Home / Browse projects / Raigarh, Maharashtra / ANANDAM - II

Registered No litigation declared Residential / Group Housing project

ANANDAM - II

By TODAY GLOBAL HOMES

RG-MH-50722 · RERA P52000048037 · Last updated on MahaRERA portal: 9 Oct 2025

Source: official MahaRERA filing

Red flags

  • 2 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
4 of 33Construction stages doneacross 3 buildings; furthest along: Excavation, 90%
308 of 807Units unsoldnot recorded sold or booked
2Complaints at MahaRERAon this registration
Jump to the 122 documents Report an error

ANANDAM - II is a Residential / Group Housing project by TODAY GLOBAL HOMES in Raigarh, Maharashtra, registered with MahaRERA as P52000048037 on 7 Dec 2022. Possession is promised by 31 Dec 2027. 499 of the 807 units on this registration are recorded sold or booked, and 4 of 33 construction stages are filed complete. 2 complaints are on record with the regulator.

At a glance

Project

  • NameANANDAM - II
  • TypeResidential / Group Housing
  • Location
    • ROHINJAN
    • PANVEL
    • Raigarh
    • 410210
  • Pincode410210
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000048037
  • ReraGenie IDRG-MH-50722

Builder

  • NameTODAY GLOBAL HOMES
  • Entity typePartnership
  • PartnersBHADRESH RAJESH SHAH, BHAVESH RAJESH SHAH, SUNIL JAGDISH AGRAWAL, RAJESH BHOGILAL SHAH
  • Other registrations3 more →
  • Completed1 of 4

Key dates

this monthRegisteredDec 2022PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on7 Dec 2022
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings3 building records
  • Documents filed122 files

Current status

62%499 of 807 units booked
52.9%Work done, per cost certificate

Figures as on 9 Oct 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING NO - 1NA23211410141
BUILDING NO - 2NA23213210321
BUILDING NO - 3NA29273450345

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 9 Oct 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Excavation, at 90%.

BUILDING NO - 120%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)25%
Plinth0%
Stilt Floor100%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING NO - 225%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)80%
Plinth0%
Stilt Floor100%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING NO - 38%
ActivityProgress
Excavation90%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 9 Oct 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed3

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots3
Closed/Covered3
BuildingClosed/CoveredTotal
BUILDING NO - 111
BUILDING NO - 211
BUILDING NO - 311

Land and ownership5

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area16,010 sq m
Land owned byThe promoter, with other names on the file
Named landowners5
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on31 Jan 2026
LandownerVillageDistrict
SHANKAR TRIMBAK PATILRohinjanRaigarh
YOGESH YASHWANT PATILRohinjanRaigarh
DHANAJI BALARAM PATILRohinjanRaigarh
KRISHNA PARSHURAM PATILRohinjanRaigarh
BHUSHAN SADASHIV PATILRohinjanRaigarh

Approvals and building plan

Sanctioning authoritypanvel municipal corporation
Permissible FSI68888.63
Proposed, not sanctioned39,267 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShop No 10 11 12Plot No 3 Ashapura Dham Building Sector 16Near Moraj ResidencyOffPalm Beach RdSanpadaNavi MumbaiMaharashtra 400705
Estimated costRs 164.55 cr
Cost incurredRs 86.99 cr
Work done52.87%
BuildingWingEstimatedIncurred
BUILDING NO - 3NARs 72.60 crRs 31.99 cr
BUILDING NO - 2NARs 61.96 crRs 35.00 cr
BUILDING NO - 1NARs 26.98 crRs 20.00 cr
-NARs 3.00 cr-

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectACUBE ARCHITECTS
EngineerSTRUCTURAL CONCEPT
Chartered AccountantLOVE KUMAR MAIDAWAT
Chartered AccountantSwati Sudhendu Patel
Chartered AccountantBhavik J Velani
Chartered AccountantBhavik Jayantilal Velani
PartnerRole in project
TODAY GLOBAL HOMES-

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
CC12600559Shashi BamneTODAY GLOBAL HOMES01/02/2026
CC12604468Rahul Raju PawarTODAY GLOBAL HOMES17/07/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 1 Oct 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 1 Oct 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 22 Sep 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 1 Oct 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed122

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 122 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2024-2025)File: Scan Form-5 TGH 8037.pdf9 Oct 2025
Building plan approvalFile: REVISED PLANS 1.pdf22 Sep 2025
Building plan approvalFile: REVISED PLANS 2.pdf22 Sep 2025
Building plan approvalFile: REVISED PLANS 3.pdf22 Sep 2025
Building plan approvalFile: REVISED PLANS 4.pdf22 Sep 2025
Building plan approvalFile: REVISED PLANS 5.pdf22 Sep 2025
Building plan approvalFile: REVISED PLANS 6.pdf22 Sep 2025
Building plan approvalFile: REVISED PLANS 7.pdf22 Sep 2025
Building plan approvalFile: REVISED PLANS 8.pdf22 Sep 2025
Building plan approvalFile: REVISED PLANS 9.pdf22 Sep 2025
Building plan approvalFile: REVISED PLANS 10.pdf22 Sep 2025
Building plan approvalFile: REVISED PLANS 11.pdf22 Sep 2025
Building plan approvalFile: REVISED PLANS 12.pdf22 Sep 2025
Building plan approvalFile: REVISED PLANS 13.pdf22 Sep 2025
Building plan approvalFile: REVISED PLANS 14.pdf22 Sep 2025
Building plan approvalFile: REVISED PLANS 15.pdf22 Sep 2025
Building plan approvalFile: REVISED PLANS 16.pdf22 Sep 2025
Building plan approvalFile: REVISED PLANS 17.pdf22 Sep 2025
Building plan approvalFile: REVISED PLANS 18.pdf22 Sep 2025
Building plan approvalFile: REVISED PLANS 19.pdf22 Sep 2025
Building plan approvalFile: REVISED PLANS 20.pdf22 Sep 2025
Building plan approvalFile: REVISED PLANS 21.pdf22 Sep 2025
Building plan approvalFile: REVISED PLANS 22.pdf22 Sep 2025
Building plan approvalFile: REVISED PLANS 23.pdf22 Sep 2025
Building plan approvalFile: REVISED PLANS 24.pdf22 Sep 2025
Building plan approvalFile: REVISED PLANS 25.pdf22 Sep 2025
Declaration and undertaking (Annexure A)File: REVISED PLANS 26.pdf22 Sep 2025
Building plan approvalFile: REVISED PLANS 27.pdf22 Sep 2025
Building plan approvalFile: REVISED PLANS 28.pdf22 Sep 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Anandam II- Form 1_0001.pdf30 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_compressed (3).pdf30 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Anandam II-Form 2_0001.pdf30 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Anandam II-Form 2A_0001.pdf30 Apr 2025
Disclosure of sold/ booked inventoryFile: TGH A-2.pdf9 Nov 2024
Disclosure of sold/ booked inventoryFile: TGH A-II.pdf9 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 A-II P-I.pdf4 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 01 A-II.pdf30 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 03 A-II com.pdf30 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 A-iI.pdf16 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 02_compressed.pdf16 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 03_compressed.pdf16 Jul 2024
Details of encumbrances concerned to FinanceFile: tgh - encumbrances.pdf28 Jun 2024
Details of encumbrances concerned to LegalFile: tgh - encumbrances.pdf28 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 0308042024Anandam 2.pdf10 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ANADAM II FORM 2.pdf10 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: ANANDAM II FORM 2A_compressed.pdf10 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ANANDAM FORM 3 CA CERTIFICATE_compressed.pdf10 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate ANANDAM II.pdf19 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Anandam 2 Phase 1ARCHITECTS CERTIFICAte.pdf16 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 anandam 2.pdf16 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: TGH A II FORM 5.pdf11 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT'S CERTIFICATE- Anandam II.pdf18 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate_Sept_Anandam II.pdf18 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_Anandam II.pdf18 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate p i.pdf12 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate p II.pdf12 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 01-ARCHITECT'S CERTIFICATE- WORK STATUS TILL-10-07-23.pdf11 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineering Certificate_0001.pdf11 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 2 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22) .pdf11 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Anandam II Qtr 1_0001_compressed (1).pdf11 Aug 2023
Disclosure of sold/ booked inventoryFile: Today Global Homes 1_0001_11zon.pdf14 Jun 2023
Disclosure of sold/ booked inventoryFile: Today Global Homes 1_0001_11zon.pdf14 Jun 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 31-12-2022.pdf13 Jun 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 31-03-2023.pdf13 Jun 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form No 3_0001 (2).pdf13 Jun 2023
Details of encumbrances concerned to FinanceFile: Encumberance Self Declaration.pdf10 Jun 2023
Details of encumbrances concerned to LegalFile: Encumberance Self Declaration.pdf10 Jun 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Anandam 2_0001_11zon.pdf25 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ANANDAM-2-ARCHITECT'S CERTIFICATE- WORK STATUS TILL-13-04-23.pdf14 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: form 2a anandam 31-12-2022.pdf8 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: form 2a anandam 31-03-2023.pdf8 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 03 - 31-03-2023-1.pdf8 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 03 - 31-12-2022-1.pdf8 Apr 2023
Proforma of Agreement for saleFile: PROFORMA OF AGREEMENT FOR SALE - 24-11-2022.pdf24 Nov 2022
Deviation Report with respect to model copy of AgreementFile: DEVIATION REPORT - 24-11-2022.pdf24 Nov 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Separate Bank Account details including no encumbrances on the Bank Account or no escrow o22 Nov 2022
Details of encumbrances concerned to FinanceFile: LETTER OF ENCUMBRANCES - FINANCE - 02-11-2022.pdf2 Nov 2022
Details of encumbrances concerned to LegalFile: LETTER OF ENCUMBRANCES - FINANCE - 02-11-2022.pdf2 Nov 2022
Details of encumbrances concerned to FinanceFile: 1 a Details of encumbrances concerned to Finance.pdf21 Oct 2022
Details of encumbrances concerned to LegalFile: 1 a Details of encumbrances concerned to Finance.pdf21 Oct 2022

How this compares with Raigarh

62%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ANANDAM - II on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near PANVEL5,900+ in Raigarh

Builder: TODAY GLOBAL HOMES

TODAY GLOBAL HOMES has 4 registrations on MahaRERA, including ANANDAM - PHASE I and ANANDAM PHASE - II. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if ANANDAM - II is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ANANDAM - II?

The registered promoter entity is TODAY GLOBAL HOMES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ANANDAM - II?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against ANANDAM - II?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for ANANDAM - II?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ANANDAM - II?

The professionals named in the filing: Architect: ACUBE ARCHITECTS; Engineer: STRUCTURAL CONCEPT; Chartered Accountant: LOVE KUMAR MAIDAWAT; Chartered Accountant: Swati Sudhendu Patel; Chartered Accountant: Bhavik J Velani; Chartered Accountant: Bhavik Jayantilal Velani. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ANANDAM - II?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ANANDAM - II. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ANANDAM - II to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.