Home / Browse projects / Nashik, Maharashtra / ANANDGRAM
ANANDGRAM
By MAP INFRA
RG-MH-33616 · RERA P51600051452 · Last updated on MahaRERA portal: 15 Jun 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Rs 30.00 crore secured on the land, in favour of STATE BANK OF INDIA
- The declared charge does not appear in the CERSAI report on the filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- All 1 earlier projects delivered on promise
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
ANANDGRAM is a Residential / Group Housing project by MAP INFRA in Nashik, Maharashtra, registered with MahaRERA as P51600051452 on 23 Jun 2023. Possession is promised by 31 Mar 2029. 108 of the 218 units on this registration are recorded sold or booked, and 2 of 11 construction stages are filed complete.
At a glance
Project
- NameANANDGRAM
- TypeResidential / Group Housing
- Location
- DR NANASAHEB DHARMADHIKARI MARG
- DHARMAVEER SAMBHAJI RAJE CHOWK
- NEAR TARWALA NAGAR OPP SHIVNAGAR JOGGING TRACK AND SPORT GROUND PANCHAVATI NASHIK
- Nashik...
- Pincode422004
- RERA no.P51600051452
- ReraGenie IDRG-MH-33616
Builder
- NameMAP INFRA
- Entity typePartnership
- GSTIN27ABIFM3332J1Z6
- GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
- PartnersPANKAJ PAGAR, PRASHANT KHAIRNAR, PRASHANT WAGH, PALLAVI DHONDGE
- Other registrations3 more →
- Completed1 of 4
- Declared earlier projects2 →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on23 Jun 2023
- Promised completion31 Mar 2029
- Revised completionNone
- Buildings1 building record
- Documents filed106 files
Current status
Figures as on 15 Jun 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| ANANDGRAM | NA | 23 | 20 | 190 | 28 | 218 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 15 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
2 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 95%.
ANANDGRAM: 61% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 95% |
| Podiums (if any) | 85% |
| Plinth | 100% |
| Stilt Floor | 95% |
| Slabs of Super Structure | 95% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 65% |
| Sanitary Fittings within the flats / premises | 10% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 15% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 15% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 15 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed530
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| ANANDGRAM | NA | Rs 43.20 cr | Rs 35.80 cr |
Certifying professionals and partners11
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | KAPIL THAKKAR & ASSOCIATES |
| Architect | KAPIL THAKKAR |
| Engineer | SANDEEP HATAGALE |
| Engineer | MILIND SHYAMSUNDER RATHI |
| Engineer | MILIND RATHI |
| Engineer | BHUSHAN KALU BENKE |
| Chartered Accountant | BHALGAT BOTHARA & ASSOCIATES PARTNER TUSHAR LOKHANDE |
| Chartered Accountant | MUKESH V KHOND |
| Chartered Accountant | CA PRASAD SUNIL YEOLA |
| Chartered Accountant | PRASAD SUNIL YEOLA |
| Chartered Accountant | BHALGAT BOTHARA & ASSOCIATES |
| Partner | Role in project |
|---|---|
| MAP INFRA | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 17 May 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 17 May 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 17 May 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 17 May 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Mar 2029
Documents filed106
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 106 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 5 (FY 2025-2026)File: FORM 5 2025-26.pdf | 15 Jun 2026 |
| Form 5 (FY 2024-2025)File: FORM - 5 Anandgram - F Y 2024-25.pdf | 15 Jun 2026 |
| Withdrawal Update Form 1File: FORM-1 Q-4TH F Y 2025-26 ANANDGRAM.pdf | 11 Jun 2026 |
| Withdrawal Update Form 2File: FORM-2 Q-4TH F Y 2025-26 ANANDGRAM_organized.pdf | 11 Jun 2026 |
| Withdrawal Update Form 3File: FORM 3 MARCH 2026.pdf | 11 Jun 2026 |
| Withdrawal Update Form 1File: Form-1 Anandgram Q-3rd F Y 2025-26.pdf | 24 Mar 2026 |
| Withdrawal Update Form 2File: Form-2 Anandgram Q-3rd F Y 2025-26.pdf | 24 Mar 2026 |
| Withdrawal Update Form 3File: Form-3 Anandgram Q-3rd F Y 2025-26.pdf | 24 Mar 2026 |
| Withdrawal Update Form 1File: FROM 1 Architect Certificate MAP INFRA.pdf | 13 Feb 2026 |
| Withdrawal Update Form 1File: FROM 1 Architect Certificate MAP INFRA.pdf | 13 Feb 2026 |
| Withdrawal Update Form 2File: FORM-2 Map Infra Q-2nd F Y 2025-26.pdf | 13 Feb 2026 |
| Withdrawal Update Form 2File: FORM-2 Map Infra Q-2nd F Y 2025-26.pdf | 13 Feb 2026 |
| Withdrawal Update Form 3File: FORM-3 Map Infra Q-2nd F Y 2025-26..pdf | 13 Feb 2026 |
| Withdrawal Update Form 3File: FORM-3 Map Infra Q-2nd F Y 2025-26..pdf | 13 Feb 2026 |
| Withdrawal Update Form 1File: FROM -1 Architectu0027s Certificate MAP INFRA q-1st F Y 25-26 .pdf | 30 Sep 2025 |
| Withdrawal Update Form 2File: Form-2 Anandgram Q-1st F Y 25-26 .pdf | 30 Sep 2025 |
| Withdrawal Update Form 3File: Form-3 Anandgram Q-1st F Y 25-26.pdf | 30 Sep 2025 |
| Form 1File: FORM-1 Q-4th F Y 2024-25 .pdf | 6 Aug 2025 |
| Form 2File: Form 2 Q-1st F Y 2025-26.pdf | 6 Aug 2025 |
| Form 3File: Form-3 Q-4th F Y 2024-25.pdf | 6 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Inventory-Q-1st F Y 2025-26.pdf | 6 Aug 2025 |
| Form 1File: FORM-1 Q-3RD F Y 2024-25 .pdf | 6 Aug 2025 |
| Form 2File: FORM-2 ANANDGRAM Q-3RD .pdf | 6 Aug 2025 |
| Form 3File: FORM -3 ANANDGRAM Q-3RD F Y 2024-25.pdf | 6 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD INVENTORIES Q-3RD .pdf | 6 Aug 2025 |
| Form 1File: Form 1 Q-2nd F Y 2024-25 .pdf | 6 Aug 2025 |
| Form 2File: FORM-2 Q-2ND F Y 2024-25 ANANDGRAM .pdf | 6 Aug 2025 |
| Form 3File: Form -3 Anandgram q-2nd f y 2024-25-compressed.pdf | 6 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD INVENTORIES Q-3RD .pdf | 6 Aug 2025 |
| Form 1File: Form 1 Q-1st F Y 2024-25 .pdf | 6 Aug 2025 |
| Form 2File: Form 2 Q-1st F Y 2024-25 .pdf | 6 Aug 2025 |
| Form 3File: FORM-3 ANANDGRAM Q-1ST F Y 2024-25 -compressed.pdf | 6 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD INVENTORIES Q-3RD .pdf | 6 Aug 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM -3 ANANDGRAM Q-3RD F Y 2024-25.pdf | 31 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 Q-3RD F Y 2024-25 .pdf | 28 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 ANANDGRAM Q-3RD .pdf | 28 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD INVENTORIES Q-3RD .pdf | 28 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q-1st F Y 2024-25 .pdf | 5 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q-2nd F Y 2024-25 .pdf | 5 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 ANANDGRAM Q-1ST F Y 2024-25 -compressed.pdf | 5 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form -3 Anandgram q-2nd f y 2024-25-compressed.pdf | 5 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q-1st F Y 2024-25 .pdf | 5 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 Q-2ND F Y 2024-25 ANANDGRAM .pdf | 5 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Q-4TH 23-24 .pdf | 25 Jun 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM -2 ANANDGRAM F Y 2023-24 Q-4TH.pdf | 3 Jun 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM -2A ANANDGRAM F Y 2023-24 .pdf | 3 Jun 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 march 2024_compressed.pdf | 3 Jun 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form -5 Anandgram F Y 2023-24.pdf | 3 Jun 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form -5 Anandgram F Y 2023-24.pdf | 3 Jun 2024 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD INVENTORY 31032024.pdf | 26 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ANANDGRAM Q-2nd F Y 2023-24.pdf | 9 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q-3rd F Y 2023-24 Anandgarm.pdf | 9 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM -2 ,ANANDGRAM Q-2nd F Y 2023-24.pdf | 9 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM -2 ,ANANDGRAM Q-3rd F Y 2023-24.pdf | 9 Feb 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA Form 3 Quarter 3rd F Y 2023-24_compressed.pdf | 29 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Anandgram form 3_compressed.pdf | 6 Nov 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of int pankaj pagar sir.pdf | 12 Jun 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of int Pallavi dhondage.pdf | 12 Jun 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of int Prashant khairnar sir.pdf | 12 Jun 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of int Prashant wagh sir.pdf | 12 Jun 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of int salunkhe sir.pdf | 12 Jun 2023 |
| Other - LegalFile: Final Agreement for sale.pdf | 12 Jun 2023 |
| Layout approvalFile: LAYOUT HADKAYAM NAKASHA.pdf | 17 May 2023 |
| Building plan approvalFile: IMG-20230517-WA0002.pdf | 17 May 2023 |
| Layout approvalFile: IMG-20230517-WA0002.pdf | 17 May 2023 |
| Layout approvalFile: letter to maharera.pdf | 17 May 2023 |
| Layout approvalFile: NA.pdf | 17 May 2023 |
| Layout approvalFile: DLR.pdf | 17 May 2023 |
| Building plan approvalFile: PLAN 1.pdf | 17 May 2023 |
| Building plan approvalFile: PLAN 2.pdf | 17 May 2023 |
| Building plan approvalFile: PLAN 3.pdf | 17 May 2023 |
| Building plan approvalFile: PLAN 4.pdf | 17 May 2023 |
| Building plan approvalFile: PLAN 5.pdf | 17 May 2023 |
| Building plan approvalFile: PLAN 6.pdf | 17 May 2023 |
| Building plan approvalFile: PLAN 7.pdf | 17 May 2023 |
| PAN CardFile: PAN OF FIRM.pdf | 17 May 2023 |
| Copy of the legal title reportFile: Title Search_compressed (1).pdf | 17 May 2023 |
| Details of encumbrances concerned to FinanceFile: No encumbrance legal.pdf | 17 May 2023 |
| Details of encumbrances concerned to FinanceFile: No Encumbrances Financial.pdf | 17 May 2023 |
| Details of encumbrances concerned to LegalFile: No encumbrance legal.pdf | 17 May 2023 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| S K EMPIRE | NEAR MICO CIRCLE TIDKE COLONY TRIMBAK ROAD NASHIK - 422002 | 60 | Completed | Dec 2025 | May 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nashik
Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.
Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 3 other registrations, which the RERA portal never shows together
- All 106 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep ANANDGRAM on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near NEAR TARWALA NAGAR OPP SHIVNAGAR JOGGING TRACK AND SPORT GROUND PANCHAVATI NASHIK4,100+ in Nashik
GLOBAL VILLE
SHRADDHA INFRA
PEACOCK HILLS
PEACOCK HILLS BUILDTECH LLP
The Northland by Madhu Vitthal
Northland Realty
RAMCHANDRA NAGAR
DESHPANDE CONSTRUCTIONS & LAND DEVELOPERS
KRISHNA PRANIT APARTMENT
BODKE BUILDCON
AKSHAR VISHWA
AKSHAR BUILDCON
See every Nashik project, with the district possession charts
Builder: MAP INFRA
MAP INFRA has 4 registrations on MahaRERA, including S K EMPIRE and ANANDGRAM. Its filings disclose 2 earlier MahaRERA projects: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Nashik district page.
Frequently asked questions
What are my rights if ANANDGRAM is delayed beyond 31 Mar 2029?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of ANANDGRAM?
The registered promoter entity is MAP INFRA, a partnership as per the filing. Its GSTIN 27ABIFM3332J1Z6 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in ANANDGRAM?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for ANANDGRAM?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at ANANDGRAM?
The professionals named in the filing: Architect: KAPIL THAKKAR & ASSOCIATES; Architect: KAPIL THAKKAR; Engineer: SANDEEP HATAGALE; Engineer: MILIND SHYAMSUNDER RATHI; Engineer: MILIND RATHI; Engineer: BHUSHAN KALU BENKE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in ANANDGRAM?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.