Home / Browse projects / Raigarh, Maharashtra / ARIHANT CLAN AALISHAN PHASE I
ARIHANT CLAN AALISHAN PHASE I
By ARIHANT VATIKA REALTY PRIVATE LIMITED
RG-MH-25219 · RERA P52000006391 · Last updated on MahaRERA portal: 4 Aug 2026
Source: official MahaRERA filing
Red flags
- Litigation declared, 4 cases
- 12 complaints at MahaRERA
- Completion date moved by 18 months
- 2 extensions taken
Clear
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
- All 1 earlier projects delivered on promise
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
ARIHANT CLAN AALISHAN PHASE I is a Residential / Group Housing project by ARIHANT VATIKA REALTY PRIVATE LIMITED in Raigarh, Maharashtra, registered with MahaRERA as P52000006391 on 14 Aug 2017. The registration is recorded completed; possession was promised by 30 Sep 2026. The completion date has moved by 18 months from the original filing. 395 of the 527 units on this registration are recorded sold or booked, and 19 of 22 construction stages are filed complete. 12 complaints are on record with the regulator.
At a glance
Project
- NameARIHANT CLAN AALISHAN PHASE I
- TypeResidential / Group Housing
- Location
- Behind RAF Colony/Sector-35 Metro Station
- Panvel
- Rohinjan
- Raigarh
- 410206
- Pincode410206
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52000006391
- ReraGenie IDRG-MH-25219
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on14 Aug 2017
- Promised completion30 Sep 2026
- Revised completionRevised to 30 Sep 2026 (originally 30 Mar 2025)
- Buildings2 building records
- Documents filed174 files
Current status
Figures as on 4 Aug 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| BARAZ-1 | NA | 55 | 48 | 375 | 0 | 375 |
| KAVEH | NA | 38 | 32 | 152 | 0 | 152 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 4 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
19 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is External plumbing and external plaster, at 71%.
BARAZ-190%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 70% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 71% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 52% |
KAVEH100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 4 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 40% |
| Water Supply | Yes | 70% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 50% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Parking filed812
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| BARAZ-1 | 451 | 451 |
| KAVEH | 361 | 361 |
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| SUPREME CONSTRUCTION AND DEVELOPERS PVT. LTD. | Mumbai City | Mumbai City |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| BARAZ-1 | NA | Rs 127.97 cr | Rs 120.15 cr |
| KAVEH | NA | Rs 127.97 cr | Rs 120.15 cr |
| - | NA | Rs 6.17 cr | Rs 6.17 cr |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Yogita Bhandarkar |
| Engineer | Kaleem Sayyad |
| Engineer | JW CONSULTANT LLP |
| Chartered Accountant | ANJANI KUMAR GOYAL |
| Partner | Role in project |
|---|---|
| ARIHANT VATIKA REALTY PRIVATE LIMITED | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterWe are pleased to inform you that the project is now 100% complete, the PART OC OF ONE OF THE 2 BUILDING (TOWER 1 - KAVEH 1) HAS ALREADY BEEN RECEIVED and the full OC application has been submitted. However, there is a high possibility of a delay of 3-4 months in obtaining the Full OC due to a backlog in processing applications at the competent authority. We currently expect to receive the OC by June 2025 To ensure sufficient time for completing all formalities, we request an extension until 31/07/2025
Reason as filed by the promoterThe delay in the completion of the real estate project has been primarily caused by a delay in OC. The project is 100% completed, and we have received the Occupation Certificate (OC) on 15/10/2024 (Kaveh) and 08/05/2025 (Baraz 1) respectively and we have also initiated the process for the possession as well. However there is mismatch occurred in certain details on the MahaRERA profile as compared with the sanctioned plans, such as the sanctioned built-up area, permissible built-up area, total parking, sanctioned number of floors and the number of floors for which CC has been issued. In view of
Litigation declared4
| Case | Court | Status |
|---|---|---|
| 80 TO 86 OF 2016, 319 TO 323 OF 2016, 329 OF 2016, 8 OF 2017, 191 TO 195 OF 2017 AND 310 TO 311 OF 2017/2016 | HIGH COURT OF JUDICATURE AT BOMBAY | DISPOSED OFF |
| Special Civil Suit No 3/2018 | Civil Judge Senior Division at Panvel | Pending for argument for exhibit |
| 3/2018/2018 | CIVIL JUDGE SENIOR DIVISION | Ongoing |
| 21/2020/2020 | CIVIL JUDGE JUNIOR DIVISION | Ongoing |
Complaints filed with MahaRERA12
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000054626 | PRASHANT SONAWANE | Mr. Ashok Chajjer | 11/06/2018 |
| CC12400318 | Jaison Ubald Aranha | ARIHANT VATIKA REALTY PRIVATE LIMITED | 03/10/2024 |
| CC12401238 | AJAI KUMAR CHIKARA | ARIHANT VATIKA REALTY PRIVATE LIMITED | 25/12/2024 |
| CC12500139 | KAILASH K KSHIRSAGAR | ARIHANT VATIKA REALTY PRIVATE LIMITED | 15/01/2025 |
| CC12500870 | Santosh Jagannath Kamble | ARIHANT VATIKA REALTY PRIVATE LIMITED | 13/03/2025 |
| CC12501144 | Rinjesh Anil Yadav | ARIHANT VATIKA REALTY PRIVATE LIMITED | 05/04/2025 |
| CC12501518 | Dinesh Manjayya Rai | ARIHANT VATIKA REALTY PRIVATE LIMITED | 06/05/2025 |
| CC12501573 | Milan Himatlal Zaveri | ARIHANT VATIKA REALTY PRIVATE LIMITED | 13/05/2025 |
| CC12501574 | Milan Himatlal Zaveri | ARIHANT VATIKA REALTY PRIVATE LIMITED | 13/05/2025 |
| CC12502507 | Mohammed Khateeb Khan | ARIHANT VATIKA REALTY PRIVATE LIMITED | 21/07/2025 |
| SM12600277 | Bhakti Achrekar | ARIHANT VATIKA REALTY PRIVATE LIMITED | 27/04/2026 |
| CC12604616 | Sujit Ghorpade Ors | ARIHANT VATIKA REALTY PRIVATE LIMITED | 23/07/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 27 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 16 Jul 2026 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 16 Jul 2026 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 1 Dec 2020Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 13 Dec 2024
Documents filed174
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 174 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1 -Architect Certificate.pdf | 4 Aug 2026 |
| Withdrawal Update Form 2File: Form 2 - Engineer Certificate.pdf | 4 Aug 2026 |
| Withdrawal Update Form 3File: Form 3 - CA Certificate.pdf | 4 Aug 2026 |
| Occupational CertificateFile: Full OC.pdf | 4 Aug 2026 |
| Occupational CertificateFile: Commencement Certificate.pdf | 4 Aug 2026 |
| Occupational CertificateFile: CC Plan 1.pdf | 4 Aug 2026 |
| Occupational CertificateFile: CC Plan 2.pdf | 4 Aug 2026 |
| Occupational CertificateFile: CC Plan 3.pdf | 4 Aug 2026 |
| Occupational CertificateFile: CC Plan 4.pdf | 4 Aug 2026 |
| Occupational CertificateFile: OC Plan 1 - Baraz 1 Highlighted.pdf | 4 Aug 2026 |
| Occupational CertificateFile: OC Plan 2 - Baraz 1.pdf | 4 Aug 2026 |
| Occupational CertificateFile: OC Plan 3 - Baraz 1.pdf | 4 Aug 2026 |
| Occupational CertificateFile: OC Plan 4 - Baraz 1.pdf | 4 Aug 2026 |
| Occupational CertificateFile: OC Plan 5 - Baraz 1.pdf | 4 Aug 2026 |
| Occupational CertificateFile: OC Plan 6 - Baraz 1.pdf | 4 Aug 2026 |
| Occupational CertificateFile: OC Plan 7 - Baraz 1.pdf | 4 Aug 2026 |
| Occupational CertificateFile: OC Plan 8 - Kaveh.pdf | 4 Aug 2026 |
| Occupational CertificateFile: OC Plan 9 - Kaveh.pdf | 4 Aug 2026 |
| Occupational CertificateFile: OC Plan 10 - Kaveh.pdf | 4 Aug 2026 |
| Occupational CertificateFile: OC Plan 11 - Kaveh.pdf | 4 Aug 2026 |
| Occupational CertificateFile: OC Plan 12 - Kaveh.pdf | 4 Aug 2026 |
| Occupational CertificateFile: OC Plan 13 - Kaveh.pdf | 4 Aug 2026 |
| Occupational CertificateFile: OC Plan 14 - Kaveh.pdf | 4 Aug 2026 |
| Occupational CertificateFile: OC Verification - Arihant Clan Aalishan Ph I.pdf | 4 Aug 2026 |
| Layout approvalFile: Page 1 - (Highlighted) (Sanctioned BUA And Permissible) (OC Plans) (1).pdf | 16 Jul 2026 |
| Building plan approvalFile: Page 2 - Basement Floor Plan ((Part OC PLans).pdf | 16 Jul 2026 |
| Building plan approvalFile: Page 3 - Ground Floor Plans (OC Plans).pdf | 16 Jul 2026 |
| Building plan approvalFile: Page 4 - 1st podium Plan (OC Plans).pdf | 16 Jul 2026 |
| Building plan approvalFile: Page 5 - 2nd to 4th podium plan (OC Plans).pdf | 16 Jul 2026 |
| Building plan approvalFile: Page 6 - Floor Plans (Bazar 1).pdf | 16 Jul 2026 |
| Building plan approvalFile: Page 7 - Elevation (Bazar 1).pdf | 16 Jul 2026 |
| Layout approvalFile: Page 1 - Highlighted (Permissible and Sacntioned BUA) (Parking) (Part OC PLans) (1).pdf | 16 Jul 2026 |
| Building plan approvalFile: Page 2 - Basement Floor Plan ((Part OC PLans).pdf | 16 Jul 2026 |
| Building plan approvalFile: Page 3 - Ground Floor Plan (Part OC PLans).pdf | 16 Jul 2026 |
| Building plan approvalFile: Page 4 - Podium Plan (Part OC PLans).pdf | 16 Jul 2026 |
| Building plan approvalFile: Page 5 - Podium Floor Plan (Part OC PLans).pdf | 16 Jul 2026 |
| Building plan approvalFile: Page 6 - Floor Plans (Part OC PLans) (Kaveh).pdf | 16 Jul 2026 |
| Building plan approvalFile: Page 7 - Elevation (Part OC PLans) (Kaveh).pdf | 16 Jul 2026 |
| Withdrawal Update Form 1File: Form 1 -Architect Certificate.pdf | 15 Jul 2026 |
| Withdrawal Update Form 1File: Form 1 -Architect Certificate.pdf | 15 Jul 2026 |
| Withdrawal Update Form 2File: Form 2 - Engineer Certificate.pdf | 15 Jul 2026 |
| Withdrawal Update Form 2File: Form 2 - Engineer Certificate.pdf | 15 Jul 2026 |
| Withdrawal Update Form 3File: Form 3 - CA Certificate.pdf | 15 Jul 2026 |
| Withdrawal Update Form 3File: Form 3 - CA Certificate.pdf | 15 Jul 2026 |
| Form 2A (FY 2025-2026)File: Form2A_FY_2024-25.pdf | 15 Jul 2026 |
| Withdrawal Update Form 1File: Arihant Aalishan Phase I.pdf | 16 Jun 2026 |
| Withdrawal Update Form 1File: Arihant Aalishan Phase I.pdf | 16 Jun 2026 |
| Withdrawal Update Form 1File: Arihant Aalishan Phase I.pdf | 16 Jun 2026 |
| Withdrawal Update Form 2File: Form 2 Aalishan I.pdf | 16 Jun 2026 |
| Withdrawal Update Form 2File: Form 2 Aalishan I.pdf | 16 Jun 2026 |
| Withdrawal Update Form 2File: Form 2 Aalishan I.pdf | 16 Jun 2026 |
| Withdrawal Update Form 3File: FORM 3 30062024 Aalishan 1 SIGNED.pdf | 16 Jun 2026 |
| Withdrawal Update Form 3File: FORM 3 30062024 Aalishan 1 SIGNED.pdf | 16 Jun 2026 |
| Withdrawal Update Form 3File: FORM 3 30062024 Aalishan 1 SIGNED.pdf | 16 Jun 2026 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2-Aalishan Ph I_310325.pdf | 19 Apr 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_Aalishan Ph I_310325.PDF | 18 Apr 2025 |
| Certificates of CA (Form 3)File: Form 3_Aalishan Ph I_150325.pdf | 18 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE SIGNESD.pdf | 18 Apr 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Aalishan Phase I.pdf | 19 Jan 2025 |
| Certificates of CA (Form 3)File: Form 3 - Aalishan Phase I_compressed.pdf | 19 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE SIGNED.pdf | 19 Jan 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_Aalishan Phase I Dec 24.pdf | 7 Jan 2025 |
| Declaration about Commencement CertificateFile: FORMAT D (32).pdf | 6 Jan 2025 |
| Declaration in FORM BFile: FORM -B.pdf | 28 Dec 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A 19-20.pdf | 28 Dec 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A 20-21.pdf | 28 Dec 2024 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: Format A - Seperate Bank Account Details.pdf | 28 Dec 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A 21-22 (4).pdf | 28 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Aalishan Phase I FY 22-23.pdf | 27 Dec 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: KAVEH OC LETTER.pdf | 13 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Aalishan Phase I_signed.pdf | 11 Nov 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM I - AALISHAN PHASE I_SIGNED.pdf | 22 Oct 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Aalishan Ph I.pdf | 21 Oct 2024 |
| Certificates of CA (Form 3)File: Aalishan 1_SIGNED.pdf | 19 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE_SIGNED.pdf | 19 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A AALISHAN I FY 22-23.pdf | 23 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A AALISHAN I FY 23-24.pdf | 23 Jul 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Aalishan I.pdf | 22 Jul 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arihant Aalishan Phase I.pdf | 20 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure SIGNED.pdf | 20 Jul 2024 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| ARIHANT ANMOL PHASE I | JOUVELI BADLAPUR EAST | 434 | Completed | Oct 2016 | Oct 2016 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Raigarh
Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.
Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 8 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 174 filed documents as one ZIP, foldered, with a manifest
Keep ARIHANT CLAN AALISHAN PHASE I on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Panvel5,900+ in Raigarh
SHREE RAM DELTA
Shreenathji Enterprises
Brillante
Callista Realty Limited
SAI SUNCITY PHASE 3
Chariot Properties LLP
ANANDAM PHASE - II
TODAY GLOBAL HOMES
Maximus Residency Phase-I
Superb Maa Developers LLP
Sai Vrindavan Dham
KT & LK SWEET HOMES
See every Raigarh project, with the district possession charts
Builder: ARIHANT VATIKA REALTY PRIVATE LIMITED
ARIHANT VATIKA REALTY PRIVATE LIMITED has 9 registrations on MahaRERA, including ARIHANT ANAIKA PHASE I and ARIHANT ANMOL PHASE II. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Raigarh district page.
Frequently asked questions
What are my rights if ARIHANT CLAN AALISHAN PHASE I is delayed beyond 30 Sep 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of ARIHANT CLAN AALISHAN PHASE I?
The registered promoter entity is ARIHANT VATIKA REALTY PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in ARIHANT CLAN AALISHAN PHASE I?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against ARIHANT CLAN AALISHAN PHASE I?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for ARIHANT CLAN AALISHAN PHASE I?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at ARIHANT CLAN AALISHAN PHASE I?
The professionals named in the filing: Architect: Yogita Bhandarkar; Engineer: Kaleem Sayyad; Engineer: JW CONSULTANT LLP; Chartered Accountant: ANJANI KUMAR GOYAL. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in ARIHANT CLAN AALISHAN PHASE I?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback