Home / Browse projects / Nashik, Maharashtra / Anandvan Housing Complex
Anandvan Housing Complex
RG-MH-13249 · RERA P51600023994 · Last updated on MahaRERA portal: 25 Jun 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- 1 complaint at MahaRERA
Clear
- No litigation declared
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Anandvan Housing Complex is a Others project by Ravi Mahajan Buildcon LLP in Nashik, Maharashtra, registered with MahaRERA as P51600023994 on 14 Jan 2020. Possession is promised by 30 Dec 2027. 191 of the 291 units on this registration are recorded sold or booked, and 7 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.
At a glance
Project
- NameAnandvan Housing Complex
- TypeOthers
- Location
- Kathe Galli
- Vithoba Nagar
- Nashik (M Corp.)
- Nashik
- 422011
- Pincode422011
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51600023994
- ReraGenie IDRG-MH-13249
Builder
- NameRavi Mahajan Buildcon LLP
- Entity typePartnership
- GSTIN27AAXFR9881R1ZI
- PartnersAnuradha Ravi Mahajan, Abhishek Ravindra Mahajan, Aditya Ravindra Mahajan
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on14 Jan 2020
- Promised completion30 Dec 2027
- Revised completionNone
- Buildings1 building record
- Documents filed166 files
Current status
Figures as on 25 Jun 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Anandvan A,B,C,D and E wing | NA | 16 | 14 | 260 | 31 | 291 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 25 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
7 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 95%.
Anandvan A,B,C,D and E wing: 89% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 95% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 95% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 90% |
Progress on shared amenities15
As on 25 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 70% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 70% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 70% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 70% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 90% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 60% |
Parking filed293
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership6
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Ravi Mahajan Buildcon LLP | Nashik (M Corp.) | Nashik |
| Baburao Vithoba Kathe | Govardhan | Nashik |
| Govind Vithoba Kathe | Nashik (M Corp.) | Nashik |
| Suresh Vithoba Kathe | Govardhan | Nashik |
| Arun Vithoba Kathe | Govardhan | Nashik |
| Ganpat Vithoba Kathe | Nashik (M Corp.) | Nashik |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Anandvan A,B,C,D and E wing | NA | Rs 64.58 cr | Rs 68.05 cr |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Umesh Bagul |
| Engineer | Mr Umesh Joshi |
| Engineer | Mr Ajinkya Magar For J W Consultant LLP |
| Engineer | Nitin Lokhande |
| Chartered Accountant | Pratik Parnerkar |
| Chartered Accountant | Prasad Bhatt |
| Partner | Role in project |
|---|---|
| Ravi Mahajan Buildcon LLP | - |
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| SM12500112 | Ram Gawali | Ravi Mahajan Buildcon LLP | 02/09/2025 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 1 Jan 2020 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 1 Jan 2020 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 9 Mar 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 19 Apr 2025Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 15 Feb 2025
Documents filed166
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 166 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form1 Dec 25.pdf | 25 Jun 2026 |
| Withdrawal Update Form 2File: Form 2 Dec 25.pdf | 25 Jun 2026 |
| Withdrawal Update Form 3File: FORM 3 DEC 2025 FINAL.pdf | 25 Jun 2026 |
| Form 1File: Form 1 Jun 23.pdf | 9 Apr 2026 |
| Form 2File: Form 2 Jun 23.pdf | 9 Apr 2026 |
| Form 3File: FORM 3 MERGE JUNE 2023.pdf | 9 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: Disco Of Sold june 2023.pdf | 9 Apr 2026 |
| Form 1File: Form 1 Sep 23.pdf | 9 Apr 2026 |
| Form 2File: Form 2 Sep 23.pdf | 9 Apr 2026 |
| Form 3File: FORM 3 MERGE SEPT 2023.pdf | 9 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: Disco Of Sold sept 2023.pdf | 9 Apr 2026 |
| Form 1File: Form 1 Dec 23.pdf | 9 Apr 2026 |
| Form 2File: Form 2 Dec 23.pdf | 9 Apr 2026 |
| Form 3File: FORM 3 DEC MERGE 2023.pdf | 9 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: Disco Of Sold DEC 2023.pdf | 9 Apr 2026 |
| Form 1File: Form 1 Mar 24.pdf | 9 Apr 2026 |
| Form 2File: Form 2 Mar 24.pdf | 9 Apr 2026 |
| Form 3File: FORM 3 MERGE MARCH 2024.pdf | 9 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: Disco Of Sold MARCH 2024.pdf | 9 Apr 2026 |
| Form 1File: Form 1 Jun 24.pdf | 9 Apr 2026 |
| Form 2File: Form 2 Jun 24.pdf | 9 Apr 2026 |
| Form 3File: FORM 3 MERGE JUNE 2024.pdf | 9 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: Anandvan DIsclosure JUNE 2024.PDF | 9 Apr 2026 |
| Form 1File: Form 1 Sep 24.pdf | 9 Apr 2026 |
| Form 2File: Form 2 Sep 24.pdf | 9 Apr 2026 |
| Form 3File: FORM 3 MERGE SEPT 2024.pdf | 9 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: Disco Of Sold SEPT 2024.pdf | 9 Apr 2026 |
| Form 1File: Form 1 Dec 24.pdf | 9 Apr 2026 |
| Form 2File: Form 2 Dec 24.pdf | 9 Apr 2026 |
| Form 3File: FORM 3 MERGE DEC 2024.pdf | 9 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold -Anandvan DEC 2024.PDF | 9 Apr 2026 |
| Form 1File: Form 1 Mar 25.pdf | 9 Apr 2026 |
| Form 2File: Form 2 Mar 25.pdf | 9 Apr 2026 |
| Form 3File: FORM 3 MERGE MARCH 2025.pdf | 9 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: Disco Of Sold MARCH 2025.pdf | 9 Apr 2026 |
| Form 1File: Form 1 June 25.pdf | 9 Apr 2026 |
| Form 2File: Form 2 June 25.pdf | 9 Apr 2026 |
| Form 3File: FORM 3 MERGE JUNE 2025.pdf | 9 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: Disco Of Sold JUNE 2025.pdf | 9 Apr 2026 |
| Form 1File: Form 1 Sep 25.pdf | 9 Apr 2026 |
| Form 2File: Form 2 Sep 25.pdf | 9 Apr 2026 |
| Form 3File: FORM 3 MERGE SEPT 2025.pdf | 9 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: Disco Of Sold SEPT 2025.pdf | 9 Apr 2026 |
| Commencement Certificates / NA Order for plotted developmentFile: Anandvan Revised CC April 25.pdf | 19 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 ANANDVAN.pdf | 7 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Anandvan Dislousucre.PDF | 7 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Anandvan Quality.PDF | 7 Apr 2025 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Anandvan Housing Complex Part completion.pdf | 15 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 ANANDVAN.pdf | 20 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold -Anandvan.PDF | 7 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: LLP FORM 5 23 24.PDF | 22 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 ANANDVAN.pdf | 19 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold -Anandvan Housing Co.pdf | 19 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Engineer Certificate -Anandvan.PDF | 19 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Certificate 30062023.PDF | 7 Aug 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Certificate 30092023.PDF | 7 Aug 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Certificate 30092023.PDF | 7 Aug 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Certificate 31032024.PDF | 7 Aug 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Certificate 30062024.PDF | 7 Aug 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA form 3 Anandvan March 2024 Land owner.PDF | 6 Aug 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA form 3 Anandvan March 24 Builder.PDF | 6 Aug 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA form 3 Andndvan June-24 land owner.PDF | 6 Aug 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA form 3 Anandvan June 2024 Builder.PDF | 6 Aug 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 ANANDVAN.pdf | 11 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Nitin Lokhande Eng Certificate.pdf | 11 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: Anandvan DIsclosure.PDF | 11 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 ANANDVAN.pdf | 17 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Anandvan Quality Assurance.PDF | 6 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: Anandvan Disclousure March 2024_compressed (1).pdf | 6 Apr 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Ravi Mahajan Buildcon LLP.PDF | 4 Mar 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Anandvan H C Developers Dec 23.PDF | 2 Feb 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: From 3 Anandvan H C Landowner Dec 23.PDF | 2 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificae FORM-1 ANANDVAN.pdf | 10 Jan 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Anandvan Housing Complex.PDF | 6 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: anandvan Sold inventor.PDF | 6 Jan 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 Ravi Mahajan Buildcon LLP.PDF | 28 Dec 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Devlopers 30-6-23.PDF | 9 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form No3 Landowners 30-6-2023.PDF | 9 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Devlopers 30-9-2023.PDF | 9 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Landowners 30-9-2023.PDF | 9 Nov 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nashik
Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.
Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 166 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Anandvan Housing Complex on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Vithoba Nagar4,100+ in Nashik
Filed coordinates, straight-line distance. 252 registered projects within 2 km.
SHREEJI INFINIA
SHREEJI LIFE SPACE
Waterways
Sanklecha Construction Private Limited
Shreejis Gujral Arcade
SHREEJI LIFE SPACE
VRAJ METROPOLIS SOUTH
SHREE INFRA SPACE
ALEEF BREEZE APARTMENT
KHATIB BUILDERS AND DEVELOPERS
SHREEBRAMHAND
SHREESWAMI CONSTRUCTIONS
See every Nashik project, with the district possession charts
Builder: Ravi Mahajan Buildcon LLP
Ravi Mahajan Buildcon LLP has 1 registration on MahaRERA, including Anandvan Housing Complex. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nashik district page.
Frequently asked questions
What are my rights if Anandvan Housing Complex is delayed beyond 30 Dec 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Anandvan Housing Complex?
The registered promoter entity is Ravi Mahajan Buildcon LLP, a partnership as per the filing. Its GSTIN 27AAXFR9881R1ZI can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Anandvan Housing Complex?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Anandvan Housing Complex?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Anandvan Housing Complex?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Anandvan Housing Complex?
The professionals named in the filing: Architect: Umesh Bagul; Engineer: Mr Umesh Joshi; Engineer: Mr Ajinkya Magar For J W Consultant LLP; Engineer: Nitin Lokhande; Chartered Accountant: Pratik Parnerkar; Chartered Accountant: Prasad Bhatt. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Anandvan Housing Complex?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback