Home / Browse projects / Nashik, Maharashtra / SHREEJI INFINIA

Completed No litigation declared Others project

SHREEJI INFINIA

By SHREEJI LIFE SPACE

RG-MH-14269 · RERA P51600031713 · Last updated on MahaRERA portal: 21 Sep 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 9 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedregistration recorded completed
24 of 55Construction stages doneacross 5 buildings; furthest along: External plumbing and external plaster, 95%
118 of 242Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 130 documents Report an error

SHREEJI INFINIA is a Others project by SHREEJI LIFE SPACE in Nashik, Maharashtra, registered with MahaRERA as P51600031713 on 8 Nov 2021. The registration is recorded completed; possession was promised by 31 Dec 2027. 124 of the 242 units on this registration are recorded sold or booked, and 24 of 55 construction stages are filed complete.

At a glance

Project

  • NameSHREEJI INFINIA
  • TypeOthers
  • Location
    • Tapovan Takli Road
    • Near Metro Mall
    • Nashik (M Corp.)
    • Nashik
    • 422011
  • Pincode422011
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51600031713
  • ReraGenie IDRG-MH-14269

Builder

  • NameSHREEJI LIFE SPACE
  • Entity typePartnership
  • GSTIN27ACVFS4150Q1Z5
  • PartnersSWATI ANJAN BHALODIA, NIKITA HASMUKHBHAI BHALODIA, MADHUBEN HASMUKHBHAI BHALODIA, ANJAN HASMUJHBHAI BHALODIA, HASMUKHBHAI KARSHANBHAI BHALODIA
  • Other registrations9 more →
  • Completed6 of 10

Key dates

this monthRegisteredNov 2021PromisedDec 2027Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on8 Nov 2021
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings5 building records
  • Documents filed130 files

Current status

51%124 of 242 units booked
63.7%Work done, per cost certificate

Figures as on 21 Sep 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SHREEJI INFINIA COMMERCIALNA17305252
SHREEJI INFINIA WING ANA171347047
SHREEJI INFINIA WING BNA171348048
SHREEJI INFINIA WING CNA171347047
SHREEJI INFINIA WING DNA171348048

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building5

As on 21 Sep 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

24 of 55 construction stages are filed complete across 5 buildings. The stage furthest along is External plumbing and external plaster, at 95%.

SHREEJI INFINIA COMMERCIAL52%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
SHREEJI INFINIA WING A75%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)85%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks85%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
SHREEJI INFINIA WING B75%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)85%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks85%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
SHREEJI INFINIA WING C84%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)85%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
SHREEJI INFINIA WING D81%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)85%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises25%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 21 Sep 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes50%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes65%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes30%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes30%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed670

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots670
Closed/Covered670
BuildingClosed/CoveredTotal
SHREEJI INFINIA COMMERCIAL134134
SHREEJI INFINIA WING A134134
SHREEJI INFINIA WING B134134
SHREEJI INFINIA WING C134134
SHREEJI INFINIA WING D134134

Land and ownership8

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area5,630 sq m
Land owned byThe promoter, with other names on the file
Named landowners8
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on15 Sep 2024
LandownerVillageDistrict
VITHABAI VEDU KASHMIRENashik (M Corp.)Nashik
VEDU GHAMAN KASHMIRENashik (M Corp.)Nashik
JAYASHREE BALASAHEB KASHMIRENashik (M Corp.)Nashik
BALASAHEB VEDU KASHMIRENashik (M Corp.)Nashik
SADASHIV VEDU KASHMIRENashik (M Corp.)Nashik
SHAILA SADASHIV KASHMIRENashik (M Corp.)Nashik
DNYANESHWAR PIRAJi PATILNashik (M Corp.)Nashik
KASHMIRE VEDU GHAMANNashik (M Corp.)Nashik

Approvals and building plan

Sanctioning authorityNashik Municipal Corporation
Permissible FSI23027.41
Proposed, not sanctioned16,554 sq m
Buildings approved5
Buildings sanctioned5

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSurkan Arcade, Bhujbal Farm Road, Plot No ME-1, CIDCO, Indira Nagar, Nashik-422009
Estimated costRs 68.37 cr
Cost incurredRs 43.53 cr
Work done63.67%
BuildingWingEstimatedIncurred
SHREEJI INFINIA COMMERCIALNARs 14.43 crRs 9.50 cr
SHREEJI INFINIA WING BNARs 13.06 crRs 8.60 cr
SHREEJI INFINIA WING ANARs 12.92 crRs 8.51 cr
SHREEJI INFINIA WING CNARs 12.91 crRs 8.50 cr
SHREEJI INFINIA WING DNARs 12.79 crRs 8.42 cr
-NARs 2.25 cr-

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSumit M Kumath
ArchitectSumit Kumath
EngineerShailesh Dhumne
EngineerKishor Chopda
Chartered AccountantLalit Rajendra Pawar
Chartered AccountantPiyush Verma
Chartered AccountantAnil Dahiya
PartnerRole in project
SHREEJI LIFE SPACE-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 26 Oct 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 20 Jul 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 8 Aug 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 20 Jul 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 30 Jan 2025

Documents filed130

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 130 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupational CertificateFile: SHREEJI INFINIA COMPLETION CERTIFICATE.pdf21 Sep 2025
Withdrawal Update Form 1File: Form 1 Infinia for RERA.pdf15 Jul 2025
Withdrawal Update Form 2File: Form 2 Shreeji Infinia_0001.pdf15 Jul 2025
Withdrawal Update Form 3File: Form 3 Infinia for Rera.pdf15 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 Shreeji Infinia.pdf16 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 Shreeji Infinia 31122024_compressed.pdf12 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Shreeji Infinia Form 5.pdf5 Feb 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Part Complition 31072024.pdf30 Jan 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Part Complition 31072024.pdf30 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Shreeji Infinia Q2_2324.pdf28 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Infinia Q2_2324.pdf28 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Shreeji Infinia Q3.pdf14 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Infinia Q2.pdf16 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Not Exceeding Limit Self Declaration-Shreeji Infinia.pdf16 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q1 Shreeji Infinia.pdf29 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Shreeji Infinia Form 2 Q4.pdf5 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Shreeji Infinia Form 3 Q4_compressed.pdf5 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Shreeji Infinia Form 1 Q4.pdf20 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1-SHREEJI INFINIA Q3.pdf24 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2-Shreeji Infinia Q3.pdf23 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 with Sign - compressed.pdf23 Feb 2024
Status of ConveyanceFile: Declaration deed Shreeji Infinia_compressed-compressed-1-23.pdf18 Jan 2024
Status of ConveyanceFile: Declaration deed Shreeji Infinia_compressed-compressed-24-46.pdf18 Jan 2024
Status of ConveyanceFile: Declaration deed Shreeji Infinia_compressed-compressed-47-69.pdf18 Jan 2024
Status of ConveyanceFile: Declaration deed Shreeji Infinia_compressed-compressed-70-92.pdf18 Jan 2024
Status of ConveyanceFile: Declaration deed Shreeji Infinia_compressed-compressed-93-103.pdf18 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Shreeji Infinia Q1 22-05-2023.pdf21 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Shreeji Infinia Q1 22-05-2023.pdf21 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Shreeji Infinia Q1 22-05-2023_compressed.pdf21 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Shreeji Infinia Form 3 till 30062022.pdf24 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Shreeji Infinia Form 3 till 30112022.pdf24 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Shreeji Infinia Form 3 till 28022023.pdf24 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Shreeji Infinia 22-23.pdf24 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Shreeji Infinia Q3 22-23.pdf23 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Shreeji Infinia Q4 22-23.pdf23 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Shreeji Infinia Q1.pdf23 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Shreeji Infinia Q2.pdf23 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Shreeji Infinia Q3 22-23.pdf23 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Shreeji Infinia Q4 22-23.pdf23 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 Shreeji Infinia.pdf22 Oct 2022
Building plan approvalFile: Plan001 (1).pdf8 Aug 2022
Building plan approvalFile: Plan00 (2).pdf8 Aug 2022
Building plan approvalFile: Plan00 (3).pdf8 Aug 2022
Building plan approvalFile: Plan00 (4).pdf8 Aug 2022
Building plan approvalFile: Plan00 (5).pdf8 Aug 2022
Building plan approvalFile: Plan00 (6).pdf8 Aug 2022
Building plan approvalFile: Plan00 (7).pdf8 Aug 2022
Building plan approvalFile: Plan00 (8).pdf8 Aug 2022
Building Plan Approval / NA Order for plotted developmentFile: Plan001 (1).pdf8 Aug 2022
Building Plan Approval / NA Order for plotted developmentFile: Plan00 (2).pdf8 Aug 2022
Building Plan Approval / NA Order for plotted developmentFile: Plan00 (3).pdf8 Aug 2022
Building Plan Approval / NA Order for plotted developmentFile: Plan00 (4).pdf8 Aug 2022
Building Plan Approval / NA Order for plotted developmentFile: Plan00 (5).pdf8 Aug 2022
Building Plan Approval / NA Order for plotted developmentFile: Plan00 (6).pdf8 Aug 2022
Building Plan Approval / NA Order for plotted developmentFile: Plan00 (7).pdf8 Aug 2022
Building Plan Approval / NA Order for plotted developmentFile: Plan00 (8).pdf8 Aug 2022
Building plan approvalFile: Plan 01 (1).pdf20 Jul 2022
Building plan approvalFile: Plan 02 (1).pdf20 Jul 2022
Building plan approvalFile: Plan 03 (1).pdf20 Jul 2022
Building plan approvalFile: Plan 04 (1).pdf20 Jul 2022
Building plan approvalFile: Plan 05 (1).pdf20 Jul 2022
Building plan approvalFile: Plan 06 (1).pdf20 Jul 2022
Building plan approvalFile: Plan 07 (1).pdf20 Jul 2022
Building plan approvalFile: Plan 08 (1).pdf20 Jul 2022
Layout approvalFile: Plan 01 (1).pdf20 Jul 2022
Layout approvalFile: Plan 02 (1).pdf20 Jul 2022
Layout approvalFile: Plan 03 (1).pdf20 Jul 2022
Layout approvalFile: Plan 04 (1).pdf20 Jul 2022
Layout approvalFile: Plan 05 (1).pdf20 Jul 2022
Layout approvalFile: Plan 06 (1).pdf20 Jul 2022
Layout approvalFile: Plan 07 (1).pdf20 Jul 2022
Layout approvalFile: Plan 08 (1).pdf20 Jul 2022
Copy of Layout Approval (in case of layout)File: Plan 01 (1).pdf20 Jul 2022
Copy of Layout Approval (in case of layout)File: Plan 02 (1).pdf20 Jul 2022
Copy of Layout Approval (in case of layout)File: Plan 03 (1).pdf20 Jul 2022
Copy of Layout Approval (in case of layout)File: Plan 04 (1).pdf20 Jul 2022
Copy of Layout Approval (in case of layout)File: Plan 05 (1).pdf20 Jul 2022
Copy of Layout Approval (in case of layout)File: Plan 06 (1).pdf20 Jul 2022
Copy of Layout Approval (in case of layout)File: Plan 07 (1).pdf20 Jul 2022
Copy of Layout Approval (in case of layout)File: Plan 08 (1).pdf20 Jul 2022

How this compares with Nashik

51%of this project is bookeddistrict median 17%
10%of Nashik projects moved their completion datethis one has not
19%of Nashik registrations have lapsed or been cancelledthis one is completed

Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.

Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SHREEJI INFINIA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Near Metro Mall4,100+ in Nashik

2 kmSHREEJI INFINIACompleted 63Lapsed / revoked 16Other 64Dot size: filed unitsN

Filed coordinates, straight-line distance. 143 registered projects within 2 km.

Builder: SHREEJI LIFE SPACE

SHREEJI LIFE SPACE has 10 registrations on MahaRERA, including SHREEJI UNIPARC and SHREEJI JAY SHANKAR TOWERS. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Nashik district page.

Frequently asked questions

What are my rights if SHREEJI INFINIA is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHREEJI INFINIA?

The registered promoter entity is SHREEJI LIFE SPACE, a partnership as per the filing. Its GSTIN 27ACVFS4150Q1Z5 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHREEJI INFINIA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SHREEJI INFINIA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHREEJI INFINIA?

The professionals named in the filing: Architect: Sumit M Kumath; Architect: Sumit Kumath; Engineer: Shailesh Dhumne; Engineer: Kishor Chopda; Chartered Accountant: Lalit Rajendra Pawar; Chartered Accountant: Piyush Verma. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHREEJI INFINIA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHREEJI INFINIA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHREEJI INFINIA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.