Home / Browse projects / Nashik, Maharashtra / SHYAM ANANTA

Registered No litigation declared Others project

SHYAM ANANTA

By SHREE SHYAM INFRA

RG-MH-07054 · RERA P51600056374 · Last updated on MahaRERA portal: 26 Jun 2026

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.
May 2029Possession promisedno revision filed
11 of 33Construction stages doneacross 3 buildings; furthest along: Basement (if any), 80%
144 of 254Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 97 documents Report an error

SHYAM ANANTA is a Others project by SHREE SHYAM INFRA in Nashik, Maharashtra, registered with MahaRERA as P51600056374 on 31 May 2024. Possession is promised by 1 May 2029. 110 of the 254 units on this registration are recorded sold or booked, and 11 of 33 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameSHYAM ANANTA
  • TypeOthers
  • Location
    • Plot No 01 of S.No.885/A/1/2/885/A/2/49
    • Nashik Shiwar Rane Nagar Indira Nagar
    • Nashik
    • 422009
  • Pincode422009
  • RERA no.P51600056374
  • ReraGenie IDRG-MH-07054

Builder

  • NameSHREE SHYAM INFRA
  • Entity typePartnership
  • PartnersSHARDABEN MADHUBHAI VAGHELA, NILAM JAGDISHBHAI VAGHELA, NEETA MEHULKUMAR VAGHELA, HIREN PARSOTTAMBHAI VAGHELA, VIJAY PARSHOTTAMBHAI VAGHELA, CHANDULAL HANSRAJ PATEL, KISHOR VITTHALBHAI SITAPARA, ARVINDBHAI MAGANBHAI SITAPARA, PIYUSHKUMAR KANTILAL SODHA, DHARMIK CHANDRESHBHAI SODHA, NIHAR CHANDRESHBHAI SODHA

Key dates

this monthRegisteredMay 2024PromisedMay 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on31 May 2024
  • Promised completion1 May 2029
  • Revised completionNone
  • Buildings3 building records
  • Documents filed97 files

Current status

43%110 of 254 units booked
15.8%Work done, per cost certificate

Figures as on 26 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SHYAM ANANTA A WINGNA21216256118
SHYAM ANANTA B WINGNA212168068
SHYAM ANANTA C WINGNA202068068

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 26 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Basement (if any), at 80%.

SHYAM ANANTA A WING53%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure50%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises35%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
SHYAM ANANTA B WING53%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure50%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises35%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
SHYAM ANANTA C WING16%
ActivityProgress
Excavation100%
Basement (if any)80%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 26 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed210

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots210
Closed/Covered160
Open Space50
BuildingClosed/CoveredOpen SpaceTotal
SHYAM ANANTA A WING601070
SHYAM ANANTA B WING482068
SHYAM ANANTA C WING522072

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area5,094 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityNashik Municipal Corporation
Permissible FSI19886.66
Proposed, not sanctioned19,887 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchOffice No 11 First Floor CTS No 5867/15 and 5868/A-2 Surya Arcade Opp Nimani Bus Stop Panchvati Nash
Estimated costRs 69.00 cr
Cost incurredRs 10.91 cr
Work done15.82%
BuildingWingEstimatedIncurred
SHYAM ANANTA A WINGNARs 28.34 crRs 5.56 cr
SHYAM ANANTA C WINGNARs 20.40 crRs 1.60 cr
SHYAM ANANTA B WINGNARs 18.27 crRs 3.58 cr
-NARs 2.00 crRs 17.51 lakh

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPankaj Jadhav
EngineerShailesh P Dhumne
EngineerAtul Sadashiv Katare
Chartered AccountantAPPS AND ASSOCIATES
Chartered AccountantAnuj Ashwin Bafna
PartnerRole in project
SHREE SHYAM INFRA-

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
SM12500062Ram GawaliSHREE SHYAM INFRA28/05/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 11 May 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 9 May 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 9 May 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 24 May 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 1 May 2029

Documents filed97

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 97 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: shyam ananta form 2A 25-26.pdf26 Jun 2026
Withdrawal Update Form 1File: form -1 Ananta mar-26.pdf30 Apr 2026
Withdrawal Update Form 2File: form -2 Ananta mar-26.pdf30 Apr 2026
Withdrawal Update Form 3File: Ananta form -3 mar -26_compressed.pdf30 Apr 2026
Withdrawal Update Form 1File: Form 1 -Final.pdf31 Jan 2026
Withdrawal Update Form 2File: form -2 ananta dec-25.pdf31 Jan 2026
Withdrawal Update Form 3File: Form 3 Final_compressed.pdf31 Jan 2026
Withdrawal Update Form 1File: form -1 ananta jun -25.pdf4 Nov 2025
Withdrawal Update Form 1File: form -1 sep-25 ananta.pdf4 Nov 2025
Withdrawal Update Form 2File: form -2 ananta jun -25.pdf4 Nov 2025
Withdrawal Update Form 2File: form -2 sep-25 ananta.pdf4 Nov 2025
Withdrawal Update Form 3File: form -3 jun -25_11zon.pdf4 Nov 2025
Withdrawal Update Form 3File: form -3 ananta sep 25.pdf4 Nov 2025
Form 5 (FY 2024-2025)File: Form 5 client sign.pdf29 Sep 2025
Form 1File: form 1.pdf18 Aug 2025
Form 2File: FORM-2.pdf18 Aug 2025
Form 3File: Form 3.pdf18 Aug 2025
Disclosure of Sold and Booked InventoryFile: 30 jun -24 sold unsold.pdf18 Aug 2025
Form 1File: architect certificate form -1 sep.pdf18 Aug 2025
Form 2File: engineering certificate form -2 sep.pdf18 Aug 2025
Form 3File: ca certificate 30-9-2024.pdf18 Aug 2025
Disclosure of Sold and Booked InventoryFile: sep -24 sold unsold.pdf18 Aug 2025
Form 1File: form -1 architect certificate 31-12-2024.pdf18 Aug 2025
Form 2File: form -2 engineer certificate 31-12-2024.pdf18 Aug 2025
Form 3File: CA certificate 31-12-2024.pdf18 Aug 2025
Disclosure of Sold and Booked InventoryFile: dec-24 sold unsold.pdf18 Aug 2025
Withdrawal Update Form 1File: form -1 ananta jun -25.pdf15 Aug 2025
Withdrawal Update Form 2File: form -2 ananta jun -25.pdf15 Aug 2025
Withdrawal Update Form 3File: form -3 jun -25_11zon.pdf15 Aug 2025
Withdrawal Update Form 1File: form -1 ananta jun -25.pdf12 Aug 2025
Withdrawal Update Form 2File: form -2 ananta jun -25.pdf12 Aug 2025
Withdrawal Update Form 3File: Form 3.pdf12 Aug 2025
Form 1File: form-1 ananta mar-25.pdf25 Jul 2025
Form 2File: form -2 ananta mar-25.pdf25 Jul 2025
Form 3File: form-3 Ananta mar 25.pdf25 Jul 2025
Disclosure of Sold and Booked InventoryFile: sold unsold 31-3-2025 with letter head.pdf25 Jul 2025
Form 2A (FY 2024-2025)File: form 2A shyam Ananta.pdf23 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form-3 Ananta.pdf8 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect certificate form -1 sep.pdf7 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form -1 architect certificate 31-12-2024.pdf7 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ca certificate 30-9-2024.pdf7 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate 31-12-2024.pdf7 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineering certificate form -2 sep.pdf7 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form -2 engineer certificate 31-12-2024.pdf7 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf13 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2.pdf5 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf5 Aug 2024
Commencement Certificates / NA Order for plotted developmentFile: Commencement and CC Authentiacation Mail.pdf24 May 2024
Other - LegalFile: 885 - sale deed Final_11zon.pdf24 May 2024
Other - LegalFile: 7 12 nashik 885.pdf24 May 2024
Other - LegalFile: Partnership Deed_Final_11zon.pdf24 May 2024
Commencement Certificates / NA Order for plotted developmentFile: Final commencement shyam infra.pdf18 May 2024
Other - TechnicalFile: 18 Declaration About One Registration on One Plot - Other Tech.pdf14 May 2024
Copy of the legal title reportFile: 2 Final to upload - Legal Title - Final Ready to upload.pdf11 May 2024
Details of encumbrances concerned to FinanceFile: 3 declaration of encumbrances concerned to finance - shree shyam infra - Final Ready To Up11 May 2024
Details of encumbrances concerned to FinanceFile: 4 declaration of encumbrances concerned to legal - shree shyam infra - Final Ready to Uplo11 May 2024
Details of encumbrances concerned to LegalFile: 3 declaration of encumbrances concerned to finance - shree shyam infra - Final Ready To Up11 May 2024
Details of encumbrances concerned to LegalFile: 4 declaration of encumbrances concerned to legal - shree shyam infra - Final Ready to Uplo11 May 2024
Declaration about Commencement CertificateFile: 7 Format D - Commencement - Final Ready to Upload.pdf11 May 2024
CERSAI detailsFile: CERSAI_Search_merged Final.pdf11 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FROM 3 - Final Ready To Upload_11zon.pdf11 May 2024
Proforma of Agreement for saleFile: AFS - Final Checked Ready to upload.pdf11 May 2024
Proforma of Allotment letterFile: 12 Final Allotment Letter - Final Ready to upload.pdf11 May 2024
Layout approvalFile: 885-1 - Parking Totals.pdf9 May 2024
Layout approvalFile: 885-2 - Parking.pdf9 May 2024
Layout approvalFile: 885-3.pdf9 May 2024
Layout approvalFile: 885-4.pdf9 May 2024
Layout approvalFile: 885-5 - Area.pdf9 May 2024
Layout approvalFile: 885-6.pdf9 May 2024
Layout approvalFile: 885-7.pdf9 May 2024
Building plan approvalFile: 885-1 - Parking Totals.pdf9 May 2024
Building plan approvalFile: 885-2 - Parking.pdf9 May 2024
Building plan approvalFile: 885-3.pdf9 May 2024
Building plan approvalFile: 885-4.pdf9 May 2024
Building plan approvalFile: 885-5 - Area.pdf9 May 2024
Building plan approvalFile: 885-6.pdf9 May 2024
Building plan approvalFile: 885-7.pdf9 May 2024
PAN CardFile: Shree Shyam Ananta Pan Copy.pdf9 May 2024
Copy of Layout Approval (in case of layout)File: 885-1 - Parking Totals.pdf9 May 2024
Copy of Layout Approval (in case of layout)File: 885-2 - Parking.pdf9 May 2024

How this compares with Nashik

43%of this project is bookeddistrict median 17%
10%of Nashik projects moved their completion datethis one has not
19%of Nashik registrations have lapsed or been cancelledthis one is on the register

Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.

Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SHYAM ANANTA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Nashik Shiwar Rane Nagar Indira Nagar4,100+ in Nashik

Builder: SHREE SHYAM INFRA

SHREE SHYAM INFRA has 1 registration on MahaRERA, including SHYAM ANANTA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nashik district page.

Frequently asked questions

What are my rights if SHYAM ANANTA is delayed beyond 1 May 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHYAM ANANTA?

The registered promoter entity is SHREE SHYAM INFRA, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHYAM ANANTA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against SHYAM ANANTA?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for SHYAM ANANTA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHYAM ANANTA?

The professionals named in the filing: Architect: Pankaj Jadhav; Engineer: Shailesh P Dhumne; Engineer: Atul Sadashiv Katare; Chartered Accountant: APPS AND ASSOCIATES; Chartered Accountant: Anuj Ashwin Bafna. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHYAM ANANTA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHYAM ANANTA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHYAM ANANTA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.