Home / Browse projects / Nashik, Maharashtra / MAA BHAGWATI RESIDENCY APARTMENT

Registered No litigation declared Others project

MAA BHAGWATI RESIDENCY APARTMENT

By ROONGTA LANDMARKS LLP

RG-MH-14999 · RERA P51600033773 · Last updated on MahaRERA portal: 12 Aug 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 24 months
  • 1 extension taken
  • Rs 30.00 crore secured on the land, in favour of ICICI BANK LTD
  • The declared charge does not appear in the CERSAI report on the filing

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • All 2 earlier projects delivered on promise

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.
Mar 2029Possession promisedmoved 24 months from the original
12 of 44Construction stages doneacross 4 buildings; furthest along: Slabs of Super Structure, 89%
199 of 266Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 103 documents Report an error

MAA BHAGWATI RESIDENCY APARTMENT is a Others project by ROONGTA LANDMARKS LLP in Nashik, Maharashtra, registered with MahaRERA as P51600033773 on 8 Mar 2022. Possession is promised by 31 Mar 2029. The completion date has moved by 24 months from the original filing. 67 of the 266 units on this registration are recorded sold or booked, and 12 of 44 construction stages are filed complete.

At a glance

Project

  • NameMAA BHAGWATI RESIDENCY APARTMENT
  • TypeOthers
  • Location
    • RANE NAGAR
    • NASHIK
    • Nashik (M Corp.)
    • 422009
  • Pincode422009
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51600033773
  • ReraGenie IDRG-MH-14999

Builder

  • NameROONGTA LANDMARKS LLP
  • Entity typePartnership
  • PartnersAKHIL LALIT ROONGTA, NIKHIL LALIT ROONGTA, LALIT ROONGTA
  • Other registrations5 more →
  • Completed4 of 6
  • Past their filed date1
  • Declared earlier projects2 →

Key dates

this monthRegisteredMar 2022First promiseMar 2027Revised toMar 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on8 Mar 2022
  • Promised completion31 Mar 2029
  • Revised completionRevised to 31 Mar 2029 (originally 31 Mar 2027)
  • Buildings4 building records
  • Documents filed103 files

Current status

25%67 of 266 units booked
44.8%Work done, per cost certificate

Figures as on 12 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
MAA BHAGWATI RESIDENCY APARTMENT-A WINGNA1615522274
MAA BHAGWATI RESIDENCY APARTMENT-B WINGNA2019682088
MAA BHAGWATI RESIDENCY APARTMENT-C WINGNA161352052
MAA BHAGWATI RESIDENCY APARTMENT-D WINGNA161352052

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 12 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

12 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Slabs of Super Structure, at 89%.

MAA BHAGWATI RESIDENCY APARTMENT-A WING43%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure89%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises43%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.24%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.21%
MAA BHAGWATI RESIDENCY APARTMENT-B WING35%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure61%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises17%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.2%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.1%
MAA BHAGWATI RESIDENCY APARTMENT-C WING39%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure84%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises39%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.1%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.2%
MAA BHAGWATI RESIDENCY APARTMENT-D WING39%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure89%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises39%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.1%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.2%

Progress on shared amenities15

As on 12 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area6,230 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofICICI BANK LTD
Secured amountRs 30.00 crore
CERSAI search filedYes
Declared on12 Jul 2025

Approvals and building plan

Sanctioning authorityNASHIK MUNICIPAL CORPORATION
Permissible FSI25391.61
Proposed, not sanctioned25,392 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchTIDKE COLONY , NASHIK
Estimated costRs 57.15 cr
Cost incurredRs 25.62 cr
Work done44.83%
BuildingWingEstimatedIncurred
MAA BHAGWATI RESIDENCY APARTMENT-B WINGNARs 18.48 crRs 1.65 cr
MAA BHAGWATI RESIDENCY APARTMENT-A WINGNARs 17.09 crRs 8.28 cr
MAA BHAGWATI RESIDENCY APARTMENT-C WINGNARs 9.54 crRs 6.93 cr
MAA BHAGWATI RESIDENCY APARTMENT-D WINGNARs 9.54 crRs 8.76 cr
-NARs 2.50 cr-

Certifying professionals and partners9

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSAGAR KABRE
EngineerMR SANJEEV PATEL
EngineerAMOL YADAVRAO BHALERAO
EngineerGANESH MALU
Chartered AccountantPravin R. Rathi & Associates
Chartered AccountantPRANAV S LAHOTI & CO CHARTERED ACCOUNTANTS
Chartered AccountantPRANAV LAHOTI
Chartered AccountantPRAVIN R RATHI & ASSOCIATES FRN 131494W
Chartered AccountantMS MAHENDRA JADHAV AND ASSOCIATES
PartnerRole in project
ROONGTA LANDMARKS LLP-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA15072502065Mar 2027 → Mar 2029

Reason as filed by the promoter“We have revised our project layout through an approved plan dated 27.01.2025, and have accordingly uploaded all relevant documents related to this revision on the MahaRERA portal. As part of this revised plan, additional floors were proposed in Wing B of the project. In accordance with applicable norms, obtaining an updated Environmental Clearance (EC) is mandatory for the added floors. However, the grant of the required EC is currently under judicial consideration in the Hon’ble Supreme Court of India, and the process has been stayed pending further orders. As a result, construction activiti

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 26 Feb 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 24 Feb 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 25 Mar 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 7 Feb 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2029

Documents filed103

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 103 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Maa Bhagwati Architect Cert Form 1 01072026.pdf12 Aug 2026
Withdrawal Update Form 2File: FORM 2 Q1 MBR.pdf12 Aug 2026
Withdrawal Update Form 3File: FORM 3 MBR Q1.pdf12 Aug 2026
Form 2A (FY 2025-2026)File: FORM 2A MBR 25-26.pdf27 May 2026
Withdrawal Update Form 1File: Maa Bhagwati Architect Cert Form 1 01042026.pdf18 May 2026
Withdrawal Update Form 2File: FORM 2 Q4 MBR.pdf18 May 2026
Withdrawal Update Form 3File: MBR Q4.pdf18 May 2026
Withdrawal Update Form 1File: Maa Bhagwati Architect Cert.pdf10 Feb 2026
Withdrawal Update Form 2File: FORM 2 Q3 MBR.pdf10 Feb 2026
Withdrawal Update Form 3File: MBR Q3 31122025.pdf10 Feb 2026
Form 5 (FY 2024-2025)File: FORM 5 MBR.pdf22 Nov 2025
Withdrawal Update Form 1File: FORM 1-MBR-01102025.pdf18 Nov 2025
Withdrawal Update Form 1File: FORM 1-MBR 01072025.pdf18 Nov 2025
Withdrawal Update Form 2File: FORM 2 01102025.pdf18 Nov 2025
Withdrawal Update Form 2File: FORM 2 01072025.pdf18 Nov 2025
Withdrawal Update Form 3File: Q2 FORM 3_compressed.pdf18 Nov 2025
Withdrawal Update Form 3File: Q1 form 3_compressed.pdf18 Nov 2025
Form 1File: FORM 1-MBR-01042025.pdf20 Jun 2025
Form 2File: FORM 2-MBR-01042025.pdf20 Jun 2025
Form 3File: FORM 3-MBR_01042025.pdf20 Jun 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD-MBR-FY24-25.pdf20 Jun 2025
Self-declaration of Quarterly ProgressFile: MBR CERSAI MAR 25.pdf20 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-MBR-01042025.pdf30 Apr 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD-MBR-FY24-25.pdf24 Apr 2025
Other - TechnicalFile: FORM 2A_MBR_FY 24-25.pdf12 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf3 Apr 2025
Building plan approvalFile: 1.pdf25 Mar 2025
Building plan approvalFile: 2.pdf25 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: 1.pdf25 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: 2.pdf25 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certi_MBR 01012025.pdf4 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2_MBR_01102024.pdf4 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2_MBR_01012025.pdf4 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Q3 MBR.pdf15 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate-Maa Bhagwati qtr1 24-25.pdf7 Feb 2025
Commencement Certificates / NA Order for plotted developmentFile: Revi commencment.pdf7 Feb 2025
Declaration about Commencement CertificateFile: FORMAT D MBR REVISED.pdf7 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Maa Bhagwati_Form 1_Q1(24-25).pdf23 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 MAA BHAGWATI Q2.pdf18 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold-MBR-Q3.pdf18 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5-Maa Bhagwati-FY 23-24.pdf18 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-MBR-Q2.pdf18 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-MBR-Q2.pdf18 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5-Maa Bhagwati-FY 23-24.pdf18 Nov 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold_Maa Bhagwati_Q2 24-25.pdf21 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Maa Bhagwati_Q1 24-25.pdf13 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Maa Bhagwati_Form 1_Q1(24-25).pdf12 Jul 2024
Disclosure of sold/ booked inventoryFile: MBR_SOLD UNSOLD INVENTORY_Q1.pdf6 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 MBR Q4.pdf7 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: MBR FORM 2 Q4.pdf6 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 10 FORM 1 MBR Q4.pdf1 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: MAA BHAGWATI MAR 24.pdf1 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 MBR Q4.pdf1 May 2024
CERSAI detailsFile: CERSAI_MBR.pdf27 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: MAA BHAGWATI MARCH 23.pdf22 Apr 2024
Other - TechnicalFile: MAA BHAGWATI MAR 24.pdf22 Apr 2024
Disclosure of sold/ booked inventoryFile: MBR 31032024.pdf20 Apr 2024
Details of encumbrancesFile: INDEX 2 MORTGAGE MBR.pdf22 Mar 2024
Details of encumbrances concerned to FinanceFile: INDEX 2 MORTGAGE MBR.pdf22 Mar 2024
Details of encumbrances concerned to LegalFile: INDEX 2 MORTGAGE MBR.pdf22 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 9 Maa Bhagwati_Form-2 Q3.pdf3 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 9 Maa BHagwatiQ3 01012024.pdf24 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Maa BHagwati.pdf24 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Maa BHagwati.pdf22 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: MAA BHAGWATI FORM 2 Q1.pdf13 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: MAA BHAGWATI FORM 2 Q2.pdf13 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: MAA BHAGWATI Q2 01102023.pdf4 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: MAA BHAGWATI Q1 01072023.pdf4 Jan 2024
Disclosure of sold/ booked inventoryFile: MAA BHAGWATI Q3.pdf4 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Q1.pdf22 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Q2.pdf22 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: MAA BHAGAWATI.pdf30 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 MAA BHAGWATI Q4_compressed.pdf23 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 MAA BHAGWATI FY 22-23_compressed.pdf23 Oct 2023
Disclosure of sold/ booked inventoryFile: MAA BHAGWATI.pdf19 Oct 2023
Disclosure of sold/ booked inventoryFile: MBR 30062023.pdf26 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: MAA BHAGWATI.pdf15 May 2023
CERSAI detailsFile: CERSAI_MAA BHAGWATI.pdf26 Apr 2023
Disclosure of sold/ booked inventoryFile: MAA BHAGWATI.pdf21 Apr 2023
Other - TechnicalFile: MAA BHAGWATI.pdf21 Apr 2023

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise
ProjectLocationFlatsRegisteredStatusPromisedDelivered
ROONGTA LIFESTYLE VILLASP51600030728NASHIK, Nashik42Sep 2021CompletedApr 2023Mar 2023
ROONGTA CENTRAL PARK APARTMENTP51600022518NAHSIK, Nashik194Sep 2019CompletedMar 2023Jan 2021

How this compares with Nashik

25%of this project is bookeddistrict median 17%
10%of Nashik projects moved their completion datethis one moved by 24 months
19%of Nashik registrations have lapsed or been cancelledthis one is on the register

Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.

Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep MAA BHAGWATI RESIDENCY APARTMENT on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NASHIK4,100+ in Nashik

2 kmMAA BHAGWATI RESIDENCY ACompleted 103Lapsed / revoked 26Other 64Dot size: filed unitsN

Filed coordinates, straight-line distance. 193 registered projects within 2 km.

Builder: ROONGTA LANDMARKS LLP

ROONGTA LANDMARKS LLP has 6 registrations on MahaRERA, including ROONGTA CENTRAL PARK APARTMENT and ROONGTA FUTUREX APARTMENT. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Nashik district page.

Frequently asked questions

What are my rights if MAA BHAGWATI RESIDENCY APARTMENT is delayed beyond 31 Mar 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of MAA BHAGWATI RESIDENCY APARTMENT?

The registered promoter entity is ROONGTA LANDMARKS LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in MAA BHAGWATI RESIDENCY APARTMENT?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for MAA BHAGWATI RESIDENCY APARTMENT?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at MAA BHAGWATI RESIDENCY APARTMENT?

The professionals named in the filing: Architect: SAGAR KABRE; Engineer: MR SANJEEV PATEL; Engineer: AMOL YADAVRAO BHALERAO; Engineer: GANESH MALU; Chartered Accountant: Pravin R. Rathi & Associates; Chartered Accountant: PRANAV S LAHOTI & CO CHARTERED ACCOUNTANTS. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MAA BHAGWATI RESIDENCY APARTMENT?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MAA BHAGWATI RESIDENCY APARTMENT. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MAA BHAGWATI RESIDENCY APARTMENT to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.