ELYSIAN
RG-MH-84795 · RERA P51600054678 · Last updated on MahaRERA portal: 1 Jun 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Rs 125.00 crore secured on the land, in favour of Bajaj Housing Finance Ltd
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- All 9 earlier projects delivered on promise
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
ELYSIAN is a Others project by ROONGTA HOMES LLP in Nashik, Maharashtra, registered with MahaRERA as P51600054678 on 2 Feb 2024. Possession is promised by 31 Mar 2032. 72 of the 313 units on this registration are recorded sold or booked, and 15 of 55 construction stages are filed complete.
At a glance
Project
- NameELYSIAN
- TypeOthers
- Location
- Gangapur Road
- Nirmala Convent Road
- Nashik
- 422013
- Pincode422013
- RERA no.P51600054678
- ReraGenie IDRG-MH-84795
Builder
- NameROONGTA HOMES LLP
- Entity typePartnership
- GSTIN27AAUFR4502Q2ZE
- GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
- PartnersAKHIL LALIT ROONGTA, LALIT SATYANARAYAN ROONGTA, NIKHIL LALIT ROONGTA
- Other registrations25 more →
- Completed25 of 26
- Declared earlier projects9 →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on2 Feb 2024
- Promised completion31 Mar 2032
- Revised completionNone
- Buildings5 building records
- Documents filed107 files
Current status
Figures as on 1 Jun 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| ELYSIAN WING-E | NA | 38 | 34 | 64 | 5 | 69 |
| ELYSIAN WING-A | NA | 33 | 28 | 54 | 4 | 58 |
| ELYSIAN WING-B | NA | 33 | 28 | 54 | 10 | 64 |
| ELYSIAN WING-C | NA | 33 | 28 | 54 | 3 | 57 |
| ELYSIAN WING-D | NA | 38 | 33 | 64 | 1 | 65 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building5
As on 1 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
15 of 55 construction stages are filed complete across 5 buildings. The stage furthest along is Excavation, at 75%.
ELYSIAN WING-E7%
| Activity | Progress |
|---|---|
| Excavation | 75% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
ELYSIAN WING-A41%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 21% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 25% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
ELYSIAN WING-B41%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 21% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 25% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
ELYSIAN WING-C41%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 22% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 25% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
ELYSIAN WING-D28%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 5% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 1 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed816
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| ELYSIAN WING-E | 192 | 192 |
| ELYSIAN WING-A | 189 | 189 |
| ELYSIAN WING-B | 189 | 189 |
| ELYSIAN WING-C | 54 | 54 |
| ELYSIAN WING-D | 192 | 192 |
Land and ownership
A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| ELYSIAN WING-A | NA | Rs 52.55 cr | Rs 10.83 cr |
| ELYSIAN WING-B | NA | Rs 52.46 cr | Rs 10.82 cr |
| ELYSIAN WING-E | NA | Rs 46.41 cr | Rs 1.50 cr |
| ELYSIAN WING-D | NA | Rs 45.79 cr | Rs 1.38 cr |
| ELYSIAN WING-C | NA | Rs 18.36 cr | Rs 4.11 cr |
| - | NA | Rs 18.00 cr | - |
Certifying professionals and partners8
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | PANKAJ JADHAV |
| Architect | SPECTRUM DESIGN GROUP |
| Engineer | AMOL YADAVRAO BHALERAO |
| Engineer | MAHIMTURA CONSULTANTS PRIVATE LTD |
| Engineer | Mayuresh Kishor Kale |
| Chartered Accountant | Pranav S. Lahoti & Co. Chartered Accountants |
| Chartered Accountant | M/s. Pravin R.Rathi & Associates, Chartered Accountants |
| Chartered Accountant | PRAVIN R RATHI & ASSOCIATES FRN 131494W |
| Partner | Role in project |
|---|---|
| ROONGTA HOMES LLP | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 20 Jan 2024 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 20 Jan 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 30 Jan 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 29 Jan 2025Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Mar 2032
Documents filed107
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 107 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: FORM 1 01042026.pdf | 1 Jun 2026 |
| Withdrawal Update Form 2File: 3 form 2 elysian FY 25-26.pdf | 1 Jun 2026 |
| Withdrawal Update Form 3File: Form 3 Elysian Q4.pdf | 1 Jun 2026 |
| Form 2A (FY 2025-2026)File: FORM 2A ELYSIAN 25-26.pdf | 27 May 2026 |
| Withdrawal Update Form 1File: FORM 1-ELYSIAN-01012026.pdf | 2 Mar 2026 |
| Withdrawal Update Form 2File: Form 2 Elysian Q3.pdf | 2 Mar 2026 |
| Withdrawal Update Form 3File: Form 3 Elysian Q3.pdf | 2 Mar 2026 |
| Withdrawal Update Form 1File: FORM 1-ELYSIAN-01102025.pdf | 25 Dec 2025 |
| Withdrawal Update Form 2File: FORM 2-ELYSIAN-01102025.pdf | 25 Dec 2025 |
| Withdrawal Update Form 3File: FORM 3 ELYSIAN Q2.pdf | 25 Dec 2025 |
| Form 5 (FY 2024-2025)File: FORM 5 ELYSIAN.pdf | 22 Nov 2025 |
| Form 1File: FORM1-ELYSIAN-01042025.pdf | 25 Jun 2025 |
| Form 2File: FORM 2-ELYSIAN-01042025.pdf | 25 Jun 2025 |
| Form 3File: FORM 3-ELYSIAN_01042025.pdf | 25 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD-ELYSIAN-FY24-25.pdf | 25 Jun 2025 |
| Self-declaration of Quarterly ProgressFile: SELF DECLARATION ON ENCUMBRANCE FINANCE.pdf | 25 Jun 2025 |
| OthersFile: Asset Based Search ERROR.pdf | 25 Jun 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM1-ELYSIAN-01042025.pdf | 2 May 2025 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD-ELYSIAN-FY24-25.pdf | 24 Apr 2025 |
| Other - TechnicalFile: FORM 2A_ELYSIAN_FY 24-25.pdf | 12 Apr 2025 |
| Details of encumbrances concerned to FinanceFile: INDEX 2.pdf | 1 Apr 2025 |
| Details of encumbrances concerned to FinanceFile: SELF DECLARATION ON ENCUMBRANCE FINANCE.pdf | 1 Apr 2025 |
| Details of encumbrances concerned to LegalFile: INDEX 2.pdf | 1 Apr 2025 |
| Details of encumbrances concerned to LegalFile: SELF DECLARATION ON ENCUMBRANCE FINANCE.pdf | 1 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate-Elysian qtr3 24-25.pdf | 7 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-ELYSIAN-QTR3 24-25.pdf | 6 Feb 2025 |
| Proforma of Agreement for saleFile: AFS RERA.pdf | 4 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Q 3 ELYSIAN_compressed.pdf | 31 Jan 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: REVISED COMMENCEMENT.pdf | 29 Jan 2025 |
| Declaration about Commencement CertificateFile: FORMAT D.pdf | 29 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE-ELYSIAN-QTR1.pdf | 23 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE-ELYSIAN-QTR2.pdf | 23 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ELYSIAN FORM 3.pdf | 18 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 ELYSIAN Q2_.pdf | 18 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold-Elysian-Q3.pdf | 18 Jan 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: ELYSIAN FORM 3.pdf | 18 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-ELYSIAN-Q2.pdf | 18 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-ELYSIAN-Q2.pdf | 18 Nov 2024 |
| Declaration about Commencement CertificateFile: FORMAT D REVISED.pdf | 7 Nov 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: CC.pdf | 6 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold_Elysian_Q2 24-25.pdf | 21 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5_Elysian_FY 23-24.pdf | 16 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Elysian Q1.pdf | 22 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: ELYSIAN_SOLD UNSOLD INVENTORY_Q1.pdf | 6 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ELYSIAN FORM 2 Q4.pdf | 6 May 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A_Elysian_FY 23-24.pdf | 1 May 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold_Elysian_Q4.pdf | 1 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 ELYSIAN Q4.pdf | 1 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ELYSIAN FORM 1.pdf | 29 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ELYSIAN_FORM-1_Q4.pdf | 29 Apr 2024 |
| CERSAI detailsFile: CERSAI_ELYSIAN.pdf | 27 Apr 2024 |
| Other - TechnicalFile: Form 2A_Elysian_FY 23-24.pdf | 22 Apr 2024 |
| Building plan approvalFile: C WING PLAN.pdf | 30 Jan 2024 |
| Building plan approvalFile: D AND E WING 1.pdf | 30 Jan 2024 |
| Building plan approvalFile: D AND E WING 2.pdf | 30 Jan 2024 |
| Building plan approvalFile: LAYOUT.pdf | 30 Jan 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: C WING PLAN.pdf | 30 Jan 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: D AND E WING 1.pdf | 30 Jan 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: D AND E WING 2.pdf | 30 Jan 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: LAYOUT.pdf | 30 Jan 2024 |
| Building plan approvalFile: 123-1.pdf | 29 Jan 2024 |
| Building plan approvalFile: 123-2.pdf | 29 Jan 2024 |
| Building plan approvalFile: 123-3.pdf | 29 Jan 2024 |
| Building plan approvalFile: 123-4.pdf | 29 Jan 2024 |
| Building plan approvalFile: 123-5.pdf | 29 Jan 2024 |
| Building plan approvalFile: 123-6.pdf | 29 Jan 2024 |
| Building plan approvalFile: 123-7.pdf | 29 Jan 2024 |
| Building plan approvalFile: 123-8.pdf | 29 Jan 2024 |
| Building plan approvalFile: 123-12.pdf | 29 Jan 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 123-1.pdf | 29 Jan 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 123-2.pdf | 29 Jan 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 123-3.pdf | 29 Jan 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 123-4.pdf | 29 Jan 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 123-5.pdf | 29 Jan 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 123-6.pdf | 29 Jan 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 123-7.pdf | 29 Jan 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 123-8.pdf | 29 Jan 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 123-12.pdf | 29 Jan 2024 |
| Layout approvalFile: LAYOUT.pdf | 20 Jan 2024 |
| Building plan approvalFile: APPROVED BP-1-2_compressed.pdf | 20 Jan 2024 |
Promoter's earlier projects9
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| SHREE TIRUMALA GULMOHAR APARTMENT | Division Makhmalabad Shiwar NASHIK Taluka NASHIK Dist NASHIK | 156 | Completed | Apr 2022 | Aug 2020 |
| SHREE TIRUMALA PARAMOUNT APARTMENT | Taluka NASHIK Dist NASHIK-422009 | 173 | Completed | Jun 2021 | Feb 2020 |
| SHREE TIRUMALA REGENCY APARTMENT | Deepali Nagar NASHIK Taluka NASHIK Dist NASHIK 422009 | 50 | Completed | Dec 2020 | May 2020 |
| ROONGTA IMPERIA APARTMENT | NASHIK 422001 | 112 | Completed | Jul 2020 | Mar 2019 |
| ROONGTA HORIZON APARTMENT | NASHIK 422001 | 112 | Completed | Jul 2020 | Mar 2019 |
| SHREE TIRUMALA PLATINUM APARTMENT | COLLEGE ROAD NASHIK 422005 | 10 | Completed | May 2020 | Dec 2018 |
| SHREE TIRUMALA PARADISE APARTMENT | CHETANA NAGAR NASHIK 422009 | 28 | Completed | Sep 2019 | Nov 2018 |
| SHREE TIRUMALA HARINIWAS APARTMENT | SR.NO.78 PLOT NO.83 SATPUR NASHIK | 42 | Completed | Mar 2019 | May 2018 |
| SHREE TIRUMALA SWASTIK APARTMENT | INDIRA NAGAR NASHIK | 28 | Completed | Dec 2018 | Jun 2018 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nashik
Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.
Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 25 other registrations, which the RERA portal never shows together
- All 107 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep ELYSIAN on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Nirmala Convent Road4,100+ in Nashik
Samraat AmOzon
M/S Shweta Infrastructure & Housing (I) Pv
HAPPY LIFE AT APNA GHAR PHASE III
M/S Shweta Infrastructure & Housing (I) Pv
SKY53
SKY53
ROONGTA ROSEWOOD APARTMENT
SHREE TIRUMALA BUILDCON
ROONGTA EMINENCE APARTMENT
SHREE TIRUMALA BUILDCON
SAISHRUSHTI
JAY DEVELOPERS
See every Nashik project, with the district possession charts
Builder: ROONGTA HOMES LLP
ROONGTA HOMES LLP has 26 registrations on MahaRERA, including SHREE TIRUMALA SWASTIK APARTMENT and SHREE TIRUMALA PARADISE APARTMENT. Its filings disclose 9 earlier MahaRERA projects: declares 9 of 9 past projects completed on time. Read the full track record. See more projects on the Nashik district page.
Frequently asked questions
What are my rights if ELYSIAN is delayed beyond 31 Mar 2032?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of ELYSIAN?
The registered promoter entity is ROONGTA HOMES LLP, a partnership as per the filing. Its GSTIN 27AAUFR4502Q2ZE can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in ELYSIAN?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for ELYSIAN?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at ELYSIAN?
The professionals named in the filing: Architect: PANKAJ JADHAV; Architect: SPECTRUM DESIGN GROUP; Engineer: AMOL YADAVRAO BHALERAO; Engineer: MAHIMTURA CONSULTANTS PRIVATE LTD; Engineer: Mayuresh Kishor Kale; Chartered Accountant: Pranav S. Lahoti & Co. Chartered Accountants. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in ELYSIAN?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback