HARI SANSKRUTI PHASE II

By KBC GLOBAL LIMITED

RG-MH-00709 · RERA P51600000551 · Last updated on MahaRERA portal: 6 Feb 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 26 months past the filed date
  • 3 complaints at MahaRERA
  • Completion date moved by 24 months
  • 2 extensions taken
  • Rs 25.00 crore secured on the land, in favour of LIC HFL

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

6 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.
Aug 2024Possession promised26 months past this date
176 of 418Units unsoldnot recorded sold or booked
3Complaints at MahaRERAon this registration
Jump to the 117 documents Report an error

HARI SANSKRUTI PHASE II is a Residential / Group Housing project by KBC GLOBAL LIMITED in Nashik, Maharashtra, registered with MahaRERA as P51600000551 on 18 Jul 2017. Possession was promised by 28 Aug 2024 and is now 26 months past that date. The completion date has moved by 24 months from the original filing. 242 of the 418 units on this registration are recorded sold or booked. 3 complaints are on record with the regulator.

At a glance

Project

  • NameHARI SANSKRUTI PHASE II
  • TypeResidential / Group Housing
  • Location
    • Kharjurmala
    • Nashik
    • Deolaligaon
    • 422101
  • Pincode422101
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51600000551
  • ReraGenie IDRG-MH-00709

Builder

  • NameKBC GLOBAL LIMITED
  • Entity typeCompany
  • CINL45400MH2007PLC174194
  • CIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • Managing DirectorNaresh Jagumal Karda
  • Other registrations19 more →
  • Completed6 of 20
  • No longer live13 lapsed, de-registered or revoked
  • Declared earlier projects12 →

Key dates

26 months past promisethis monthRegisteredJul 2017First promiseAug 2022Revised toAug 2024

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on18 Jul 2017
  • Promised completion28 Aug 2024
  • Revised completionRevised to 28 Aug 2024 (originally 28 Aug 2022)
  • Buildings8 building records
  • Documents filed117 files

Current status

58%242 of 418 units booked

Figures as on 6 Feb 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING ANA5556056
BUILDING BNA5040040
BUILDING CNA5056056
BUILDING DNA5056056
BUILDING ENA8056056
BUILDING FNA8056056
BUILDING GNA8056056
BUILDING HNA8042042

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building8

As on 6 Feb 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

BUILDING ANot stated
ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable
BUILDING BNot stated
ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable
BUILDING CNot stated
ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable
BUILDING DNot stated
ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable
BUILDING ENot stated
ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable
BUILDING FNot stated
ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable
BUILDING GNot stated
ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable
BUILDING HNot stated
ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 6 Feb 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes20%
Water SupplyYes10%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes10%
Storm Water DrainsYes10%
Landscaping & Tree PlantingYes10%
Street LightingYes10%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes10%
Solid Waste Management And DisposalYes10%
Water conservation /Rain water harvestingYes10%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes10%
Electrical meter room, sub-station, receiving stationYes20%
Aggregate area of recreational Open SpaceYes10%
Open ParkingYes10%

Parking filed291

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots291
Closed/Covered176
Open Space115
BuildingClosed/CoveredOpen SpaceTotal
BUILDING A24933
BUILDING B24933
BUILDING C24933
BUILDING D16925
BUILDING E162036
BUILDING F242044
BUILDING G242044
BUILDING H241943

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area9,000 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofLIC HFL
Secured amountRs 25.00 crore
CERSAI search filedYes
Declared on16 Jul 2025

Approvals and building plan

Sanctioning authorityNashik Municipal Corporation
Permissible FSI13746.71
Proposed, not sanctioned6,363 sq m
Buildings approved8
Buildings sanctioned8

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShop No 10 - 18, Sai Plaza, Poona Road, Near Bytco College, Nashik Maharashtra 422214

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSUMIT KUMATH
Chartered AccountantSushil Bramecha HSB &CO
PartnerRole in project
DHARAN INFRA-EPC LIMITED-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51600012717Aug 2022 → Aug 2023

Reason as filed by the promoterDelay due to unavoidable problems

EXT51600018418Aug 2022 → Aug 2024

Reason as filed by the promoterdue to unavoidable reasons

Complaints filed with MahaRERA3

Case no.ComplainantRespondentFiled
CC001000000080354DAMODAR NAMDEO JAGTAPKARDA CONSTRUCTIONS05/09/2023
CC12601288ANITA MAHESH PADWALDHARAN INFRA-EPC LIMITED09/03/2026
CC12601796SUDHIR AVHADDHARAN INFRA-EPC LIMITED27/03/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 28 Feb 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 13 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 14 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 13 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed117

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 117 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Disclosure of sold/ booked inventoryFile: HARI SANSKRUTI PHASE II JUNE_page-0001.pdf6 Feb 2025
Disclosure of sold/ booked inventoryFile: HARI SANSKRUTI PHASE II SEPT_page-0001 (1).pdf6 Feb 2025
Disclosure of sold/ booked inventoryFile: HARI SANSKRUTI PHASE II DEC_page-0001.pdf6 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Hari Sanskruti Phase II Form 2A 300924.pdf15 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Hari Sanskruti Phase II Form 2A 301224.pdf15 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Hari Sanskruti Phase II Form 2A 300624.pdf13 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Hari Sanskruti II.pdf2 Jun 2024
Disclosure of sold/ booked inventoryFile: Hari Sanskruti II.pdf2 Jun 2024
Disclosure of sold/ booked inventoryFile: HARI SANSKRUTI PHASE II.pdf2 Jun 2024
Disclosure of sold/ booked inventoryFile: HARI SANSKRUTI PHASE II.pdf9 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Sanskruti II.pdf7 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Sanskruti II.pdf7 Feb 2024
Certificates of CA (Form 3)File: Hari sanskruti phase II.pdf7 Feb 2024
Certificates of CA (Form 3)File: Hari sanskruti phase II.pdf7 Feb 2024
Certificates of CA (Form 3)File: Sanskruti II.pdf7 Feb 2024
Certificates of CA (Form 3)File: Hari Sanskruti II.pdf7 Feb 2024
Details of encumbrances concerned to FinanceFile: Encumbrance certificate (1) (1).pdf2 Feb 2024
Details of encumbrances concerned to FinanceFile: Encumbrance certificate finance (1).pdf2 Feb 2024
Details of encumbrances concerned to LegalFile: Encumbrance certificate (1) (1).pdf2 Feb 2024
Details of encumbrances concerned to LegalFile: Encumbrance certificate finance (1).pdf2 Feb 2024
CERSAI detailsFile: CERSAI_Search_Report_200295605835_For_Asset_Based_Search_02_02_2024_19_46_55_418.pdf2 Feb 2024
Certificates of CA (Form 3)File: Hari sanskruti phase II.pdf2 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: INTEREST IN OTHER ENTITIES.pdf2 Feb 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: BANKacc sanskruti_page-0001.pdf2 Feb 2024
Deviation Report with respect to Allotment letterFile: Encumbrance certificate-model allotment letter (1).pdf2 Feb 2024
Deviation Report with respect to model copy of AgreementFile: Encumbrance certificate-model agreement (1).pdf2 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Sanskruti II.pdf30 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Sanskruti II.pdf30 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Sanskruti II.pdf30 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Sanskruti II.pdf30 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Sanskruti II.pdf30 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Sanskruti II.pdf30 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Sanskruti II.pdf30 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Sanskruti II.pdf27 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Sanskruti II.pdf27 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Sanskruti II.pdf25 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Sanskruti II.pdf25 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Sanskruti Phase II.pdf25 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect's certificate-Sanskruti II.pdf25 Jan 2024
Disclosure of sold/ booked inventoryFile: Sanskruti II.pdf23 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Hari Sanskruti Phase II.pdf20 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Hari Sanskruti -II.pdf16 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Hari Sanskruti II.pdf16 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Hari Sanskruti II.pdf16 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Sans II.pdf16 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Sanskruti II (2).pdf16 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Sanskruti II.pdf16 Jan 2024
Certificates of CA (Form 3)File: Hari Sanskruti II (2).pdf16 Jan 2024
Certificates of CA (Form 3)File: Hari Sanskruti II.pdf16 Jan 2024
Certificates of CA (Form 3)File: Hari Sanskruti -II.pdf16 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Sanskruti-II.pdf15 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Sanskruti II.pdf15 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Sanskruti II.pdf15 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: H Sanskruti II.pdf15 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Sanskruti Phase II.pdf15 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: SANSKRUTI II.pdf15 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Sanskruti-II.pdf15 Jan 2024
Certificates of CA (Form 3)File: Sanskruti-II.pdf15 Jan 2024
Certificates of CA (Form 3)File: Hari Sanskruti II.pdf15 Jan 2024
Certificates of CA (Form 3)File: Hari Sanskruti -II.pdf15 Jan 2024
Certificates of CA (Form 3)File: Hari Sanskruti II.pdf15 Jan 2024
Certificates of CA (Form 3)File: Sanskruti I Form 3 21-22.pdf15 Jan 2024
Certificates of CA (Form 3)File: Sanskruti II.pdf15 Jan 2024
Certificates of CA (Form 3)File: Hari Sanskruti II (2).pdf15 Jan 2024
Declaration in FORM BFile: sanskruti affidavit cum declaration.pdf12 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 21-22 Final.pdf10 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Hari Sanskruti Form 5 FY 22-23 final.pdf10 Jan 2024
Disclosure of sold/ booked inventoryFile: Sanskruti II.pdf11 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Sanskruti II.pdf5 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Hari Sanskruti II.pdf27 Sep 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Sanskruti II.pdf27 Sep 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Sanskruti II.pdf27 Sep 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Hari Sanskruti II.pdf27 Sep 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Sanskruti II.pdf27 Sep 2023
Disclosure of sold/ booked inventoryFile: Sanskruti II.pdf27 Sep 2023
Disclosure of sold/ booked inventoryFile: Hari Sanskruti II.pdf27 Sep 2023
Disclosure of sold/ booked inventoryFile: Hari Sanskruti II.pdf27 Sep 2023
Disclosure of sold/ booked inventoryFile: Sanskruti II.pdf27 Sep 2023
Disclosure of sold/ booked inventoryFile: Sanskruti II.pdf27 Sep 2023
Disclosure of sold/ booked inventoryFile: Sanskruti II.pdf27 Sep 2023

Promoter's earlier projects12

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise10 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Hari ShrushtiOpp IT Park Wadala Road indira Nagar Nashik 42221450CompletedJul 2015Late, Aug 2015
Hari Sneh Phase IIBehind Ashoka Universal School near IT park Nashik 42201150CompletedMay 2015Late, Jun 2015
Hari AmrutLokhande Mala Old Saikheda road Jail road Nashik 42221469CompletedJul 2014Late, Jul 2014
Hari SparshBarnes School Deolali camp Nashik-42250276CompletedMay 2014Apr 2014
Hari OmPhase INear Guru Givind Singh polytechnic college Indira Nagar Nashik 422009216CompletedOct 2013Late, Nov 2013
Hari Aangan Phase IJachak Mala Jai Bhavani Road Deolali24CompletedApr 2013Late, May 2013
Hari Sneh IBehind Ashoka universal School near IT park Nashik42201150CompletedDec 2012Sep 2012
Hari SankalpNear Serene Meadows Gangapur Road 42201337CompletedOct 2012Late, Nov 2012
Hari KunjJai Bhavani Road Nashik Road36CompletedSep 2012Late, Oct 2012
Hari Vandan Phase IINear Aarambh Maha Vidyalaya Sane Guruji nagar Jail Road Nashik 42210128CompletedAug 2012Late, Oct 2012
Hari Sankul Phase INear Ashoka Universal School behind Fame Multiplex Ashoka Marg Nashik 42200693CompletedDec 2011Late, May 2012
Hari NiwasBehind Muktidham near hotel Orange Tree Datta Mandir Nashik Road Nashik 42210193CompletedJul 2011Late, Sep 2011

How this compares with Nashik

58%of this project is bookeddistrict median 17%
10%of Nashik projects moved their completion datethis one moved by 24 months
19%of Nashik registrations have lapsed or been cancelledthis one is among them

Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.

Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep HARI SANSKRUTI PHASE II on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Nashik4,100+ in Nashik

2 kmHARI SANSKRUTI PHASE IICompleted 17Lapsed / revoked 7Other 24Dot size: filed unitsN

Filed coordinates, straight-line distance. 48 registered projects within 2 km.

Builder: KBC GLOBAL LIMITED

KBC GLOBAL LIMITED has 20 registrations on MahaRERA, including HARI SPARSH II and HARI VATIKA. Its filings disclose 12 earlier MahaRERA projects: declares 2 of 12 past projects completed on time. Read the full track record. See more projects on the Nashik district page.

Frequently asked questions

What does it mean that HARI SANSKRUTI PHASE II shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if HARI SANSKRUTI PHASE II is delayed beyond 28 Aug 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of HARI SANSKRUTI PHASE II?

The registered promoter entity is KBC GLOBAL LIMITED, a company as per the filing. Its CIN L45400MH2007PLC174194 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in HARI SANSKRUTI PHASE II?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against HARI SANSKRUTI PHASE II?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for HARI SANSKRUTI PHASE II?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at HARI SANSKRUTI PHASE II?

The professionals named in the filing: Architect: SUMIT KUMATH; Chartered Accountant: Sushil Bramecha HSB &CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in HARI SANSKRUTI PHASE II?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About HARI SANSKRUTI PHASE II. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save HARI SANSKRUTI PHASE II to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.