Home / Browse projects / Nashik, Maharashtra / THREE LEAVES PHASE ONE

Registered No litigation declared Residential / Group Housing project

THREE LEAVES PHASE ONE

By DEEPAK INFRA AND HOMES PRIVATE LIMITED

RG-MH-46142 · RERA P51600047728 · Last updated on MahaRERA portal: 29 Aug 2026

Source: official MahaRERA filing

Red flags

  • Rs 74.00 crore secured on the land, in favour of Aditya Birla Housing Finance Limited
  • The declared charge does not appear in the CERSAI report on the filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.
Dec 2030Possession promisedno revision filed
3 of 22Construction stages doneacross 2 buildings; furthest along: Basement (if any), 50%
136 of 256Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 101 documents Report an error

THREE LEAVES PHASE ONE is a Residential / Group Housing project by DEEPAK INFRA AND HOMES PRIVATE LIMITED in Nashik, Maharashtra, registered with MahaRERA as P51600047728 on 21 Nov 2022. Possession is promised by 31 Dec 2030. 120 of the 256 units on this registration are recorded sold or booked, and 3 of 22 construction stages are filed complete.

At a glance

Project

  • NameTHREE LEAVES PHASE ONE
  • TypeResidential / Group Housing
  • Location
    • GOVIND NAGAR
    • Nashik (M Corp.)
    • Nashik
    • 422009
  • Pincode422009
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51600047728
  • ReraGenie IDRG-MH-46142

Builder

  • NameDEEPAK INFRA AND HOMES PRIVATE LIMITED
  • Entity typeCompany
  • CINU45309MH2021PTC354411
  • GSTIN27AAICD2895D1ZI
  • CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • Managing DirectorDEEPAK KALYANJI CHANDE
  • DirectorSHUBH DEEPAK CHANDE
  • Other registrations6 more →
  • Declared earlier projects5 →

Key dates

this monthRegisteredNov 2022PromisedDec 2030

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on21 Nov 2022
  • Promised completion31 Dec 2030
  • Revised completionNone
  • Buildings2 building records
  • Documents filed101 files

Current status

47%120 of 256 units booked
14.5%Work done, per cost certificate

Figures as on 29 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A WINGNA37371280128
C WINGNA37371280128

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 29 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Basement (if any), at 50%.

A WING21%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
C WING15%
ActivityProgress
Excavation100%
Basement (if any)50%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks20%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 29 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed2

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots2
Closed/Covered2
BuildingClosed/CoveredTotal
A WING11
C WING11

Land and ownership16

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area10,610 sq m
Land owned byThe promoter, with other names on the file
Named landowners16
Encumbrance on the landDeclared present
Charge in favour ofAditya Birla Housing Finance Limited
Secured amountRs 74.00 crore
CERSAI search filedYes
Declared on20 Jan 2026
LandownerVillageDistrict
Nanda Ashok MotkariNashikNashik
Indubai Bhudha WadgeMalagaonNashik
DNYANESHWAR NIVRUTTI MOTKARINashikNashik
SURESH NIVRUTTI MOTKARINashikNashik
ASHA KAILASH MOTKARINashikNashik
VRUSHALI KAILASH MOTKARINashikNashik
BHARTI ANIL MAHAJANNashikNashik
CHANDRAKALA HIRAMAN MOTKARINashikNashik
KASHINATH NIVRUTTI MOTKARINashikNashik
HIRABAI ANANDRAO GAIKWADNashikNashik
BHALCHANDRA HIRAMAN MOTKARINashikNashik
REENA SUMIT KHAIRNARNashikNashik
ROHINI SHARAD MAHAJANNashikNashik
CHETANA MANOJ SHEWALEAurangabad (M Corp.)Aurangabad
VALMIK NIVRUTTI MOTKARINashikNashik
BEBIBAI BARAKU MAHAJANMalagaonNashik

Approvals and building plan

Sanctioning authorityNashik Municipal Corporation
Permissible FSI111849.73
Proposed, not sanctioned60,852 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSME BRANCH NEAR SHINGADA TALAV
Estimated costRs 187.23 cr
Cost incurredRs 27.12 cr
Work done14.49%
BuildingWingEstimatedIncurred
A WINGNARs 93.62 crRs 13.56 cr
C WINGNARs 93.62 crRs 13.56 cr

Certifying professionals and partners8

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVASTUMITRAS ARCHITECTS
ArchitectDhiraj Walunj
EngineerRELIABLE CONSULTANT
EngineerMukund G Bagul
Chartered AccountantCA VISHAL MUSALE
Chartered AccountantCA Bhalchandra R Salunke
Chartered AccountantSachin K. Mishra & Co.
Chartered AccountantR H Pothiwal & Associates
PartnerRole in project
DEEPAK INFRA AND HOMES PRIVATE LIMITED-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Oct 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 31 Oct 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 31 Oct 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 29 Oct 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2030

Documents filed101

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 101 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: FORM 2A - TL - ONE - MAR 2025.pdf29 Aug 2026
Withdrawal Update Form 1File: Form 1_Jun 26.pdf5 Aug 2026
Withdrawal Update Form 2File: Form 2_Jun 26.pdf5 Aug 2026
Withdrawal Update Form 3File: Form 3_Jun 26.pdf5 Aug 2026
Withdrawal Update Form 1File: Form 1_Mar 26.pdf24 Jun 2026
Withdrawal Update Form 2File: Form 2_Mar 26.pdf24 Jun 2026
Withdrawal Update Form 3File: Form 3_Mar 26.pdf24 Jun 2026
Withdrawal Update Form 1File: Form 1 T L Phase I Sep -25.pdf7 Apr 2026
Withdrawal Update Form 1File: Form 1 T L Phase I Dec-25.pdf7 Apr 2026
Withdrawal Update Form 2File: Form 2 T L Phase I - Sep 25.pdf7 Apr 2026
Withdrawal Update Form 2File: Form 2 Dec 25.pdf7 Apr 2026
Withdrawal Update Form 3File: CA Certificate_TL_Phase I_Sep25.pdf7 Apr 2026
Withdrawal Update Form 3File: CA Certificate_TL_Phase I_Dec25.pdf7 Apr 2026
Form 2A (FY 2023-2024)File: FORM 2A - TL - ONE - MAR 23-24.pdf7 Apr 2026
Form 2A (FY 2024-2025)File: FORM 2A - TL - ONE - MAR 2025.pdf7 Apr 2026
Form 5 (FY 2024-2025)File: Audit Report FY 2024-25.pdf7 Apr 2026
Withdrawal Update Form 1File: Form 1 T L Phase I June -25.pdf6 Apr 2026
Withdrawal Update Form 2File: Form 2 T L Phase I - Jun 25.pdf6 Apr 2026
Withdrawal Update Form 3File: CA Certificate_TL_Phase I_Jun25.pdf6 Apr 2026
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2) Form 1 Three Leaves P1 March 2025.pdf10 May 2025
Proforma of Agreement for saleFile: RERA Three Leaves AFS Draft.pdf29 Apr 2025
Details of encumbrances concerned to FinanceFile: ABHFL TL Finance Encumbrance.pdf9 Apr 2025
Details of encumbrances concerned to LegalFile: ABHFL TL Finance Encumbrance.pdf9 Apr 2025
Details of encumbrances concerned to FinanceFile: Mortgage Index II.pdf20 Mar 2025
Details of encumbrances concerned to LegalFile: Mortgage Index II.pdf20 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 5) Form 3 December 24 Three Leaves P-1 2024-25 for bank_11zon.pdf6 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 9) FORM 2 Three Leaves P1 December 2024.pdf6 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: 2) ThreeLeaves P1 - Form 5.pdf10 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2) Form 1 Three Leaves P1 December 2024.pdf9 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 7) Form 1 Three Leaves P1 September 2024.pdf26 Dec 2024
Disclosure of sold/ booked inventoryFile: Q2 Sold Booked Three Leaves P1 September 24.pdf25 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 6) FORM 2 Three Leaves P1 September 2024.pdf24 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 8) Form 3 September 24 Three Leaves P-1 2024-25 for bank.pdf24 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 6) FORM 2 Three Leaves P1 September 2024.pdf24 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 8) Form 2A Three Leaves P1 March 2024.pdf5 Jul 2024
Disclosure of sold/ booked inventoryFile: Q4 Sold Booked Three Leaves P1 March 24.pdf5 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 9) FORM 2 Three Leaves P1 March 2024.pdf3 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 March24 Three Leaves P-1 2023-24.pdf3 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Three Leaves P-1 Form 1 Q4 23-24.pdf10 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Three Leaves P1 Feb 2024 for Bank Purpose.pdf23 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Dec 23 Three Leaves P-1 2023-24 for Bank.pdf23 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Three L P1 Dec 23.pdf5 Feb 2024
Disclosure of sold/ booked inventoryFile: Sold Booked Three L P1 Dec 23.pdf5 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Three L P1 Dec 23.pdf5 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1-TL.pdf8 Jan 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Anx A - Disclosure of Int - DIHPL-DKC.pdf9 Nov 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Anx A - Disclosure of Int - DIHPL-SDC.pdf9 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Three Leaves - Form 5.pdf31 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - THREE LEAVES.pdf28 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Three Leaves.pdf28 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Three Leaves Form 3 (2).pdf28 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - THREE LEAVES.pdf8 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificate Three Leaves.pdf10 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: three leaves form 2.pdf31 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: three leaves form 2A.pdf31 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 - THREE LEAVES.pdf31 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Image_007.pdf31 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: ENCUMBRANCE.pdf9 Nov 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: ENCUMBRANCE.pdf9 Nov 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: ENCUMBRANCE.pdf9 Nov 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: ENCUMBRANCE.pdf9 Nov 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: ENCUMBRANCE.pdf9 Nov 2022
Other - FinanceFile: ENCUMBRANCE.pdf9 Nov 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: SEPERATE BANK ACCOUNT PDF.pdf7 Nov 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Estimated cost of the Project .pdf1 Nov 2022
Layout approvalFile: layout.pdf31 Oct 2022
Building plan approvalFile: Plan_1.pdf31 Oct 2022
Building plan approvalFile: layout.pdf31 Oct 2022
Building plan approvalFile: Plan_3.pdf31 Oct 2022
Building plan approvalFile: Plan_4.pdf31 Oct 2022
Building plan approvalFile: Plan_5.pdf31 Oct 2022
Building plan approvalFile: Plan_6.pdf31 Oct 2022
Building plan approvalFile: Plan_7.pdf31 Oct 2022
Building plan approvalFile: Plan_8.pdf31 Oct 2022
Building plan approvalFile: Plan_9.pdf31 Oct 2022
Building plan approvalFile: Plan10.pdf31 Oct 2022
Building plan approvalFile: Plan_11.pdf31 Oct 2022
PAN CardFile: PAN - DEEPAK INFRA AND HOMES PRIVATE LIMITED.pdf31 Oct 2022
Copy of Layout Approval (in case of layout)File: layout.pdf31 Oct 2022
Building Plan Approval / NA Order for plotted developmentFile: Plan_1.pdf31 Oct 2022

Promoter's earlier projects5

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

5 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
THREE LEAVES PHASE THREEP51600077479GOVIND NAGAR NASHIK, Nashik48Aug 2024OngoingDec 2030Not due yet
STAR APEXP51600080393GOVIND NAGAR, Nashik119Jun 2025OngoingDec 2030Not due yet
NATHSEETA YEOLEKAR COMPLEXP51600030928BEHIND EASY DAY MALL, Nashik204Sep 2021OngoingDec 2028Not due yet
NATHSEETA YEOLEKAR COMPLEXP51600030928BEHIND EASY DAY MALL, Nashik204Sep 2021OngoingDec 2028Not due yet
AMRAPALIP51600054225Nashik, Nashik29Jan 2024OngoingNov 2027Not due yet

How this compares with Nashik

47%of this project is bookeddistrict median 17%
10%of Nashik projects moved their completion datethis one has not
19%of Nashik registrations have lapsed or been cancelledthis one is on the register

Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.

Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep THREE LEAVES PHASE ONE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near GOVIND NAGAR4,100+ in Nashik

2 kmTHREE LEAVES PHASE ONECompleted 114Lapsed / revoked 23Other 80Dot size: filed unitsN

Filed coordinates, straight-line distance. 217 registered projects within 2 km.

Builder: DEEPAK INFRA AND HOMES PRIVATE LIMITED

DEEPAK INFRA AND HOMES PRIVATE LIMITED has 7 registrations on MahaRERA, including NATHSEETA YEOLEKAR COMPLEX and RADHA NAGARI. Its filings disclose 5 earlier MahaRERA projects, none completed yet. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Nashik district page.

Frequently asked questions

What are my rights if THREE LEAVES PHASE ONE is delayed beyond 31 Dec 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of THREE LEAVES PHASE ONE?

The registered promoter entity is DEEPAK INFRA AND HOMES PRIVATE LIMITED, a company as per the filing. Its CIN U45309MH2021PTC354411 and GSTIN 27AAICD2895D1ZI can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in THREE LEAVES PHASE ONE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for THREE LEAVES PHASE ONE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at THREE LEAVES PHASE ONE?

The professionals named in the filing: Architect: VASTUMITRAS ARCHITECTS; Architect: Dhiraj Walunj; Engineer: RELIABLE CONSULTANT; Engineer: Mukund G Bagul; Chartered Accountant: CA VISHAL MUSALE; Chartered Accountant: CA Bhalchandra R Salunke. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in THREE LEAVES PHASE ONE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About THREE LEAVES PHASE ONE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save THREE LEAVES PHASE ONE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.