SUNFLOWER CITY
RG-MH-13784 · RERA P51600028375 · Last updated on MahaRERA portal: 23 Jun 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- All 1 earlier projects delivered on promise
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 9 other registrations and every project registered within 2 km.
See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SUNFLOWER CITY is a Others project by DEEPAK KALYANJI CHANDE in Nashik, Maharashtra, registered with MahaRERA as P51600028375 on 22 Feb 2021. Possession is promised by 30 Jun 2027. 185 of the 339 units on this registration are recorded sold or booked, and 0 of 33 construction stages are filed complete.
At a glance
Project
- NameSUNFLOWER CITY
- TypeOthers
- Location
- OPP SAMAROH LAWNS PATHARDI VADNER ROAD
- NEAR PATHARDI CIRCLE
- Nashik (M Corp.)
- Nashik
- 422010
- Pincode422010
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51600028375
- ReraGenie IDRG-MH-13784
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on22 Feb 2021
- Promised completion30 Jun 2027
- Revised completionNone
- Buildings3 building records
- Documents filed111 files
Current status
Figures as on 23 Jun 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| A WING | NA | 15 | 14 | 104 | 27 | 131 |
| WING B | NA | 15 | 14 | 104 | 0 | 104 |
| WING C | NA | 15 | 14 | 104 | 0 | 104 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building3
As on 23 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
0 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Excavation, at 50%.
A WING34%
| Activity | Progress |
|---|---|
| Excavation | 50% |
| Basement (if any) | 50% |
| Podiums (if any) | 0% |
| Plinth | 50% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 50% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 40% |
| Sanitary Fittings within the flats / premises | 20% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 50% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 30% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 30% |
WING B34%
| Activity | Progress |
|---|---|
| Excavation | 50% |
| Basement (if any) | 50% |
| Podiums (if any) | 0% |
| Plinth | 50% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 50% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 40% |
| Sanitary Fittings within the flats / premises | 20% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 50% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 30% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 30% |
WING C34%
| Activity | Progress |
|---|---|
| Excavation | 50% |
| Basement (if any) | 50% |
| Podiums (if any) | 0% |
| Plinth | 50% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 50% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 40% |
| Sanitary Fittings within the flats / premises | 20% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 50% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 30% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 30% |
Progress on shared amenities15
As on 23 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 10% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 50% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 10% |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 10% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed138
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| A WING | 1 | 45 | 46 |
| WING B | 1 | 45 | 46 |
| WING C | 1 | 45 | 46 |
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| A WING | NA | Rs 34.30 cr | Rs 17.72 cr |
| WING B | NA | Rs 34.30 cr | Rs 17.72 cr |
| WING C | NA | Rs 34.30 cr | Rs 17.72 cr |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | MUKUND BAGUL |
| Architect | Canon Designs |
| Engineer | MUKUND BAGUL |
| Chartered Accountant | CA VISHAL MUSALE |
| Chartered Accountant | CA Bhalchandra Salunke |
| Chartered Accountant | Sachin K. Mishra & Co. |
| Partner | Role in project |
|---|---|
| DEEPAK KALYANJI CHANDE | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 16 Feb 2021 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 16 Feb 2021 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 18 Feb 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 18 Feb 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 30 Jun 2027
Documents filed111
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 111 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1_Dec 2025.pdf | 23 Jun 2026 |
| Withdrawal Update Form 1File: Form 1_Mar 2026.pdf | 23 Jun 2026 |
| Withdrawal Update Form 2File: Form 2_Dec 2025.pdf | 23 Jun 2026 |
| Withdrawal Update Form 2File: Form 2_Mar 2026.pdf | 23 Jun 2026 |
| Withdrawal Update Form 3File: Form 3_Dec 2025.pdf | 23 Jun 2026 |
| Withdrawal Update Form 3File: Form 3_Mar 2026.pdf | 23 Jun 2026 |
| Withdrawal Update Form 1File: Form 1_Jun 2025.pdf | 22 Jun 2026 |
| Withdrawal Update Form 1File: Form 1_Sep 2025.pdf | 22 Jun 2026 |
| Withdrawal Update Form 2File: Form 2_Jun 2025.pdf | 22 Jun 2026 |
| Withdrawal Update Form 2File: Form 2_Sep 2025.pdf | 22 Jun 2026 |
| Withdrawal Update Form 3File: Form 3_Jun 2025.pdf | 22 Jun 2026 |
| Withdrawal Update Form 3File: Form 3_Sep 2025.pdf | 22 Jun 2026 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1) Form 1 Sunflower City March 2025.pdf | 10 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 9) Form 3 December 24 Sunflower 2024-25_11zon.pdf | 6 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 8) FORM 2 Sunflower December 2024.pdf | 5 Feb 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: 9) SunflowerCity - Form 5.pdf | 10 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 9) Form 1 Sunflower City September 2024.pdf | 7 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Q2 Sold Booked Sunflower City September 24.pdf | 25 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 5) Form 3 September 24 Sunflower 2024-25.pdf | 24 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 9) FORM 2 Sunflower September 2024.pdf | 24 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Sunflower City Form 1 Q4 23-24.pdf | 16 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Sunflower City June 2024.pdf | 16 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 1) Form 2A Sunflower City March 2024.pdf | 5 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: Q4 Sold Booked Sunflower City March 24.pdf | 5 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 8) FORM 2 Sunflower March 2024.pdf | 3 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 7) Form 3 March24 Sunflower 2023-24.pdf | 3 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Sunflower City Form 1 Q4 23-24.pdf | 10 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Sunflower Dec 23.pdf | 13 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Booked Sunflower Dec 23.pdf | 12 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Sunflower Dec 23.pdf | 12 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-SFC.pdf | 8 Jan 2024 |
| CERSAI detailsFile: CERSAI Search Report Sunflower City.pdf | 2 Dec 2023 |
| Declaration about Commencement CertificateFile: FORMAT D SUNFLOWER CITY.pdf | 27 Nov 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Anx A - Disclosure of Int - DBD.pdf | 9 Nov 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Sunflower City - Form 5.pdf | 31 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 28 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Sunflower City.pdf | 28 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM_-_3.PDF | 28 Oct 2023 |
| PAN CardFile: 1 PAN Card.pdf | 17 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - SUNFLOWER CITY.pdf | 8 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Sunflower City.pdf | 6 Jul 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Sunflower City.pdf | 6 Jul 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-Sunflower City.pdf | 6 Jul 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Sunflower City.pdf | 9 Mar 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Sunflower_City.pdf | 18 Feb 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificate Sunflower City.pdf | 10 Feb 2023 |
| Details of encumbrancesFile: Sunflower City Mortagage Deed Index II.pdf | 7 Feb 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: sunflower city 2A.pdf | 31 Jan 2023 |
| Declaration about Commencement CertificateFile: disclosure of sold unsold Inventory.pdf | 22 Apr 2022 |
| Disclosure of sold/ booked inventoryFile: declaration about commencemnt certificate_compressed.pdf | 22 Apr 2022 |
| CERSAI detailsFile: declaration.pdf | 22 Apr 2022 |
| Building plan approvalFile: scan3430.pdf | 18 Feb 2022 |
| Building plan approvalFile: scan3430.pdf | 18 Feb 2022 |
| Building plan approvalFile: scan3432.pdf | 18 Feb 2022 |
| Building plan approvalFile: scan3433.pdf | 18 Feb 2022 |
| Building plan approvalFile: scan3434.pdf | 18 Feb 2022 |
| Building plan approvalFile: scan3435.pdf | 18 Feb 2022 |
| Building plan approvalFile: scan3436.pdf | 18 Feb 2022 |
| Building plan approvalFile: scan3437.pdf | 18 Feb 2022 |
| Building plan approvalFile: scan3438.pdf | 18 Feb 2022 |
| Building plan approvalFile: scan3439.pdf | 18 Feb 2022 |
| Building plan approvalFile: scan3439.pdf | 18 Feb 2022 |
| Building plan approvalFile: scan3441.pdf | 18 Feb 2022 |
| Building plan approvalFile: scan3442.pdf | 18 Feb 2022 |
| Building plan approvalFile: scan3443.pdf | 18 Feb 2022 |
| Building plan approvalFile: scan3444.pdf | 18 Feb 2022 |
| Building plan approvalFile: scan3445.pdf | 18 Feb 2022 |
| Building plan approvalFile: scan3446.pdf | 18 Feb 2022 |
| Building plan approvalFile: scan3448.pdf | 18 Feb 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: scan3430.pdf | 18 Feb 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: scan3430.pdf | 18 Feb 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: scan3432.pdf | 18 Feb 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: scan3433.pdf | 18 Feb 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: scan3434.pdf | 18 Feb 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: scan3435.pdf | 18 Feb 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: scan3436.pdf | 18 Feb 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: scan3437.pdf | 18 Feb 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: scan3438.pdf | 18 Feb 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: scan3439.pdf | 18 Feb 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: scan3439.pdf | 18 Feb 2022 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| SAI ANAND PRIDE | SINNAR GHOTI ROAD NEAR NAVJEEVAN SCHOOL SINNAR NASHIK | 112 | Completed | Apr 2017 | Apr 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nashik
Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.
Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 9 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 111 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep SUNFLOWER CITY on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near NEAR PATHARDI CIRCLE4,100+ in Nashik
Filed coordinates, straight-line distance. 35 registered projects within 2 km.
SHREE SATYANARAYAN ROONGTA FORUM
ROONGTA HOMES LLP
LIFE 360
VELOCITY INFRA PROJECTS
ARYAN'S LIFEONE
SHREE ARYAN BUILDERS AND DEVELOPERS
Laxminarayan Heaven
Sahajanand Builders And Developers
SWASTIK MANGAL APARTMENT
SHREEMANGAL CONSTRUCTION
VRINDAVAN DHAM
RAJMUDRA CONSTRUCTIONS
See every Nashik project, with the district possession charts
Builder: DEEPAK KALYANJI CHANDE
DEEPAK KALYANJI CHANDE has 10 registrations on MahaRERA, including SAI RATAN RESIDENCY and STAR LINE. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Nashik district page.
Frequently asked questions
What are my rights if SUNFLOWER CITY is delayed beyond 30 Jun 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SUNFLOWER CITY?
The registered promoter entity is DEEPAK KALYANJI CHANDE, an individual as per the filing. Its GSTIN 27AAYPC1156H1ZK can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SUNFLOWER CITY?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SUNFLOWER CITY?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SUNFLOWER CITY?
The professionals named in the filing: Architect: MUKUND BAGUL; Architect: Canon Designs; Engineer: MUKUND BAGUL; Chartered Accountant: CA VISHAL MUSALE; Chartered Accountant: CA Bhalchandra Salunke; Chartered Accountant: Sachin K. Mishra & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SUNFLOWER CITY?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.