bldg 4 & 5.pdf5 Dec 2025
Building plan approvalFile: Amended Plans Bldg 3.pdf5 Dec 2025
Form 1File: Form 1.pdf15 Oct 2025
Form 2File: Form 2.pdf15 Oct 2025
Form 3File: Form 3.pdf15 Oct 2025
Disclosure of Sold and Booked InventoryFile: Inventory.pdf15 Oct 2025
Self-declaration of Quarterly ProgressFile: Self Declaration.pdf15 Oct 2025
Form 1File: Form 1.pdf11 Jul 2025
Form 2File: Form 2.pdf11 Jul 2025
Form 3File: Form 3.pdf11 Jul 2025
Disclosure of Sold and Booked InventoryFile: Inventory.pdf11 Jul 2025
Self-declaration of Quarterly ProgressFile: Undertaking.pdf11 Jul 2025
Form 2A (FY 2024-2025)File: FORM 2A.pdf27 Jun 2025
Form 5 (FY 2024-2025)File: FORM 5.pdf23 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf19 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf17 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf17 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf17 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Phase 2.pdf18 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 C.pdf18 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 -Phase 2.pdf18 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 SWC Phase II.pdf11 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5-PLL- Phase -II - FY 23-24.pdf13 Aug 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: SWC-2 (2023-2024).pdf10 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 2 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23).pdf1 May 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: SWC -II 2022-23.pdf14 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 2021-22 SWC II.pdf1 Jun 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 SWC 2-2020-21.pdf25 May 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: SWC-2 (2020-2021).pdf23 May 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Sai Symphony (2021-2022).pdf23 May 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Sai Symphony (2022-2023).pdf23 May 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 SWC Phase 2.pdf25 Feb 2021
Layout approvalFile: Layout Approval.pdf3 Oct 2019
Building plan approvalFile: 1.pdf3 Oct 2019
Building plan approvalFile: 2.pdf3 Oct 2019
Building plan approvalFile: 3.pdf3 Oct 2019
Building plan approvalFile: 4.pdf3 Oct 2019
Building plan approvalFile: 5.pdf3 Oct 2019
Building plan approvalFile: 6.pdf3 Oct 2019
Building plan approvalFile: 7.pdf3 Oct 2019
Building plan approvalFile: 8.pdf3 Oct 2019
Building plan approvalFile: 9.pdf3 Oct 2019
Building plan approvalFile: 10.pdf3 Oct 2019
PAN CardFile: Paradise Lifespaces LLP.pdf3 Oct 2019

Promoter's earlier projects11

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

11 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
SAI WONDERSECTOR 35F KHARGHAR NAVI MUMBAI95CompletedJul 2017May 2017
SAI SOLITARESECTOR 35H KHARGHAR NAVI MUMBAI83CompletedJul 2017Jun 2017
SAI GANGASECTOR 5 ULWE62CompletedMay 2017Jan 2017
SAI SAHILSECTOR 5 ULWE NAVI MUMBAI50CompletedMay 2017Apr 2017
SAI FORTUNESECTOR 8 ULWE99CompletedDec 2016Nov 2016
SAI CRYSTALSECTOR 35D KHARGHAR NAVI MUMBAI166CompletedOct 2016Sep 2016
SAI SPRINGSECTOR 35G KHARGHAR NAVI MUMBAI148CompletedAug 2016Jul 2016
SAI MIRACLESECTOR 35E110CompletedAug 2016Jul 2016
SAI HARMONYSECTOR 21 ULWE115CompletedJul 2016Jul 2016
SAI MOKSHsector 15 kharghar navi mumbai73CompletedAug 2015Jun 2015
SAI SAPPHIRESECTOR 20 ULWE NAVI MUMBAI162CompletedJul 2015Jul 2015

How this compares with Raigarh

83%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one moved by 4 months
26%of Raigarh registrations have lapsed or been cancelledthis one is completed

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SAI WORLD CITY PHASE II on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Panvel5,900+ in Raigarh

2 kmSAI WORLD CITY PHASE IICompleted 86Lapsed / revoked 19Other 28Dot size: filed unitsN

Filed coordinates, straight-line distance. 133 registered projects within 2 km.

Builder: Paradise Lifespaces LLP

Paradise Lifespaces LLP has 3 registrations on MahaRERA, including SAI WORLD CITY and SAI WORLD CITY PHASE II. Its filings disclose 12 earlier MahaRERA projects: declares 12 of 12 past projects completed on time. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if SAI WORLD CITY PHASE II is delayed beyond 30 Apr 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SAI WORLD CITY PHASE II?

The registered promoter entity is Paradise Lifespaces LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SAI WORLD CITY PHASE II?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SAI WORLD CITY PHASE II?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SAI WORLD CITY PHASE II?

The professionals named in the filing: Architect: Dimensions Architects Pvt. Ltd; Architect: Spaceage Consultants Pvt Ltd; Engineer: Structural Concept Designs Pvt Ltd; Engineer: Ranjan Kumar; Chartered Accountant: Rangani & co.; Chartered Accountant: Bhasin Hota & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SAI WORLD CITY PHASE II?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SAI WORLD CITY PHASE II. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SAI WORLD CITY PHASE II to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.