ReraGenieLog inGet a buyer report

Home / Browse projects / Nashik, Maharashtra / SHREE SATYANARAYAN ROONGTA FORUM

Completed No litigation declared Commercial project

SHREE SATYANARAYAN ROONGTA FORUM

By ROONGTA HOMES LLP

RG-MH-13695 · RERA P51600027351 · Last updated on MahaRERA portal: 9 Aug 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 9 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 25 other registrations.

See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.
Sep 2025Possession promisedregistration recorded completed
3 of 11Construction stages donefurthest along: Slabs of Super Structure, 94%
178 of 1,009Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 95 documents Report an error

SHREE SATYANARAYAN ROONGTA FORUM is a Commercial project by ROONGTA HOMES LLP in Nashik, Maharashtra, registered with MahaRERA as P51600027351 on 4 Dec 2020. The registration is recorded completed; possession was promised by 30 Sep 2025. 831 of the 1,009 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.

At a glance

Project

  • NameSHREE SATYANARAYAN ROONGTA FORUM
  • TypeCommercial
  • Location
    • NEAR CITY CENTRE
    • NASHIK SHIWAR
    • NASHIK
    • NASHIK
    • 422010
  • Pincode422010
  • RERA no.P51600027351
  • ReraGenie IDRG-MH-13695

Builder

  • NameROONGTA HOMES LLP
  • Entity typePartnership
  • GSTIN27AAUFR4502Q2ZE
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnersAKHIL LALIT ROONGTA, LALIT SATYANARAYAN ROONGTA, NIKHIL LALIT ROONGTA
  • Other registrations25 more →
  • Completed25 of 26
  • Declared earlier projects9 →

Key dates

this monthRegisteredDec 2020PromisedSep 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on4 Dec 2020
  • Promised completion30 Sep 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed95 files

Current status

82%831 of 1,009 units booked

Figures as on 9 Aug 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SATYANARAYAN ROONGTA FORUMNA1210010091009

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 9 Aug 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 94%.

SATYANARAYAN ROONGTA FORUM: 52% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure94%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises79%
Sanitary Fittings within the flats / premises48%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.34%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.18%

Progress on shared amenities15

As on 9 Aug 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed252

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots252
Closed/Covered252

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area5,573 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityNASHIK MUNICIPAL CORPORATION
Permissible FSI19775.56
Proposed, not sanctioned19,776 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchINDIRA NAGAR ,NASHIK

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectM/S KABRE CONSULTANTS
ArchitectSagar Kabre
EngineerAMOL YADAVRAO BHALERAO
EngineerMR SANJEEV MADHUSUDAN PATEL
Chartered AccountantAnand Rathi & Associates Chartered Accountants
Chartered AccountantM/s. Pravin R.Rathi & Associates, Chartered Accountants
Chartered AccountantPranav S. Lahoti & Co. Chartered Accountants
PartnerRole in project
ROONGTA HOMES LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 2 Dec 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 2 Dec 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 14 Apr 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 7 Feb 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed95

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 95 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupational CertificateFile: SSRF COMPLETION_merged.pdf9 Aug 2025
Form 1File: FORM 1-SSRF 01072025.pdf8 Aug 2025
Form 2File: FORM 2-SSRF-01072025.pdf8 Aug 2025
Form 3File: FORM 3-SSRF-01072025-compressed.pdf8 Aug 2025
Disclosure of Sold and Booked InventoryFile: SSRF-SOLD UNSOLD -01072025-compressed.pdf8 Aug 2025
Form 1File: FORM 1-SSRF-01042025.pdf25 Jun 2025
Form 2File: FORM 2-SSRF-01042025.pdf25 Jun 2025
Form 3File: FORM 3-SSRF-01042025_compressed_compressed (1)_compressed.pdf25 Jun 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD-SSRF-01042025_compressed (1).pdf25 Jun 2025
Self-declaration of Quarterly ProgressFile: SSRF CERSAI MAR 25.pdf25 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-SSRF-01042025.pdf30 Apr 2025
Building plan approvalFile: PLAN_-1-5.pdf14 Apr 2025
Building plan approvalFile: PLAN_-6-11-1-3.pdf14 Apr 2025
Building plan approvalFile: PLAN_-6-11-4-6.pdf14 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_compressed.pdf14 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: PLAN_-1-5.pdf14 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: PLAN_-6-11-1-3.pdf14 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: PLAN_-6-11-4-6.pdf14 Apr 2025
Disclosure of sold/ booked inventoryFile: SOLD.pdf14 Apr 2025
OtherFile: FORM 2A_SSRF_FY 24-25.pdf12 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A_SSRF_FY 24-25.pdf12 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certi_SSRF 01012025.pdf4 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2_SSRF_01012025.pdf4 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 SSRF Q3 - converted.pdf18 Feb 2025
Commencement Certificates / NA Order for plotted developmentFile: REV COMMENCMENT.pdf7 Feb 2025
Declaration about Commencement CertificateFile: FORMAT D REVISED SSRF.pdf7 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 14 Engineer Certificate_SSRF_010724.pdf6 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 15 Engineer Certificate-SSRF-QTR 3 24-25.pdf6 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SSRF FORM 3 JUNE 2024.pdf23 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SSRF-FORM 3_QTR 2_compressed_compressed (1)_compressed.pdf23 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold-SSRF-Q3_.pdf18 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 SSRF.pdf23 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-SSRF-Q2.pdf18 Nov 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold_SSRF_Q2 24-25.pdf21 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_SSRF.pdf26 Jul 2024
Disclosure of sold/ booked inventoryFile: SSRF_SOLD UNSOLD INVENTORY_Q1.pdf6 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A SSRF MARCH 24.pdf8 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: SSRF MARCH 23.pdf8 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 13 SSRF FORM 2 Q4.pdf6 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SSRF FORM 3 Q4_compressed - converted.pdf2 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 13 FORM 1 SSRF Q4.pdf1 May 2024
CERSAI detailsFile: CERSAI_FY 23-24.pdf1 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CERSAI_SSRF.pdf27 Apr 2024
Disclosure of sold/ booked inventoryFile: SSRF Q4.pdf20 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 12 SSRF_Form-2 Q3.pdf3 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 12 SSRF Q3 01012024.pdf24 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Q3.pdf21 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SSRF FORM 2 Q1.pdf13 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SSRF FORM 2 Q2.pdf13 Jan 2024
Disclosure of sold/ booked inventoryFile: SSRF Q3.pdf4 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SSRF 01072023.pdf3 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SSRF 04102023.pdf3 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Q1.pdf3 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Q2.pdf3 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SSRF.pdf27 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 SSRF (1).pdf5 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 SSRF FY 22-23.pdf5 Nov 2023
Disclosure of sold/ booked inventoryFile: SSRF.pdf19 Oct 2023
Disclosure of sold/ booked inventoryFile: SSRF 30062023.pdf26 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SSRF FORM 1.pdf15 May 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 2ASSRF.pdf21 Apr 2023
CERSAI detailsFile: CERSAI_SSRF.pdf21 Apr 2023
Disclosure of sold/ booked inventoryFile: SSRF SOLD 31032023.pdf21 Apr 2023
OtherFile: SSRF.pdf21 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 230325175002_0001.pdf25 Mar 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SSRF Q3.pdf25 Mar 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 20230214135645.pdf17 Mar 2023
Disclosure of sold/ booked inventoryFile: SSRF SOLD 31122023.pdf16 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: SSRF.pdf7 Nov 2022
Disclosure of sold/ booked inventoryFile: SSRF-SEP22.pdf17 Oct 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SSRF FORM -3 Q-1.pdf9 Aug 2022
Disclosure of sold/ booked inventoryFile: SSRF - UNIT SOLD.pdf7 Jul 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SSRF-FORM-3.pdf18 May 2022
Disclosure of sold/ booked inventoryFile: SOLD INVENTORY - SSRF.pdf7 Apr 2022
OtherFile: FORM-2A- SSRF.pdf7 Apr 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: SRF FY 20-21.pdf21 Feb 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SRF.pdf8 Jan 2022
Disclosure of sold/ booked inventoryFile: SRFORUM31122021.pdf5 Jan 2022
Disclosure of sold/ booked inventoryFile: SSRF.pdf7 Oct 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Satyanarayan.pdf7 Oct 2021

Promoter's earlier projects9

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

9 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
SHREE TIRUMALA GULMOHAR APARTMENTDivision Makhmalabad Shiwar NASHIK Taluka NASHIK Dist NASHIK156CompletedApr 2022Aug 2020
SHREE TIRUMALA PARAMOUNT APARTMENTTaluka NASHIK Dist NASHIK-422009173CompletedJun 2021Feb 2020
SHREE TIRUMALA REGENCY APARTMENTDeepali Nagar NASHIK Taluka NASHIK Dist NASHIK 42200950CompletedDec 2020May 2020
ROONGTA IMPERIA APARTMENTNASHIK 422001112CompletedJul 2020Mar 2019
ROONGTA HORIZON APARTMENTNASHIK 422001112CompletedJul 2020Mar 2019
SHREE TIRUMALA PLATINUM APARTMENTCOLLEGE ROAD NASHIK 42200510CompletedMay 2020Dec 2018
SHREE TIRUMALA PARADISE APARTMENTCHETANA NAGAR NASHIK 42200928CompletedSep 2019Nov 2018
SHREE TIRUMALA HARINIWAS APARTMENTSR.NO.78 PLOT NO.83 SATPUR NASHIK42CompletedMar 2019May 2018
SHREE TIRUMALA SWASTIK APARTMENTINDIRA NAGAR NASHIK28CompletedDec 2018Jun 2018

How this compares with Nashik

82%of this project is bookeddistrict median 17%
10%of Nashik projects moved their completion datethis one has not
19%of Nashik registrations have lapsed or been cancelledthis one is completed

Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.

Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SHREE SATYANARAYAN ROONGTA FORUM on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NASHIK4,100+ in Nashik

Builder: ROONGTA HOMES LLP

ROONGTA HOMES LLP has 26 registrations on MahaRERA, including SHREE TIRUMALA SWASTIK APARTMENT and SHREE TIRUMALA PARADISE APARTMENT. Its filings disclose 9 earlier MahaRERA projects: declares 9 of 9 past projects completed on time. Read the full track record. See more projects on the Nashik district page.

Frequently asked questions

What are my rights if SHREE SATYANARAYAN ROONGTA FORUM is delayed beyond 30 Sep 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHREE SATYANARAYAN ROONGTA FORUM?

The registered promoter entity is ROONGTA HOMES LLP, a partnership as per the filing. Its GSTIN 27AAUFR4502Q2ZE can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHREE SATYANARAYAN ROONGTA FORUM?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SHREE SATYANARAYAN ROONGTA FORUM?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHREE SATYANARAYAN ROONGTA FORUM?

The professionals named in the filing: Architect: M/S KABRE CONSULTANTS; Architect: Sagar Kabre; Engineer: AMOL YADAVRAO BHALERAO; Engineer: MR SANJEEV MADHUSUDAN PATEL; Chartered Accountant: Anand Rathi & Associates Chartered Accountants; Chartered Accountant: M/s. Pravin R.Rathi & Associates, Chartered Accountants. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHREE SATYANARAYAN ROONGTA FORUM?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHREE SATYANARAYAN ROONGTA FORUM. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHREE SATYANARAYAN ROONGTA FORUM to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.