ReraGenieLog inGet a buyer report

Home / Browse projects / Nashik, Maharashtra / NATHSEETA YEOLEKAR COMPLEX

Registered No litigation declared Commercial project

NATHSEETA YEOLEKAR COMPLEX

By DEEPAK INFRA AND HOMES PRIVATE LIMITED

RG-MH-14098 · RERA P51600030928 · Last updated on MahaRERA portal: 22 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 6 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedno revision filed
6 of 11Construction stages donefurthest along: Sanitary Fittings within the flats /..., 80%
127 of 204Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 81 documents Report an error

NATHSEETA YEOLEKAR COMPLEX is a Commercial project by DEEPAK INFRA AND HOMES PRIVATE LIMITED in Nashik, Maharashtra, registered with MahaRERA as P51600030928 on 29 Sep 2021. Possession is promised by 31 Dec 2028. 77 of the 204 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete.

At a glance

Project

  • NameNATHSEETA YEOLEKAR COMPLEX
  • TypeCommercial
  • Location
    • COLLEGE ROAD
    • BEHIND EASY DAY MALL
    • Nashik (M Corp.)
    • Nashik
    • 422005
  • Pincode422005
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51600030928
  • ReraGenie IDRG-MH-14098

Builder

  • NameDEEPAK INFRA AND HOMES PRIVATE LIMITED
  • Entity typeCompany
  • CINU45309MH2021PTC354411
  • GSTIN27AAICD2895D1ZI
  • CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • Managing DirectorDEEPAK KALYANJI CHANDE
  • DirectorSHUBH DEEPAK CHANDE
  • Other registrations6 more →
  • Declared earlier projects5 →

Key dates

this monthRegisteredSep 2021PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on29 Sep 2021
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed81 files

Current status

38%77 of 204 units booked
72.7%Work done, per cost certificate

Figures as on 22 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
NATHSEETA YEOLEKAR COMMERCIAL TOWERNA1310204204

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 22 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 80%.

NATHSEETA YEOLEKAR COMMERCIAL TOWER: 75% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.70%

Progress on shared amenities15

As on 22 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes80%
Landscaping & Tree PlantingYes80%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership9

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,606 sq m
Land owned byThe promoter, with other names on the file
Named landowners9
LandownerVillageDistrict
RAMESH NATHUJI YEOLENashikNashik
SURESH NATHUJI YEOLENashikNashik
SAMBHAJI NATHUJI YEOLENashikNashik
RAJABHAU NATHUJI YEOLENashikNashik
MEERABAI TANAJI YEOLENashikNashik
SUNANDA BAJIRAO BARKALEAgas KhindNashik
MANISHA TANAJI YEOLENashikNashik
SONALI ANIL JACHAKNashik RoadNashik
SHEETAL NITIN KHAIRNARNashikNashik

Approvals and building plan

Sanctioning authorityNashik Municipal Corporation
Permissible FSI14835.73
Proposed, not sanctioned3,943 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHINGADA TALAV
Estimated costRs 35.59 cr
Cost incurredRs 25.89 cr
Work done72.74%
BuildingWingEstimatedIncurred
NATHSEETA YEOLEKAR COMMERCIAL TOWERNARs 35.59 crRs 25.89 cr

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDHIRAJ WALUNJ
EngineerMUKUND BAGUL
EngineerRELIABLE CONSULTANAT
Chartered AccountantVISHAL MUSALE
Chartered AccountantBHALCHANDRA RAJENDRA SALUNKE
Chartered AccountantSachin K Mishra & Co
Chartered AccountantR H Pothiwal & Associates
PartnerRole in project
DEEPAK INFRA AND HOMES PRIVATE LIMITED-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 27 Aug 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 27 Aug 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 27 Aug 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 11 Sep 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed81

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 81 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form1_Mar 2026.pdf22 Jun 2026
Withdrawal Update Form 2File: Form2_Mar 2026.pdf22 Jun 2026
Withdrawal Update Form 3File: Form 3_Mar 2026.pdf22 Jun 2026
Form 2A (FY 2023-2024)File: FORM 2A - MAR 24-25.pdf7 Apr 2026
Form 2A (FY 2024-2025)File: FORM 2A - MAR 2025.pdf7 Apr 2026
Form 5 (FY 2024-2025)File: RERA Audit Report 24-25 Nathseeta.pdf7 Apr 2026
Form 1File: FORM 1 - MAR 25.pdf3 Apr 2026
Form 2File: FORM 2 - Mar 25.pdf3 Apr 2026
Form 3File: CA Certificate_NathSeeta_Mar 25.pdf3 Apr 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold booked Inventory Mar 25.pdf3 Apr 2026
Withdrawal Update Form 1File: FORM 1 - JUNE 25.pdf3 Apr 2026
Withdrawal Update Form 1File: FORM 1 - JUNE 25.pdf3 Apr 2026
Withdrawal Update Form 1File: FORM 1 - SEP 25.pdf3 Apr 2026
Withdrawal Update Form 1File: FORM 1 - SEP 25.pdf3 Apr 2026
Withdrawal Update Form 1File: FORM 1 - DEC 25.pdf3 Apr 2026
Withdrawal Update Form 2File: FORM 2 - JUNE 25.pdf3 Apr 2026
Withdrawal Update Form 2File: FORM 2 - Jun 25.pdf3 Apr 2026
Withdrawal Update Form 2File: FORM 2 - Sep 25.pdf3 Apr 2026
Withdrawal Update Form 2File: FORM 2 - Sep 25.pdf3 Apr 2026
Withdrawal Update Form 2File: FORM 2 - Dec 25.pdf3 Apr 2026
Withdrawal Update Form 3File: CA Certificate_NathSeeta_Jun 25.pdf3 Apr 2026
Withdrawal Update Form 3File: CA Certificate_NathSeeta_Jun 25.pdf3 Apr 2026
Withdrawal Update Form 3File: CA Certificate_NathSeeta_Sep 25.pdf3 Apr 2026
Withdrawal Update Form 3File: CA Certificate_NathSeeta_Sep 25.pdf3 Apr 2026
Withdrawal Update Form 3File: CA Certificate_NathSeeta_Dec 25.pdf3 Apr 2026
Withdrawal Update Form 1File: 2) Form 1 Nathseeta Sept 2025.pdf23 Dec 2025
Withdrawal Update Form 2File: 5) FORM 2 Nathseeta September 2025.pdf23 Dec 2025
Withdrawal Update Form 3File: 5) Form 3 Sep 25 NathSeeta 2025-26.pdf23 Dec 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 4) Form 1 Nathseeta March 2025.pdf10 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2) Form 3 December 24 NathSeeta 2024-25_11zon.pdf6 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 4) FORM 2 Nathseeta December 2024.pdf6 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: 1) NathSeeta - Form 5.pdf10 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1) Form 1 Nathseeta December 2024.pdf9 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 6) Form 1 Nathseeta September 2024.pdf26 Dec 2024
Disclosure of sold/ booked inventoryFile: Q2 Sold Booked Nathseeta September 24.pdf25 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 NSY.pdf29 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 NSY.pdf29 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 2) Form 2A Nathseeta March 2024.pdf5 Jul 2024
Disclosure of sold/ booked inventoryFile: Q4 Sold Booked Nathseeta March 24.pdf5 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 6) FORM 2 Nathseeta March 2024.pdf3 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2) Form 3 March24 Nathseeta 2023-24.pdf3 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Nathseeta Yeolekar Form 1 Q4 23-24.pdf10 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Nathseeta Dec 23.pdf15 Jan 2024
Disclosure of sold/ booked inventoryFile: Sold Booked Nathseeta Dec 23.pdf15 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Nathseeta Dec 23.pdf15 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1- NSY.pdf8 Jan 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Anx A - Disclosure of Int - DIHPL-DKC.pdf9 Nov 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Anx A - Disclosure of Int - DIHPL-SDC.pdf9 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: N S Yeolekar - Form 5.pdf31 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form_1_NS_Yeolekar.pdf28 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 NS Yeolekar Complex.pdf28 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: NS Yeolekar Form 3_11zon.pdf28 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - YEOLEKAR.pdf8 Jul 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: form 5.pdf17 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificate Yeolekar.pdf10 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Image_001.pdf31 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: n s yeolekar form 2A.pdf31 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 - NATH SEETA.pdf24 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 N S YEOLEKAR.pdf20 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A N S YEOLEKAR.pdf20 Jan 2023
PAN CardFile: PAN - DEEPAK INFRA AND HOMES PRIVATE LIMITED.pdf23 Sep 2021
Details of encumbrancesFile: Encumbrances.pdf11 Sep 2021
Commencement Certificates / NA Order for plotted developmentFile: commencemet 725.pdf11 Sep 2021
Declaration in FORM BFile: Deepak Chande.pdf11 Sep 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ca c_compressed.pdf11 Sep 2021
Layout approvalFile: scan1674.pdf27 Aug 2021
Building plan approvalFile: scan1675.pdf27 Aug 2021
Building plan approvalFile: scan1676.pdf27 Aug 2021
Building plan approvalFile: scan1677.pdf27 Aug 2021
Building plan approvalFile: scan1678.pdf27 Aug 2021
Building plan approvalFile: scan1674.pdf27 Aug 2021
Copy of the legal title reportFile: Adobe Scan Sep 25, 2021_compressed.pdf27 Aug 2021
Copy of Layout Approval (in case of layout)File: scan1674.pdf27 Aug 2021
Building Plan Approval / NA Order for plotted developmentFile: scan1675.pdf27 Aug 2021
Building Plan Approval / NA Order for plotted developmentFile: scan1676.pdf27 Aug 2021
Building Plan Approval / NA Order for plotted developmentFile: scan1677.pdf27 Aug 2021
Building Plan Approval / NA Order for plotted developmentFile: scan1678.pdf27 Aug 2021
Building Plan Approval / NA Order for plotted developmentFile: scan1674.pdf27 Aug 2021
Declaration about Commencement CertificateFile: COMMENCEMENT dECLEARTION.pdf27 Aug 2021
Declaration about Commencement CertificateFile: DA 022.pdf27 Aug 2021

Promoter's earlier projects4

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

4 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
THREE LEAVES PHASE THREEP51600077479GOVIND NAGAR NASHIK, Nashik48Aug 2024OngoingDec 2030Not due yet
THREE LEAVES PHASE ONEP51600047728GOVIND NAGAR, Nashik256Nov 2022OngoingDec 2030Not due yet
STAR APEXP51600080393GOVIND NAGAR, Nashik119Jun 2025OngoingDec 2030Not due yet
AMRAPALIP51600054225Nashik, Nashik29Jan 2024OngoingNov 2027Not due yet

How this compares with Nashik

38%of this project is bookeddistrict median 17%
10%of Nashik projects moved their completion datethis one has not
19%of Nashik registrations have lapsed or been cancelledthis one is on the register

Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.

Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep NATHSEETA YEOLEKAR COMPLEX on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BEHIND EASY DAY MALL4,100+ in Nashik

2 kmNATHSEETA YEOLEKAR COMPLCompleted 58Lapsed / revoked 14Other 66Dot size: filed unitsN

Filed coordinates, straight-line distance. 138 registered projects within 2 km.

Builder: DEEPAK INFRA AND HOMES PRIVATE LIMITED

DEEPAK INFRA AND HOMES PRIVATE LIMITED has 7 registrations on MahaRERA, including NATHSEETA YEOLEKAR COMPLEX and RADHA NAGARI. Its filings disclose 5 earlier MahaRERA projects, none completed yet. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Nashik district page.

Frequently asked questions

What are my rights if NATHSEETA YEOLEKAR COMPLEX is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of NATHSEETA YEOLEKAR COMPLEX?

The registered promoter entity is DEEPAK INFRA AND HOMES PRIVATE LIMITED, a company as per the filing. Its CIN U45309MH2021PTC354411 and GSTIN 27AAICD2895D1ZI can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in NATHSEETA YEOLEKAR COMPLEX?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for NATHSEETA YEOLEKAR COMPLEX?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at NATHSEETA YEOLEKAR COMPLEX?

The professionals named in the filing: Architect: DHIRAJ WALUNJ; Engineer: MUKUND BAGUL; Engineer: RELIABLE CONSULTANAT; Chartered Accountant: VISHAL MUSALE; Chartered Accountant: BHALCHANDRA RAJENDRA SALUNKE; Chartered Accountant: Sachin K Mishra & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in NATHSEETA YEOLEKAR COMPLEX?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About NATHSEETA YEOLEKAR COMPLEX. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save NATHSEETA YEOLEKAR COMPLEX to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.