Home / Browse projects / Nashik, Maharashtra / JEEVAN BAUG

Registration lapsed No litigation declared Others project

JEEVAN BAUG

By DIVINE BUILDERS

RG-MH-51138 · RERA P51600022403 · Last updated on MahaRERA portal: 22 Nov 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 15 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.
Jul 2025Possession promised15 months past this date
80 of 88Construction stages doneacross 8 buildings; furthest along: Installation of Lifts, 99%
93 of 220Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 139 documents Report an error

JEEVAN BAUG is a Others project by DIVINE BUILDERS in Nashik, Maharashtra, registered with MahaRERA as P51600022403 on 19 Sep 2019. Possession was promised by 20 Jul 2025 and is now 15 months past that date. 127 of the 220 units on this registration are recorded sold or booked, and 80 of 88 construction stages are filed complete.

At a glance

Project

  • NameJEEVAN BAUG
  • TypeOthers
  • Location
    • GANGAPUR TRIMBAK LINK ROAD
    • MOTIWALA NAGAR
    • Nashik (M Corp.)
    • Nashik
    • 422222
  • Pincode422222
  • RERA no.P51600022403
  • ReraGenie IDRG-MH-51138

Builder

  • NameDIVINE BUILDERS
  • Entity typePartnership
  • PartnersNILAY ANIL SHAH, AJINKYA CHANDRAKANT BAGAD, DHANANJAY DEEPAK BAGAD, SANKET VILAS BAGAD
  • Other registrations1 more →
  • No longer live2 lapsed, de-registered or revoked

Key dates

15 months past promisethis monthRegisteredSep 2019PromisedJul 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on19 Sep 2019
  • Promised completion20 Jul 2025
  • Revised completionNone
  • Buildings8 building records
  • Documents filed139 files

Current status

58%127 of 220 units booked
100.0%Work done, per cost certificate

Figures as on 22 Nov 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING-ANA111121627
WING CNA111129029
WING DNA111130030
WING ENA101028028
WING FNA111128028
WING GNA111129029
WING HNA111122022
WING BNA111121627

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building8

As on 22 Nov 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

80 of 88 construction stages are filed complete across 8 buildings. The stage furthest along is Installation of Lifts, at 99%.

WING-A100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
WING C82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
WING D82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
WING E100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.99%
WING F100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.99%
WING G100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.99%
WING H100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.99%
WING B100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 22 Nov 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes100%

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area5,509 sq m
Land owned byThe promoter, with other names on the file
Named landownersNone

Approvals and building plan

Sanctioning authorityNashik Municipal Corporation
Permissible FSI11878.46
Proposed, not sanctioned11,878 sq m
Buildings approved8
Buildings sanctioned8

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSatpur Nashik
Estimated costRs 28.95 cr
Cost incurredRs 28.95 cr
Work done100.0%
BuildingWingEstimatedIncurred
WING-ANARs 5.70 crRs 5.70 cr
WING BNARs 5.70 crRs 5.70 cr
WING CNARs 3.12 crRs 3.12 cr
WING ENARs 3.00 crRs 3.00 cr
WING DNARs 2.64 crRs 2.64 cr
WING FNARs 2.45 crRs 2.45 cr
WING GNARs 2.44 crRs 2.44 cr
WING HNARs 2.34 crRs 2.34 cr
-NARs 1.56 crRs 1.56 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSankhala Associates
EngineerDevise Property Development Services
Chartered AccountantCA PRAVIN R RATHI
Chartered AccountantA R N R and Associates
Chartered AccountantRahul Abhaykumar Chhallani
PartnerRole in project
DIVINE BUILDERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 3 Sep 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 3 Sep 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 22 Nov 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 3 Sep 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed139

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 139 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Building plan approvalFile: 1-1 site plan.pdf22 Nov 2025
Building plan approvalFile: 1-2 ground floor.pdf22 Nov 2025
Building plan approvalFile: 1-3 first (podion).pdf22 Nov 2025
Building plan approvalFile: 4-12 WING A-B.pdf22 Nov 2025
Building plan approvalFile: 5-12 WING A-B.pdf22 Nov 2025
Building plan approvalFile: 6-12 WING A-B.pdf22 Nov 2025
Building plan approvalFile: 7-12 WING C-D.pdf22 Nov 2025
Building plan approvalFile: 8-12 WING C-D.pdf22 Nov 2025
Building plan approvalFile: 9-12 WING E+F+G+H.pdf22 Nov 2025
Building plan approvalFile: 10-12 WING E+F+G+H.pdf22 Nov 2025
Building plan approvalFile: 11-12 WING E+F+G+H.pdf22 Nov 2025
Building plan approvalFile: 12-12 WING E+F+G+H.pdf22 Nov 2025
Withdrawal Update Form 1File: Jeevan Baug Architect Certificate 25-07-25.pdf22 Nov 2025
Withdrawal Update Form 2File: Jeevan Baug Form-2 2025-26 Q2.pdf22 Nov 2025
Withdrawal Update Form 3File: Jeevan Baug Form-3 2025-26 Q2_compressed.pdf22 Nov 2025
Withdrawal Update Form 1File: Jeevan Baug Architect Certificate 2025-26 Q1.pdf13 Nov 2025
Withdrawal Update Form 2File: Jeevan Baug Form 2 Q4 2024-25.pdf13 Nov 2025
Withdrawal Update Form 3File: Jeevan Baug form 3 2025-26 Q1 Compressed.pdf13 Nov 2025
Form 1File: Jeevan Baug Architect Certificate 2024-25 Q4.pdf16 Jul 2025
Form 2File: Jeevan Baug Form 2 Q4 2024-25.pdf16 Jul 2025
Form 3File: Jeevan Baug Form 3 Q4 2024-25.pdf16 Jul 2025
Disclosure of Sold and Booked InventoryFile: Jeevan Baug Sold & Unsold Q4 2024-2025.pdf16 Jul 2025
Form 1File: Architect Certificate.pdf16 Jul 2025
Form 2File: Engineer.pdf16 Jul 2025
Form 3File: Jeevan Baug F3 2024-25 Q3 - converted.pdf16 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold.pdf16 Jul 2025
Form 1File: Form 1 Architect certificate - Sept-2024.pdf16 Jul 2025
Form 2File: Form 2.pdf16 Jul 2025
Form 3File: Divine Builder F3 Q2 2024-25 (1)_11zon.pdf16 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold.pdf16 Jul 2025
Form 1File: Form 1 Architect certificate - Jun-2024.pdf16 Jul 2025
Form 2File: Form 2.pdf16 Jul 2025
Form 3File: Divine Builder F3 Q1 2024-25 (1)_11zon.pdf16 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold.pdf16 Jul 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Jeevan Baug Form 2 Q4 2024-25.pdf23 May 2025
Other - TechnicalFile: Jeevan Baug Form 2A Q4 2024-25.pdf23 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Jeevan Baug Architect Certificate 2024-25 Q4.pdf19 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Jeevan Baug Form 3 Q4 2024-25.pdf19 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Jeevan Baug F2 24-25 Q3.pdf12 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Jeevan Baug F-2A 31-3-21.pdf12 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Divine Builders Form-2A 31-3-2022.pdf12 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Jeevan Baug F-2A 31-3-23.pdf12 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Jeevan Baug F2A 23-24.pdf12 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Jeevan Baug Architects Certificate 2024-25 Q3.pdf11 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Jeevan Baug F3 2024-25 Q3.pdf11 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Sold Unsold 24-25 Q2.pdf11 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold 23-24 Q1.pdf11 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold 24-25 Q3.pdf11 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold 24-25 Q2.pdf11 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold 24-25 Q1.pdf11 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold 23-24 Q4.pdf11 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold 23-24 Q3.pdf11 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold 23-24 Q2.pdf11 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold 22-23 Q4.pdf11 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold 22-23 Q3.pdf11 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold 22-23 Q2.pdf11 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold 22-23 Q1.pdf11 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold 21-22 Q4.pdf11 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect certificate - Mar-2024.pdf8 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect certificate - Jun-2024.pdf8 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect certificate - Sept-2024.pdf8 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Divine Builder F3 Q1 2024-25.pdf8 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Divine Builder F3 Q2 2024-25.pdf8 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate 31-03-2024.pdf8 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate 30-06-2024.pdf8 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate 30-09-2024.pdf8 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Divine Builders F5 2023-24.pdf8 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Divine Q4 23-24 Form 3 Signed_compressed.pdf13 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 (2).pdf3 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate - 30-09-2023.pdf2 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: JEEVAN BAUG F2 30-9-23.pdf2 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf2 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Jeevan Baug F3 30-9-23 - Compressed.pdf2 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed Form 3.pdf2 Feb 2024
Details of encumbrancesFile: Encumbrance Letter.pdf3 Jan 2024
CERSAI detailsFile: CERSAI_Search_Report_200292301424_For_Debtor_Based_Search_03_01_2024_15_04_17_085.pdf3 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Jeevan Baug Form - 5 31-03-2023.pdf1 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Q1 23-24.PDF26 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Q1 23-24.pdf26 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed Form 3.pdf26 Aug 2023

How this compares with Nashik

58%of this project is bookeddistrict median 17%
10%of Nashik projects moved their completion datethis one has not
19%of Nashik registrations have lapsed or been cancelledthis one is among them

Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.

Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep JEEVAN BAUG on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MOTIWALA NAGAR4,100+ in Nashik

Builder: DIVINE BUILDERS

DIVINE BUILDERS has 2 registrations on MahaRERA, including JEEVAN BAUG and Vitthal Rukmini Building. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nashik district page.

Frequently asked questions

What does it mean that JEEVAN BAUG shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if JEEVAN BAUG is delayed beyond 20 Jul 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of JEEVAN BAUG?

The registered promoter entity is DIVINE BUILDERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in JEEVAN BAUG?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for JEEVAN BAUG?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at JEEVAN BAUG?

The professionals named in the filing: Architect: Sankhala Associates; Engineer: Devise Property Development Services; Chartered Accountant: CA PRAVIN R RATHI; Chartered Accountant: A R N R and Associates; Chartered Accountant: Rahul Abhaykumar Chhallani. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in JEEVAN BAUG?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About JEEVAN BAUG. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save JEEVAN BAUG to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.