Registration lapsed No litigation declared Residential / Group Housing project

Neelkamal Sarita Phase 2

By Shree Neelkamal Housing & Infrastructure

RG-MH-15570 · RERA P51600045682 · Last updated on MahaRERA portal: 16 Jun 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 10 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.
Dec 2025Possession promised10 months past this date
0 of 44Construction stages doneacross 4 buildings; furthest along: Excavation, 0%
224 of 224Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 54 documents Report an error

Neelkamal Sarita Phase 2 is a Residential / Group Housing project by Shree Neelkamal Housing & Infrastructure in Nashik, Maharashtra, registered with MahaRERA as P51600045682 on 6 Jun 2022. Possession was promised by 31 Dec 2025 and is now 10 months past that date. 0 of the 224 units on this registration are recorded sold or booked, and 0 of 44 construction stages are filed complete.

At a glance

Project

  • NameNeelkamal Sarita Phase 2
  • TypeResidential / Group Housing
  • Location
    • Near Akrale Phata
    • Next to Unnati School
    • Talegaon(Dindori)
    • Dindori
    • Nashik
    • 422202
  • Pincode422202
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51600045682
  • ReraGenie IDRG-MH-15570

Builder

  • NameShree Neelkamal Housing & Infrastructure
  • Entity typePartnership
  • GSTIN27ADOFS7956A1ZN
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnersNilesh Khodidas Patel, Haresh Khodidas Patel, Dharam Nilesh Patel, Ashwani Gupta
  • Other registrations3 more →
  • No longer live1 lapsed, de-registered or revoked

Key dates

10 months past promisethis monthRegisteredJun 2022PromisedDec 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on6 Jun 2022
  • Promised completion31 Dec 2025
  • Revised completionNone
  • Buildings4 building records
  • Documents filed54 files

Current status

0%0 of 224 units booked
0.4%Work done, per cost certificate

Figures as on 16 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Banganga - Type A5NA9856056
Bhagirathi - Type A6NA9856056
Bhima - Type A7NA9856056
Brahmaputra - Type A8NA9856056

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 16 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Excavation, at 0%.

Banganga - Type A50%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Bhagirathi - Type A60%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Bhima - Type A70%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Brahmaputra - Type A80%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 16 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed64

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots64
Closed/Covered64
BuildingClosed/CoveredTotal
Banganga - Type A51616
Bhagirathi - Type A61616
Bhima - Type A71616
Brahmaputra - Type A81616

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,452 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityNashik Metropolitan Region Development Authority
Permissible FSI9801.08
Proposed, not sanctioned9,801 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchNeelkamal House, Thatte Nagar, College Road, Nashik - 422005
Estimated costRs 16.08 cr
Cost incurredRs 7.05 lakh
Work done0.44%
BuildingWingEstimatedIncurred
Banganga - Type A5NARs 3.90 cr-
Bhagirathi - Type A6NARs 3.90 cr-
Bhima - Type A7NARs 3.90 cr-
Brahmaputra - Type A8NARs 3.90 cr-
-NARs 47.00 lakhRs 7.05 lakh

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectNitin Patel
ArchitectRahul Ghiya
EngineerSanjeev Patel
EngineerSagar Shah
Chartered AccountantNirav Shah
Chartered AccountantSaril Shah & Associates
Chartered AccountantNirav Shailesh Shah & Co.
PartnerRole in project
Shree Neelkamal Housing & Infrastructure-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 21 May 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 5 May 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 5 May 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 5 May 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed54

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2025-2026)File: Form 5 - 2025-26.pdf16 Jun 2026
Withdrawal Update Form 1File: Form 1 25-26 Q3.pdf31 Dec 2025
Withdrawal Update Form 2File: Form 2 25-26 Q3.pdf31 Dec 2025
Withdrawal Update Form 3File: Form 3 25-26 Q3.pdf31 Dec 2025
Form 1File: Form 1.pdf27 Dec 2025
Form 2File: Form 2.pdf27 Dec 2025
Form 3File: Form 3.pdf27 Dec 2025
Disclosure of Sold and Booked InventoryFile: Inventory 31-12-2024.pdf27 Dec 2025
Form 1File: Form 1 24-25 Q4.pdf27 Dec 2025
Form 2File: Form 2 24-25 Q4.pdf27 Dec 2025
Form 3File: Form 3 SD 24-25 Q4.pdf27 Dec 2025
Disclosure of Sold and Booked InventoryFile: Inventory 31-03-2025.pdf27 Dec 2025
Form 1File: Form 1 25-26 Q1.pdf27 Dec 2025
Form 2File: Form 2 25-26 Q1.pdf27 Dec 2025
Form 3File: Form 3 SD 25-26 Q1.pdf27 Dec 2025
Disclosure of Sold and Booked InventoryFile: Inventory 30-06-2025.pdf27 Dec 2025
Form 1File: Form 1 25-26 Q2.pdf27 Dec 2025
Form 2File: Form 2 25-26 Q2.pdf27 Dec 2025
Form 3File: Form 3 SD 25-26 Q2.pdf27 Dec 2025
Disclosure of Sold and Booked InventoryFile: Inventory 30-09-2025.pdf27 Dec 2025
Form 5 (FY 2022-2023)File: Form 5 - 2022-23.pdf27 Dec 2025
Form 5 (FY 2023-2024)File: Form 5 - 2023-24.pdf27 Dec 2025
Form 5 (FY 2024-2025)File: Form 5 - 2024-25.pdf27 Dec 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 24-25 Q4.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 SD 24-25 Q4.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 24-25 Q4.pdf19 Apr 2025
Disclosure of sold/ booked inventoryFile: Inventory 24-25 Q4.pdf19 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A - 2024.pdf23 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - 2023-24.pdf8 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf7 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf7 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf7 Nov 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A - Bank Accounts.pdf7 Nov 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format B - Bank Accounts.pdf7 Nov 2024
Disclosure for secured/unsecured finance availed for the projectFile: Secured Unsecured Finance.pdf7 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 - 2022-23.pdf7 Feb 2024
CERSAI detailsFile: Cersai Report.pdf23 May 2022
Proforma of Allotment letterFile: Allottment Letter.pdf23 May 2022
Proforma of Allotment letterFile: Agreement for Sale.pdf23 May 2022
Copy of the legal title reportFile: Title Report.pdf21 May 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf7 May 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf7 May 2022
Layout approvalFile: Plot Layout.pdf5 May 2022
Building plan approvalFile: SP 1.pdf5 May 2022
Building plan approvalFile: SP 2.pdf5 May 2022
PAN CardFile: PAN.pdf5 May 2022
Details of encumbrancesFile: No Encumbrance.pdf5 May 2022
Copy of Layout Approval (in case of layout)File: Plot Layout.pdf5 May 2022
Building Plan Approval / NA Order for plotted developmentFile: SP 1.pdf5 May 2022
Building Plan Approval / NA Order for plotted developmentFile: SP 2.pdf5 May 2022
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf5 May 2022
Declaration about Commencement CertificateFile: Declaration About CC.pdf5 May 2022
Declaration in FORM BFile: Form B.pdf5 May 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf5 May 2022

How this compares with Nashik

0%of this project is bookeddistrict median 17%
10%of Nashik projects moved their completion datethis one has not
19%of Nashik registrations have lapsed or been cancelledthis one is among them

Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.

Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Neelkamal Sarita Phase 2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Next to Unnati School4,100+ in Nashik

Builder: Shree Neelkamal Housing & Infrastructure

Shree Neelkamal Housing & Infrastructure has 4 registrations on MahaRERA, including Neelkamal Sarita Phase 1 and Neelkamal Sarita Phase 2. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nashik district page.

Frequently asked questions

What does it mean that Neelkamal Sarita Phase 2 shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Neelkamal Sarita Phase 2 is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Neelkamal Sarita Phase 2?

The registered promoter entity is Shree Neelkamal Housing & Infrastructure, a partnership as per the filing. Its GSTIN 27ADOFS7956A1ZN can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Neelkamal Sarita Phase 2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Neelkamal Sarita Phase 2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Neelkamal Sarita Phase 2?

The professionals named in the filing: Architect: Nitin Patel; Architect: Rahul Ghiya; Engineer: Sanjeev Patel; Engineer: Sagar Shah; Chartered Accountant: Nirav Shah; Chartered Accountant: Saril Shah & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Neelkamal Sarita Phase 2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Neelkamal Sarita Phase 2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Neelkamal Sarita Phase 2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.