ReraGenieLog inGet a buyer report

Home / Browse projects / Nashik, Maharashtra / Laxminarayan Heaven

Registered No litigation declared Others project

Laxminarayan Heaven

By Sahajanand Builders And Developers

RG-MH-53229 · RERA P51600054919 · Last updated on MahaRERA portal: 18 Jul 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • All 4 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 3 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedno revision filed
22 of 44Construction stages doneacross 4 buildings; furthest along: Slabs of Super Structure, 87%
138 of 246Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 82 documents Report an error

Laxminarayan Heaven is a Others project by Sahajanand Builders And Developers in Nashik, Maharashtra, registered with MahaRERA as P51600054919 on 21 Feb 2024. Possession is promised by 31 Dec 2028. 108 of the 246 units on this registration are recorded sold or booked, and 22 of 44 construction stages are filed complete.

At a glance

Project

  • NameLaxminarayan Heaven
  • TypeOthers
  • Location
    • Pathardi Gaulane Road
    • Warkarai Chowk
    • Opposite SSK World Club
    • Pathardi
    • Nashik
    • 422010
  • Pincode422010
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51600054919
  • ReraGenie IDRG-MH-53229

Builder

  • NameSahajanand Builders And Developers
  • Entity typePartnership
  • PartnersVipul Ravjibhai Navapariya, Bhavika Vipulbhai Navapariya
  • Other registrations3 more →
  • Completed3 of 4
  • Declared earlier projects4 →

Key dates

this monthRegisteredFeb 2024PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on21 Feb 2024
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings4 building records
  • Documents filed82 files

Current status

44%108 of 246 units booked
63.1%Work done, per cost certificate

Figures as on 18 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building 1 - Wing ANA8828432
Building 2 - Wings B, C and DNA8784084
Building 3 - Wing ENA8828432
Building 4 - Wings F, G and HNA8798098

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 18 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

22 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Slabs of Super Structure, at 87%.

Building 1 - Wing A91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Building 2 - Wings B, C and D91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Building 3 - Wing E0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building 4 - Wings F, G and H38%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor50%
Slabs of Super Structure87%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises18%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks66%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 18 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes50%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes50%

Parking filed374

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots374
Closed/Covered232
Open Space142
BuildingClosed/CoveredOpen SpaceTotal
Building 1 - Wing A271744
Building 2 - Wings B, C and D8250132
Building 3 - Wing E271744
Building 4 - Wings F, G and H9658154

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,600 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityNashik Municipal Corporation
Permissible FSI14068.7
Proposed, not sanctioned13,569 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchRaj Arcade, Opp Hotel Excellency Inn, Ambad Link Road, Nashik
Estimated costRs 23.30 cr
Cost incurredRs 14.70 cr
Work done63.08%
BuildingWingEstimatedIncurred
Building 4 - Wings F, G and HNARs 8.60 crRs 3.70 cr
Building 2 - Wings B, C and DNARs 7.30 crRs 7.30 cr
Building 1 - Wing ANARs 3.35 crRs 3.35 cr
Building 3 - Wing ENARs 3.35 cr-
-NARs 70.00 lakhRs 35.00 lakh

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPankaj Prabhakar Jadhav
EngineerSagar Shah
Chartered AccountantNirav Shailesh Shah & Co.
Chartered AccountantSaril Shah & Associates
PartnerRole in project
Sahajanand Builders And Developers-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 18 Jan 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 18 Jan 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 5 Feb 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 18 Jan 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed82

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 82 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 26-27 Q1.pdf18 Jul 2026
Withdrawal Update Form 2File: Form 2 26-27 Q1.pdf18 Jul 2026
Withdrawal Update Form 3File: Form 3 SD 26-27 Q1.pdf18 Jul 2026
Withdrawal Update Form 1File: Form 1 25-26 Q2.pdf15 Jul 2026
Withdrawal Update Form 1File: Form 1 25-26 Q3.pdf15 Jul 2026
Withdrawal Update Form 1File: Form 1 25-26 Q4.pdf15 Jul 2026
Withdrawal Update Form 2File: Form 2 25-26 Q2.pdf15 Jul 2026
Withdrawal Update Form 2File: Form 2 25-26 Q3.pdf15 Jul 2026
Withdrawal Update Form 2File: Form 2 25-26 Q4.pdf15 Jul 2026
Withdrawal Update Form 3File: Form 3 SD 25-26 Q2.pdf15 Jul 2026
Withdrawal Update Form 3File: Form 3 SD 25-26 Q3.pdf15 Jul 2026
Withdrawal Update Form 3File: Form 3 25-26 Q4.pdf15 Jul 2026
Form 1File: Form 1 Q4.pdf30 Sep 2025
Form 2File: Form 2 Q4.pdf30 Sep 2025
Form 3File: Form 3 SD Q4.pdf30 Sep 2025
Disclosure of Sold and Booked InventoryFile: Inventory Q4.pdf30 Sep 2025
Form 1File: Form 1 Q1.pdf30 Sep 2025
Form 2File: Form 2 Q1.pdf30 Sep 2025
Form 3File: Form 3 SD Q1.pdf30 Sep 2025
Disclosure of Sold and Booked InventoryFile: Inventory Q1.pdf30 Sep 2025
Form 1File: Form 1 Q2.pdf30 Sep 2025
Form 2File: Form 2 Q2.pdf30 Sep 2025
Form 3File: Form 3 SD Q2.pdf30 Sep 2025
Disclosure of Sold and Booked InventoryFile: Inventory Q2.pdf30 Sep 2025
Form 1File: Form 1 24-25 Q3.pdf30 Sep 2025
Form 2File: Form 2 24-25 Q3.pdf30 Sep 2025
Form 3File: Form 3 SD 24-25 Q3.pdf30 Sep 2025
Disclosure of Sold and Booked InventoryFile: Inventory 31-12-2024.pdf30 Sep 2025
Form 1File: Form 1 24-25 Q4.pdf30 Sep 2025
Form 2File: Form 2 24-25 Q4.pdf30 Sep 2025
Form 3File: Form 3 SD 24-25 Q4.pdf30 Sep 2025
Disclosure of Sold and Booked InventoryFile: Inventory 31-03-2025.pdf30 Sep 2025
Withdrawal Update Form 1File: Form 1.pdf30 Sep 2025
Withdrawal Update Form 2File: Form 2.pdf30 Sep 2025
Withdrawal Update Form 3File: Form 3.pdf30 Sep 2025
Form 5 (FY 2023-2024)File: Form 5 - 2023-24.pdf30 Sep 2025
Form 5 (FY 2024-2025)File: Form 5 - 2024-25.pdf30 Sep 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q4.pdf30 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q1.pdf30 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q2.pdf30 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 SD Q4.pdf30 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 SD Q1.pdf30 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 SD Q2.pdf30 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q4.pdf30 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q1.pdf30 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q2.pdf30 Dec 2024
Disclosure of sold/ booked inventoryFile: Inventory Q4.pdf30 Dec 2024
Disclosure of sold/ booked inventoryFile: Inventory Q1.pdf30 Dec 2024
Disclosure of sold/ booked inventoryFile: Inventory Q2.pdf30 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - 2023-24.pdf30 Dec 2024
Building plan approvalFile: SP 1.pdf5 Feb 2024
Building plan approvalFile: SP 2.pdf5 Feb 2024
Building plan approvalFile: SP 3.pdf5 Feb 2024
Building plan approvalFile: SP 4.pdf5 Feb 2024
Building plan approvalFile: SP 5.pdf5 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: SP 1.pdf5 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: SP 2.pdf5 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: SP 3.pdf5 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: SP 4.pdf5 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: SP 5.pdf5 Feb 2024
Other - TechnicalFile: Verification of CC.pdf5 Feb 2024
Layout approvalFile: SP 2.pdf18 Jan 2024
PAN CardFile: PAN.pdf18 Jan 2024
Copy of the legal title reportFile: Title Report.pdf18 Jan 2024
Details of encumbrances concerned to FinanceFile: No Encumbrance - Financial.pdf18 Jan 2024
Details of encumbrances concerned to FinanceFile: No Encumbrance - Legal.pdf18 Jan 2024
Details of encumbrances concerned to LegalFile: No Encumbrance - Financial.pdf18 Jan 2024
Details of encumbrances concerned to LegalFile: No Encumbrance - Legal.pdf18 Jan 2024
Copy of Layout Approval (in case of layout)File: SP 2.pdf18 Jan 2024
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf18 Jan 2024
Declaration about Commencement CertificateFile: Declaration About CC.pdf18 Jan 2024
Declaration in FORM BFile: Form B.pdf18 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf18 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf18 Jan 2024
CERSAI detailsFile: Cersai Declaration.pdf18 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf18 Jan 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A.pdf18 Jan 2024
Proforma of Agreement for saleFile: Agreement To Sale.pdf18 Jan 2024
Proforma of Allotment letterFile: Allottment Letter.pdf18 Jan 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Separate Bank Account.pdf18 Jan 2024

Promoter's earlier projects4

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

4 delivered on promise
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Laxminarayan GardenP51600020246Jaibhave Nagar, Nashik-Mar 2019CompletedMar 2025Mar 2020
Laxminarayan HillsP51600031469Behind Hari Vishwa, Khanderao Nagar, Nashik-Oct 2021CompletedDec 2024Mar 2023
LAXMINARAYAN HEIGHTSP51600025559NEAR HARI VISHWA, BEHIND EXPRESS INN, Nashik-Jun 2020CompletedJun 2024Aug 2021
Harekrishna HeightsPathardi Phata Nashik32-CompletedMay 2017May 2017

How this compares with Nashik

44%of this project is bookeddistrict median 17%
10%of Nashik projects moved their completion datethis one has not
19%of Nashik registrations have lapsed or been cancelledthis one is on the register

Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.

Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Laxminarayan Heaven on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Warkarai Chowk, Opposite SSK World Club, Pathardi4,100+ in Nashik

2 kmLaxminarayan HeavenCompleted 81Lapsed / revoked 14Other 54Dot size: filed unitsN

Filed coordinates, straight-line distance. 149 registered projects within 2 km.

Builder: Sahajanand Builders And Developers

Sahajanand Builders And Developers has 4 registrations on MahaRERA, including Laxminarayan Garden and LAXMINARAYAN HEIGHTS. Its filings disclose 4 earlier MahaRERA projects: declares 4 of 4 past projects completed on time. Read the full track record. See more projects on the Nashik district page.

Frequently asked questions

What are my rights if Laxminarayan Heaven is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Laxminarayan Heaven?

The registered promoter entity is Sahajanand Builders And Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Laxminarayan Heaven?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Laxminarayan Heaven?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Laxminarayan Heaven?

The professionals named in the filing: Architect: Pankaj Prabhakar Jadhav; Engineer: Sagar Shah; Chartered Accountant: Nirav Shailesh Shah & Co.; Chartered Accountant: Saril Shah & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Laxminarayan Heaven?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Laxminarayan Heaven. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Laxminarayan Heaven to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.