SHREEJI DIVINE
By SHREEJI VENTURES LIFESPACES LLP
RG-MH-45434 · RERA P52000034060 · Last updated on MahaRERA portal: 27 Apr 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Rs 90.00 crore secured on the land, in favour of BAJAJ HOUSING FINANCE LIMITED
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SHREEJI DIVINE is a Others project by SHREEJI VENTURES LIFESPACES LLP in Raigarh, Maharashtra, registered with MahaRERA as P52000034060 on 17 Mar 2022. Possession is promised by 31 Mar 2027. 174 of the 521 units on this registration are recorded sold or booked, and 12 of 22 construction stages are filed complete.
At a glance
Project
- NameSHREEJI DIVINE
- TypeOthers
- Location
- AT BID
- TALUKA PANVEL
- RAIGAD
- Bid
- Panvel
- Raigarh
- 410208
- Pincode410208
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52000034060
- ReraGenie IDRG-MH-45434
Builder
- NameSHREEJI VENTURES LIFESPACES LLP
- Entity typePartnership
- GSTIN27AAYFR4893E1ZE
- PartnersDEVJI VAGHJI PATEL, DEVANG DEVJI PATEL
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on17 Mar 2022
- Promised completion31 Mar 2027
- Revised completionNone
- Buildings2 building records
- Documents filed111 files
Current status
Figures as on 27 Apr 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| SHREEJI DIVINE BUILDING NO 1 | NA | 5 | 2 | 0 | 38 | 38 |
| SHREEJI DIVINE BUILDING NO 2 | NA | 31 | 29 | 448 | 35 | 483 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 27 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
12 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Internal walls, at 25%.
SHREEJI DIVINE BUILDING NO 158%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 25% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 15% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
SHREEJI DIVINE BUILDING NO 255%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 2% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 27 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Land and ownership7
MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
| Landowner | Village | District |
|---|---|---|
| DYANESHWAR DASHRATH PATIL | Taloje Majkur | Raigarh |
| JANU HASHA GHARAT | Rohinjan | Raigarh |
| RAGHUNATH KALURAM PATIL | Rohinjan | Raigarh |
| BHAGWAN BUDHYA PATIL | Rohinjan | Raigarh |
| CHARPAT RAM PATIL | Rohinjan | Raigarh |
| DATTU GOPAL PATIL | Rohinjan | Raigarh |
| MACHHINDRA GOVIND PATIL | Rohinjan | Raigarh |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| SHREEJI DIVINE BUILDING NO 1 | NA | Rs 525.00 cr | Rs 108.66 cr |
| SHREEJI DIVINE BUILDING NO 2 | NA | Rs 525.00 cr | Rs 67.56 cr |
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | ACUBE ARCHITECTS Tupe |
| Engineer | ASCENT STRUCTURAL ENGINEERS PRIVATE LIMITED |
| Chartered Accountant | D G PATEL & ASSOCIATES |
| Partner | Role in project |
|---|---|
| SHREEJI VENTURES LIFESPACES LLP | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 12 Mar 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 7 Mar 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 7 Mar 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 7 Mar 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Mar 2027
Documents filed111
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 111 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1 March 2026.pdf | 27 Apr 2026 |
| Withdrawal Update Form 1File: Form 1 March 2026.pdf | 27 Apr 2026 |
| Withdrawal Update Form 2File: Form 2 March 2026.pdf | 27 Apr 2026 |
| Withdrawal Update Form 2File: Form 2 March 2026.pdf | 27 Apr 2026 |
| Withdrawal Update Form 3File: Form 3 March 2026.pdf | 27 Apr 2026 |
| Withdrawal Update Form 3File: Form 3 March 2026.pdf | 27 Apr 2026 |
| Withdrawal Update Form 1File: Form 1 June 2025.pdf | 23 Apr 2026 |
| Withdrawal Update Form 1File: Form 1 June 2025.pdf | 23 Apr 2026 |
| Withdrawal Update Form 1File: Form 1 Dec 2025.pdf | 23 Apr 2026 |
| Withdrawal Update Form 1File: Form 1 Dec 2025.pdf | 23 Apr 2026 |
| Withdrawal Update Form 2File: Form 2 June 2025.pdf | 23 Apr 2026 |
| Withdrawal Update Form 2File: Form 2 June 2025.pdf | 23 Apr 2026 |
| Withdrawal Update Form 2File: Form 2- Dec 25.pdf | 23 Apr 2026 |
| Withdrawal Update Form 2File: Form 2- Dec 25.pdf | 23 Apr 2026 |
| Withdrawal Update Form 3File: Form 3 June 2025.pdf | 23 Apr 2026 |
| Withdrawal Update Form 3File: Form 3 June 2025.pdf | 23 Apr 2026 |
| Withdrawal Update Form 3File: Form 3 Dec 2025.pdf | 23 Apr 2026 |
| Withdrawal Update Form 3File: Form 3 Dec 2025.pdf | 23 Apr 2026 |
| Form 2File: Form 2 - Sep 25.pdf | 2 Jan 2026 |
| Form 1File: Form 1 - Sep 25.pdf | 2 Jan 2026 |
| Form 3File: FORM 3 - Sep 25.pdf | 2 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: CIRCULAR 29_compressed.pdf | 2 Jan 2026 |
| OthersFile: Disclosure of Secured Finance Availed for Project.pdf | 2 Jan 2026 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 - Shreeji Ventures Lifespaces LLP31032025.pdf | 19 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 8 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 2 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 2 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM3 Shreeji Divine.pdf | 19 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf | 23 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 23 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM3.pdf | 22 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1.pdf | 10 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 10 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf | 10 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2.pdf | 10 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 10 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5-FY 23-24-Ravechi Lifespaces LLP.pdf | 22 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 - Shreeji Ventures Lifespaces LLP.pdf | 17 Aug 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2.pdf | 10 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SHREEJI DIVINE ARCHITECTS CERTIFICATE 22-04-2024.pdf | 30 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 - Shreeji Ventures Lifespaces LLP.pdf | 30 Apr 2024 |
| Details of encumbrancesFile: Encumbrances.pdf | 6 Jan 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5-FY 22-23-Ravechi Lifespaces LLP.pdf | 28 Nov 2023 |
| Proforma of Agreement for saleFile: RERA AGREEMENT SHREEJI DIVINE.pdf | 20 May 2023 |
| Proforma of Allotment letterFile: Allotment Letter.pdf | 20 May 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5-FY 21-22-Ravechi Lifespaces LLP.pdf | 1 Feb 2023 |
| Copy of the legal title reportFile: Legal Title Report.pdf | 12 Mar 2022 |
| Details of encumbrancesFile: Details of Encumbrance.pdf | 12 Mar 2022 |
| Declaration about Commencement CertificateFile: Format D - CC.pdf | 11 Mar 2022 |
| OtherFile: LOI PMC.pdf | 11 Mar 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Ravechi Lifespaces LLP.pdf | 8 Mar 2022 |
| OtherFile: Nardeco Certificate.pdf | 8 Mar 2022 |
| Layout approvalFile: Approved Drawings 1.pdf | 7 Mar 2022 |
| Layout approvalFile: Approved Drawings 2.pdf | 7 Mar 2022 |
| Layout approvalFile: Approved Drawings 3.pdf | 7 Mar 2022 |
| Layout approvalFile: Approved Drawings 4.pdf | 7 Mar 2022 |
| Layout approvalFile: Approved Drawings 5.pdf | 7 Mar 2022 |
| Layout approvalFile: Approved Drawings 6.pdf | 7 Mar 2022 |
| Layout approvalFile: Approved Drawings 7.pdf | 7 Mar 2022 |
| Layout approvalFile: Approved Drawings 8.pdf | 7 Mar 2022 |
| Layout approvalFile: Approved Drawings 9.pdf | 7 Mar 2022 |
| Layout approvalFile: Approved Drawings 10.pdf | 7 Mar 2022 |
| Layout approvalFile: Approved Drawings 11.pdf | 7 Mar 2022 |
| Layout approvalFile: Approved Drawings 12.pdf | 7 Mar 2022 |
| Layout approvalFile: Approved Drawings 13.pdf | 7 Mar 2022 |
| Building plan approvalFile: Approved Drawings 1.pdf | 7 Mar 2022 |
| Building plan approvalFile: Approved Drawings 2.pdf | 7 Mar 2022 |
| Building plan approvalFile: Approved Drawings 3.pdf | 7 Mar 2022 |
| Building plan approvalFile: Approved Drawings 4.pdf | 7 Mar 2022 |
| Building plan approvalFile: Approved Drawings 5.pdf | 7 Mar 2022 |
| Building plan approvalFile: Approved Drawings 6.pdf | 7 Mar 2022 |
| Building plan approvalFile: Approved Drawings 7.pdf | 7 Mar 2022 |
| Building plan approvalFile: Approved Drawings 8.pdf | 7 Mar 2022 |
| Building plan approvalFile: Approved Drawings 9.pdf | 7 Mar 2022 |
| Building plan approvalFile: Approved Drawings 10.pdf | 7 Mar 2022 |
| Building plan approvalFile: Approved Drawings 11.pdf | 7 Mar 2022 |
| Building plan approvalFile: Approved Drawings 12.pdf | 7 Mar 2022 |
| Building plan approvalFile: Approved Drawings 13.pdf | 7 Mar 2022 |
| PAN CardFile: Ravechi Lifespaces LLP PAN.pdf | 7 Mar 2022 |
| Copy of Layout Approval (in case of layout)File: Approved Drawings 1.pdf | 7 Mar 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Raigarh
Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.
Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 111 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep SHREEJI DIVINE on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near RAIGAD5,900+ in Raigarh
Filed coordinates, straight-line distance. 88 registered projects within 2 km.
Plot No -1 Sector -29 Taloja
CITY AND INDUSTRIAL DEVELOPMENT CORPORATIO
Plot No.-1 Sector -39 Taloja
CITY AND INDUSTRIAL DEVELOPMENT CORPORATIO
Plot No -1 Sector -31 Taloja
CITY AND INDUSTRIAL DEVELOPMENT CORPORATIO
SAI SUNCITY PHASE II
Chariot Properties LLP
Plot No. 14 Sector-37 Taloja
CITY AND INDUSTRIAL DEVELOPMENT CORPORATIO
ARIHANT ADARSH PHASE I
ARIHANT SUPERSTRUCTURES LIMITED
See every Raigarh project, with the district possession charts
Builder: SHREEJI VENTURES LIFESPACES LLP
SHREEJI VENTURES LIFESPACES LLP has 1 registration on MahaRERA, including SHREEJI DIVINE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.
Frequently asked questions
What are my rights if SHREEJI DIVINE is delayed beyond 31 Mar 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SHREEJI DIVINE?
The registered promoter entity is SHREEJI VENTURES LIFESPACES LLP, a partnership as per the filing. Its GSTIN 27AAYFR4893E1ZE can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SHREEJI DIVINE?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SHREEJI DIVINE?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SHREEJI DIVINE?
The professionals named in the filing: Architect: ACUBE ARCHITECTS Tupe; Engineer: ASCENT STRUCTURAL ENGINEERS PRIVATE LIMITED; Chartered Accountant: D G PATEL & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SHREEJI DIVINE?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback