Home / Browse projects / Nashik, Maharashtra / LIFE 360

Registered No litigation declared Residential / Group Housing project

LIFE 360

By VELOCITY INFRA PROJECTS

RG-MH-57542 · RERA P51600052232 · Last updated on MahaRERA portal: 13 Sep 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 4 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.
Apr 2028Possession promisedmoved 4 months from the original
2 of 66Construction stages doneacross 6 buildings; furthest along: Stilt Floor, 95%
747 of 985Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 118 documents Report an error

LIFE 360 is a Residential / Group Housing project by VELOCITY INFRA PROJECTS in Nashik, Maharashtra, registered with MahaRERA as P51600052232 on 31 Jul 2023. Possession is promised by 30 Apr 2028. The completion date has moved by 4 months from the original filing. 238 of the 985 units on this registration are recorded sold or booked, and 2 of 66 construction stages are filed complete.

At a glance

Project

  • NameLIFE 360
  • TypeResidential / Group Housing
  • Location
    • JUNNARE NAGAR
    • PATHARDI SHIWAR
    • Nashik (M Corp.)
    • Nashik
    • 422010
  • Pincode422010
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51600052232
  • ReraGenie IDRG-MH-57542

Builder

  • NameVELOCITY INFRA PROJECTS
  • Entity typePartnership
  • PartnersSUNITA VIJAY SANAP, VIJAY KISAN SANAP, Santosh Parmanand Kothawale, Amol Vasant More

Key dates

this monthRegisteredJul 2023First promiseDec 2027Revised toApr 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on31 Jul 2023
  • Promised completion30 Apr 2028
  • Revised completionRevised to 30 Apr 2028 (originally 31 Dec 2027)
  • Buildings6 building records
  • Documents filed118 files

Current status

24%238 of 985 units booked
16.8%Work done, per cost certificate

Figures as on 13 Sep 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A1, A2, A3NA17161800180
B1, B2, B3NA18161920192
C1, C2, C3NA21192280228
D1, D2, D3NA18161910191
E1, E2, E3NA18161930193
Club HouseNA43011

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building6

As on 13 Sep 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 66 construction stages are filed complete across 6 buildings. The stage furthest along is Stilt Floor, at 95%.

A1, A2, A325%
ActivityProgress
Excavation100%
Basement (if any)85%
Podiums (if any)0%
Plinth80%
Stilt Floor0%
Slabs of Super Structure10%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
B1, B2, B30%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
C1, C2, C336%
ActivityProgress
Excavation100%
Basement (if any)90%
Podiums (if any)0%
Plinth85%
Stilt Floor95%
Slabs of Super Structure15%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks15%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
D1, D2, D39%
ActivityProgress
Excavation95%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
E1, E2, E39%
ActivityProgress
Excavation95%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Club House0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 13 Sep 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed1053

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1,053
Closed/Covered997
Open Space56
BuildingClosed/CoveredOpen SpaceTotal
A1, A2, A319210202
B1, B2, B319210202
C1, C2, C322811239
D1, D2, D319210202
E1, E2, E319210202
Club House156

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area18,721 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityNASHIK MUNICIPAL CORPORATION
Permissible FSI69337.38
Proposed, not sanctioned69,336 sq m
Buildings approved6
Buildings sanctioned6

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBABUBHAI HOUSE, NEAR KULKARNI GARDEN, SHARANPUR ROAD NASHIK
Estimated costRs 122.00 cr
Cost incurredRs 20.54 cr
Work done16.84%
BuildingWingEstimatedIncurred
C1, C2, C3NARs 26.44 crRs 13.22 cr
E1, E2, E3NARs 25.51 cr-
A1, A2, A3NARs 25.50 crRs 5.10 cr
B1, B2, B3NARs 22.29 cr-
D1, D2, D3NARs 22.27 crRs 2.23 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVIJAYKUMAR SANAP
EngineerVIJAY K SANAP
Chartered AccountantSUDARSHAN VITTHAL KALUNGE
Chartered AccountantSANKET K JAIN
PartnerRole in project
VELOCITY INFRA PROJECTS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

P51600052232/WarDec 2027 → Apr 2028

Reason as filed by the promoterNA

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 26 Jun 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 1 Jun 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 1 Jun 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 1 Jun 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Apr 2028

Documents filed118

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 118 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Withdrawal Application Form1_Signed.pdf13 Sep 2026
Withdrawal Update Form 2File: Withdrawal Application Form2_Signed.pdf13 Sep 2026
Withdrawal Update Form 3File: Withdrawal Application Form3.pdf13 Sep 2026
Withdrawal Update Form 1File: Withdrawal Application Form1 LIFE 360.pdf10 Jun 2026
Withdrawal Update Form 2File: Withdrawal Application Form2 LIFE 360.pdf10 Jun 2026
Withdrawal Update Form 3File: Form 3 Q4 FY 25-26_Compressed.pdf10 Jun 2026
Withdrawal Update Form 1File: Signed_Withdrawal Application Form1 Q1 25-26.pdf21 Mar 2026
Withdrawal Update Form 1File: Signed_Withdrawal Application Form1 Q-2 25-26.pdf21 Mar 2026
Withdrawal Update Form 1File: Signed_Withdrawal Application Form1 Q-2 25-26.pdf21 Mar 2026
Withdrawal Update Form 1File: Signed_Withdrawal Application Form1 Q-3 25-26.pdf21 Mar 2026
Withdrawal Update Form 2File: Signed_Withdrawal Application Form2 Q1 25-26.pdf21 Mar 2026
Withdrawal Update Form 2File: Signed_Withdrawal Application Form2 Q-2 25-26.pdf21 Mar 2026
Withdrawal Update Form 2File: Signed_Withdrawal Application Form2 Q-2 25-26.pdf21 Mar 2026
Withdrawal Update Form 2File: Signed_Withdrawal Application Form 2 Q-3 25-26.pdf21 Mar 2026
Withdrawal Update Form 3File: Final_ Q1_25-26_P.pdf21 Mar 2026
Withdrawal Update Form 3File: Signed_Withdrawal Application Form2 Q-2 25-26.pdf21 Mar 2026
Withdrawal Update Form 3File: Form 3 Final_ Q2_25-26_P.pdf21 Mar 2026
Withdrawal Update Form 3File: Final_ Q3_25-26_P.pdf21 Mar 2026
Form 2File: Q1_24-_25_FORM_2.pdf7 Mar 2026
Form 1File: Q1_24-25_FORM_1.pdf7 Mar 2026
Form 3File: FORM3_1st_Q_FY24_25 Final.pdf7 Mar 2026
Disclosure of Sold and Booked InventoryFile: April_june_24-25.pdf7 Mar 2026
Form 1File: Architect_Form1_Q2_24-25.pdf7 Mar 2026
Form 2File: Engineer_Form 2_Q2_24-25.pdf7 Mar 2026
Form 3File: FORM3_2nd_Q_FY24-25_ Final.pdf7 Mar 2026
Disclosure of Sold and Booked InventoryFile: July_sep_24-25.pdf7 Mar 2026
Form 1File: Form 01 Q3 24-25.pdf7 Mar 2026
Form 2File: Form 02 Q3 24-25.pdf7 Mar 2026
Form 3File: Q3_24-25_Signed_F.pdf7 Mar 2026
Disclosure of Sold and Booked InventoryFile: Oct_Dec_2024-25.pdf7 Mar 2026
Form 1File: Form 1 Life 360 March 25.pdf7 Mar 2026
Form 2File: Form 2 Life 360 March 25.pdf7 Mar 2026
Form 3File: Q4_24-25_Signed_F.pdf7 Mar 2026
Disclosure of Sold and Booked InventoryFile: Q4_24-25_Sold_Unsold.pdf7 Mar 2026
Form 1File: 1 Architects Certificate of Percentage of Completion of Work (Form 1).pdf7 Mar 2026
Form 2File: 1 Engineers Certificate on Cost Incurred on Project (Form 2).pdf7 Mar 2026
Form 3File: 1_FORM3_2nd_Q_FY23-24__Final.pdf7 Mar 2026
Disclosure of Sold and Booked InventoryFile: 1 Disclosure of sold_ booked inventory.pdf7 Mar 2026
Form 1File: FORM1.pdf7 Mar 2026
Form 2File: FORM2.pdf7 Mar 2026
Form 3File: 2_FORM3_3rd_Q_FY23_24_Final.pdf7 Mar 2026
Disclosure of Sold and Booked InventoryFile: 2 Disclosure of sold_ booked inventory.pdf7 Mar 2026
Form 1File: FORM1.pdf7 Mar 2026
Form 2File: FORM2.pdf7 Mar 2026
Form 3File: 3_FORM3_4th_Q_FY23_24 Final.pdf7 Mar 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of sold_booked inventory.pdf7 Mar 2026
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM3_2nd_Q_FY23-24__Final.pdf22 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM3_3rd_Q_FY23_24_Final.pdf22 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM3_4th_Q_FY23_24 Final.pdf22 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM3_1st_Q_FY24_25 Final.pdf22 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM3_2nd_Q_FY24-25_ Final.pdf22 Jan 2025
Disclosure of sold/ booked inventoryFile: Inventory Update as on 30-09-24.pdf22 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Sept 24.pdf20 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Sept 24.pdf20 Oct 2024
Disclosure of sold/ booked inventoryFile: Sold Inventory June 24.pdf26 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 01 30 June 24.pdf19 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 02 30 June 24.pdf19 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 31 Mar 24.pdf26 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 31 Mar 24.pdf26 Apr 2024
Disclosure of sold/ booked inventoryFile: Inventory Update as on 31-03-2024.pdf26 Apr 2024
Disclosure of sold/ booked inventoryFile: Inventory Update as on 31-12-23.pdf7 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Velocity dec 23.pdf6 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Velocity dec 23.pdf6 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 30 Sept 23.pdf14 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 30 Sept 23.pdf14 Dec 2023
Disclosure of sold/ booked inventoryFile: Inventory Update as on 30-09-23.pdf14 Dec 2023
Details of encumbrances concerned to FinanceFile: NON ENCUMBRANCE.pdf21 Jul 2023
Details of encumbrances concerned to LegalFile: NON ENCUMBRANCE.pdf21 Jul 2023
Copy of the legal title reportFile: Partnership Deed_Velocity Infra Project.pdf26 Jun 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Report pdf.pdf9 Jun 2023
Proforma of Agreement for saleFile: Agreement to Sale.pdf2 Jun 2023
Layout approvalFile: 1 (1).pdf1 Jun 2023
Building plan approvalFile: 1 (2).pdf1 Jun 2023
Building plan approvalFile: 1 (3).pdf1 Jun 2023
Building plan approvalFile: 1 (4).pdf1 Jun 2023
Building plan approvalFile: 1 (5).pdf1 Jun 2023
Building plan approvalFile: 1 (6).pdf1 Jun 2023
Building plan approvalFile: 1 (7).pdf1 Jun 2023
Building plan approvalFile: 1 (8).pdf1 Jun 2023
Building plan approvalFile: 1 (9).pdf1 Jun 2023

How this compares with Nashik

24%of this project is bookeddistrict median 17%
10%of Nashik projects moved their completion datethis one moved by 4 months
19%of Nashik registrations have lapsed or been cancelledthis one is on the register

Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.

Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep LIFE 360 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near PATHARDI SHIWAR4,100+ in Nashik

2 kmLIFE 360Completed 154Lapsed / revoked 39Other 93Dot size: filed unitsN

Filed coordinates, straight-line distance. 286 registered projects within 2 km.

Builder: VELOCITY INFRA PROJECTS

VELOCITY INFRA PROJECTS has 1 registration on MahaRERA, including LIFE 360. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nashik district page.

Frequently asked questions

What are my rights if LIFE 360 is delayed beyond 30 Apr 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of LIFE 360?

The registered promoter entity is VELOCITY INFRA PROJECTS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in LIFE 360?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for LIFE 360?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at LIFE 360?

The professionals named in the filing: Architect: VIJAYKUMAR SANAP; Engineer: VIJAY K SANAP; Chartered Accountant: SUDARSHAN VITTHAL KALUNGE; Chartered Accountant: SANKET K JAIN. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in LIFE 360?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About LIFE 360. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save LIFE 360 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.