STAR WORLD

By DEEPAK KALYANJI CHANDE

RG-MH-14059 · RERA P51600030571 · Last updated on MahaRERA portal: 24 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 9 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedno revision filed
3 of 11Construction stages donefurthest along: Internal walls, 55%
147 of 366Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 93 documents Report an error

STAR WORLD is a Commercial project by DEEPAK KALYANJI CHANDE in Nashik, Maharashtra, registered with MahaRERA as P51600030571 on 1 Sep 2021. Possession is promised by 31 Dec 2028. 219 of the 366 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.

At a glance

Project

  • NameSTAR WORLD
  • TypeCommercial
  • Location
    • CITY CENTER MALL ROAD
    • GOVIND NAGAR
    • Nashik (M Corp.)
    • Nashik
    • 422009
  • Pincode422009
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51600030571
  • ReraGenie IDRG-MH-14059

Builder

  • NameDEEPAK KALYANJI CHANDE
  • Entity typeIndividual
  • GSTIN27AAYPC1156H1ZK
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • Other registrations9 more →
  • Completed4 of 10
  • Past their filed date1
  • Declared earlier projects1 →

Key dates

this monthRegisteredSep 2021PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on1 Sep 2021
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed93 files

Current status

60%219 of 366 units booked
73.5%Work done, per cost certificate

Figures as on 24 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
STAR WORLDNA1810366366

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 24 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 55%.

STAR WORLD: 46% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure45%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises55%
Sanitary Fittings within the flats / premises20%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks40%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.30%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.15%

Progress on shared amenities15

As on 24 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes10%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes10%
Storm Water DrainsYes5%
Landscaping & Tree PlantingYes5%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes5%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed50

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots50
Open Space50

Land and ownership6

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area7,240 sq m
Land owned byThe promoter, with other names on the file
Named landowners6
LandownerVillageDistrict
ATIK GULAM MOHAMMAD KOKNINashik (M Corp.)Nashik
GULAM KHWAJA GULAM MOHAMMED KOKNINashik (M Corp.)Nashik
Mohammad Shafi Usman KokniNashikNashik
Nadim Gulam Mohammad KokniNashikNashik
Mohammad Sajid Usman KokniNashikNashik
Mateen Gulam Mohammad KokniNashikNashik

Approvals and building plan

Sanctioning authorityNashik Municipal Corporation
Permissible FSI25268.0
Proposed, not sanctioned23,836 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchInfront of Kalika Mandir, Gadkari Chowk, Nashik
Estimated costRs 52.41 cr
Cost incurredRs 38.52 cr
Work done73.49%
BuildingWingEstimatedIncurred
STAR WORLDNARs 52.41 crRs 38.52 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDHIRAJ WALUNJ
EngineerRELIABLE CONSULTANT
EngineerMukund Govind Bagul
Chartered AccountantCA VISHAL MUSALE
Chartered AccountantCA Bhalchandra Salunke
Chartered AccountantSachin K. Mishra & Co.
PartnerRole in project
DEEPAK KALYANJI CHANDE-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 16 Aug 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 16 Aug 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 9 Jan 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 8 Jan 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed93

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 93 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1_Jun 25.pdf24 Jun 2026
Withdrawal Update Form 1File: Form 1_Sep 25.pdf24 Jun 2026
Withdrawal Update Form 1File: Form 1_Dec 25.pdf24 Jun 2026
Withdrawal Update Form 1File: Form 1_Mar 2026.pdf24 Jun 2026
Withdrawal Update Form 2File: Form 2_Jun 25.pdf24 Jun 2026
Withdrawal Update Form 2File: Form 2_Sep 25.pdf24 Jun 2026
Withdrawal Update Form 2File: Form 2_Dec 25.pdf24 Jun 2026
Withdrawal Update Form 2File: Form 2_Mar 2026.pdf24 Jun 2026
Withdrawal Update Form 3File: Form 3_Jun 25.pdf24 Jun 2026
Withdrawal Update Form 3File: Form 3_Sep 25.pdf24 Jun 2026
Withdrawal Update Form 3File: Form 3_Dec 25.pdf24 Jun 2026
Withdrawal Update Form 3File: Form 3_Mar 2026.pdf24 Jun 2026
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 8) Form 1 Star World March 2025.pdf10 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 10) Form 3 December 24 Star World 2024-25_11zon.pdf6 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 7) FORM 2 Star World December 2024.pdf5 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: 7) StarWolrdA - Form 5.pdf10 Jan 2025
Building plan approvalFile: PLAN COPY 14032023-1.pdf9 Jan 2025
Building plan approvalFile: PLAN COPY 14032023-2.pdf9 Jan 2025
Building plan approvalFile: PLAN COPY 14032023-3.pdf9 Jan 2025
Building plan approvalFile: PLAN COPY 14032023-4.pdf9 Jan 2025
Building plan approvalFile: PLAN COPY 14032023-5.pdf9 Jan 2025
Building plan approvalFile: PLAN COPY 14032023-6.pdf9 Jan 2025
Building plan approvalFile: PLAN COPY 14032023-7.pdf9 Jan 2025
Building plan approvalFile: PLAN COPY 14032023-8.pdf9 Jan 2025
Building plan approvalFile: PLAN COPY 14032023-9.pdf9 Jan 2025
Building plan approvalFile: PLAN COPY 14032023-10.pdf9 Jan 2025
Building plan approvalFile: PLAN COPY 14032023-11.pdf9 Jan 2025
Building plan approvalFile: PLAN COPY 14032023-12.pdf9 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 5) Form 1 Star World December 2024.pdf9 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: PLAN COPY 14032023-5.pdf9 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: PLAN COPY 14032023-12.pdf9 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: PLAN COPY 14032023-11.pdf9 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: PLAN COPY 14032023-10.pdf9 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: PLAN COPY 14032023-9.pdf9 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: PLAN COPY 14032023-8.pdf9 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: PLAN COPY 14032023-7.pdf9 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: PLAN COPY 14032023-6.pdf9 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: PLAN COPY 14032023-4.pdf9 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: PLAN COPY 14032023-3.pdf9 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: PLAN COPY 14032023-2.pdf9 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: PLAN COPY 14032023-1.pdf9 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 4) Form 1 Star World September 2024.pdf26 Dec 2024
Disclosure of sold/ booked inventoryFile: Q2 Sold Booked Star World September 24.pdf25 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 6) Form 3 September 24 Star World 2024-25.pdf24 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 5) FORM 2 Star World September 2024.pdf24 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Star World Form 1 Q4 23-24.pdf16 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Star World June 2024.pdf16 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 7) Form 2A Star World March 2024.pdf5 Jul 2024
Disclosure of sold/ booked inventoryFile: Q4 Sold Booked Star World March 24.pdf5 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2) FORM 2 Star World March 2024.pdf3 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 6) Form 3 March24 Star World 2023-24.pdf3 Jul 2024
Details of encumbrancesFile: Index II Mortgage.pdf26 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Star World Form 1 Q4 23-24.pdf10 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Star World Dec 2023.pdf10 Jan 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: SEPERATE BANK ACCOUNT.pdf10 Jan 2024
Disclosure of sold/ booked inventoryFile: Sold Booked Star World Dec 23.pdf9 Jan 2024
Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE DT 14032023.pdf8 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - SW.pdf8 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Star World Dec 2023.pdf8 Jan 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Anx A - Disclosure of Int - DBD.pdf9 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Star World Form 1.pdf31 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Star World.pdf31 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Star World Form 3.pdf31 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Star World - Form 5.pdf31 Oct 2023
PAN CardFile: 1 PAN Card.pdf17 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1 STAR WORLD.pdf8 Jul 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Star World.pdf9 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Star World.pdf18 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Star_World.pdf18 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: star world form 2.pdf31 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: star world form 2A.pdf31 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 STAR WORLD.pdf20 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A STAR WORLD.pdf20 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE STAR WORLD.pdf12 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ca certicate scab_compressed (1).pdf21 Aug 2021
Details of encumbrancesFile: Declaration.pdf19 Aug 2021
Declaration about Commencement CertificateFile: Format D.pdf19 Aug 2021
Declaration in FORM BFile: dbd.pdf19 Aug 2021
Layout approvalFile: LAYOUT.pdf16 Aug 2021
Building plan approvalFile: scan1669.pdf16 Aug 2021

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
SAI ANAND PRIDESINNAR GHOTI ROAD NEAR NAVJEEVAN SCHOOL SINNAR NASHIK112CompletedApr 2017Apr 2017

How this compares with Nashik

60%of this project is bookeddistrict median 17%
10%of Nashik projects moved their completion datethis one has not
19%of Nashik registrations have lapsed or been cancelledthis one is on the register

Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.

Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep STAR WORLD on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near GOVIND NAGAR4,100+ in Nashik

2 kmSTAR WORLDCompleted 100Lapsed / revoked 17Other 69Dot size: filed unitsN

Filed coordinates, straight-line distance. 186 registered projects within 2 km.

Builder: DEEPAK KALYANJI CHANDE

DEEPAK KALYANJI CHANDE has 10 registrations on MahaRERA, including SAI RATAN RESIDENCY and STAR LINE. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Nashik district page.

Frequently asked questions

What are my rights if STAR WORLD is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of STAR WORLD?

The registered promoter entity is DEEPAK KALYANJI CHANDE, an individual as per the filing. Its GSTIN 27AAYPC1156H1ZK can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in STAR WORLD?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for STAR WORLD?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at STAR WORLD?

The professionals named in the filing: Architect: DHIRAJ WALUNJ; Engineer: RELIABLE CONSULTANT; Engineer: Mukund Govind Bagul; Chartered Accountant: CA VISHAL MUSALE; Chartered Accountant: CA Bhalchandra Salunke; Chartered Accountant: Sachin K. Mishra & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in STAR WORLD?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About STAR WORLD. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save STAR WORLD to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.