Registered No litigation declared Others project

ARRPAN HOUSING

By A C JAIN BUILDERS AND DEVELOPERS LLP

RG-MH-47602 · RERA P51600022627 · Last updated on MahaRERA portal: 8 Sep 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 19 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.
Nov 2026Possession promisedmoved 19 months from the original
45 of 55Construction stages doneacross 5 buildings; furthest along: Basement (if any), 0%
137 of 415Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 257 documents Report an error

ARRPAN HOUSING is a Others project by A C JAIN BUILDERS AND DEVELOPERS LLP in Nashik, Maharashtra, registered with MahaRERA as P51600022627 on 9 Oct 2019. Possession is promised by 19 Nov 2026. The completion date has moved by 19 months from the original filing. 278 of the 415 units on this registration are recorded sold or booked, and 45 of 55 construction stages are filed complete.

At a glance

Project

  • NameARRPAN HOUSING
  • TypeOthers
  • Location
    • ARRPAN HOUSING VADNER VIHITGAON ROAD OPP TALATHI OFFICE VIHITGAON NASIKROAD
    • VIHITGAON
    • Nashik
    • 422101
  • Pincode422101
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51600022627
  • ReraGenie IDRG-MH-47602

Builder

  • NameA C JAIN BUILDERS AND DEVELOPERS LLP
  • Entity typePartnership
  • GSTIN27ABOFA9179M1ZH
  • PartnerVIDHYA ABHAY JAIN TODARWAL
  • Other registrations7 more →
  • Completed3 of 8
  • Past their filed date1
  • Declared earlier projects11 →

Key dates

this monthRegisteredOct 2019First promiseApr 2025Revised toNov 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on9 Oct 2019
  • Promised completion19 Nov 2026
  • Revised completionRevised to 19 Nov 2026 (originally 17 Apr 2025)
  • Buildings5 building records
  • Documents filed257 files

Current status

67%278 of 415 units booked
99.2%Work done, per cost certificate

Figures as on 8 Sep 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ARRPAN HOUSING - B BUILDING - A, B AND C WINGNA8784589
ARRPAN HOUSING - A BUILDING - A,B AND C WINGSNA878418102
ARRPAN HOUSING- D BUILDING- A,B AND C WINGNA8784084
ARRPAN HOUSING - C BUILDING - A, B AND C WINGNA8784084
ARRPAN HOUSING - E BUILDING - A AND B WING MHADA NA8756056

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building5

As on 8 Sep 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

45 of 55 construction stages are filed complete across 5 buildings. The stage furthest along is Basement (if any), at 0%.

ARRPAN HOUSING - B BUILDING - A, B AND C WING82%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
ARRPAN HOUSING - A BUILDING - A,B AND C WINGS82%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
ARRPAN HOUSING- D BUILDING- A,B AND C WING82%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
ARRPAN HOUSING - C BUILDING - A, B AND C WING82%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
ARRPAN HOUSING - E BUILDING - A AND B WING MHADA82%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 8 Sep 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%

Parking filed171

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots171
Closed/Covered96
Open Space75
BuildingClosed/CoveredOpen SpaceTotal
ARRPAN HOUSING - B BUILDING - A, B AND C WING201939
ARRPAN HOUSING - A BUILDING - A,B AND C WINGS121325
ARRPAN HOUSING- D BUILDING- A,B AND C WING241337
ARRPAN HOUSING - C BUILDING - A, B AND C WING242044
ARRPAN HOUSING - E BUILDING - A AND B WING MHADA161026

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area10,645 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on20 Aug 2026
LandownerVillageDistrict
DILIP KACHARDAS SANKLECHAVIHITGAONNashik

Approvals and building plan

Sanctioning authorityNashik Municipal Corporation
Permissible FSI18054.49
Proposed, not sanctioned18,054 sq m
Buildings approved5
Buildings sanctioned5

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchJAI BHAVANI ROAD, NASIKROAD
Estimated costRs 38.75 cr
Cost incurredRs 38.45 cr
Work done99.23%
BuildingWingEstimatedIncurred
ARRPAN HOUSING - B BUILDING - A, B AND C WINGNARs 7.75 crRs 7.69 cr
ARRPAN HOUSING - A BUILDING - A,B AND C WINGSNARs 7.75 crRs 7.69 cr
ARRPAN HOUSING- D BUILDING- A,B AND C WINGNARs 7.75 crRs 7.69 cr
ARRPAN HOUSING - C BUILDING - A, B AND C WINGNARs 7.75 crRs 7.69 cr
ARRPAN HOUSING - E BUILDING - A AND B WING MHADANARs 7.75 crRs 7.69 cr

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectNIKI ASSOCIATES
EngineerBAFNA NARESH ISHWARLAL
EngineerMILIND SHYAMSUNDER RATHI
Chartered AccountantKPN AND CO
Chartered AccountantRSPH & Associates
Chartered AccountantPratik D Jain & Associates
Chartered AccountantCA Suchita R Pawar
PartnerRole in project
A C JAIN BUILDERS AND DEVELOPERS LLP-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA20082622285Apr 2025 → Nov 2026

Reason as filed by the promoterThe project has been completed, and the extension is being sought to facilitate necessary corrections and updates in the application. Upon completion of the required corrections, the application will be updated accordingly, following which the completion update will be submitted.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 28 Sep 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 28 Sep 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 1 Jan 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 28 Sep 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 5 Jun 2024

Documents filed257

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 257 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: AR-Certificate.pdf8 Sep 2026
Withdrawal Update Form 1File: AR-Certificate.pdf8 Sep 2026
Withdrawal Update Form 1File: AR-Certificate.pdf8 Sep 2026
Withdrawal Update Form 1File: AR-Certificate.pdf8 Sep 2026
Withdrawal Update Form 2File: ER Certificate.pdf8 Sep 2026
Withdrawal Update Form 2File: ER Certificate.pdf8 Sep 2026
Withdrawal Update Form 2File: ER Certificate.pdf8 Sep 2026
Withdrawal Update Form 2File: ER Certificate.pdf8 Sep 2026
Withdrawal Update Form 3File: CA Certificate.pdf8 Sep 2026
Withdrawal Update Form 3File: CA Certificate.pdf8 Sep 2026
Withdrawal Update Form 3File: CA Certificate.pdf8 Sep 2026
Withdrawal Update Form 3File: CA Certificate.pdf8 Sep 2026
Form 1File: 1 Architect Certificate March 20.pdf20 Aug 2026
Form 2File: 1 Engineer Certificate March 20.pdf20 Aug 2026
Form 3File: 1 CA Cert March 20.pdf20 Aug 2026
Disclosure of Sold and Booked InventoryFile: 1 Disclosure.pdf20 Aug 2026
Form 1File: 2 Architect Certificate March 21.pdf20 Aug 2026
Form 2File: 2 Engineer Certificate March 21.pdf20 Aug 2026
Form 3File: 2 CA Cert March 21.pdf20 Aug 2026
Disclosure of Sold and Booked InventoryFile: Disclosure.pdf20 Aug 2026
Form 1File: 3 Architect Certificate Jun 21.pdf20 Aug 2026
Form 2File: 3 Engineer Certificate June 21.pdf20 Aug 2026
Form 3File: 3 CA Cert June 21.pdf20 Aug 2026
Disclosure of Sold and Booked InventoryFile: Disclosure.pdf20 Aug 2026
Form 1File: 4 Architect Certificate Sept 21.pdf20 Aug 2026
Form 2File: 4 Engineer Certificate Sept 21.pdf20 Aug 2026
Form 3File: 4 CA Cert Sept 21.pdf20 Aug 2026
Disclosure of Sold and Booked InventoryFile: Disclosure.pdf20 Aug 2026
Form 1File: 5 Architect Certificate Dec 21.pdf20 Aug 2026
Form 2File: 5 Engineer Certificate Dec 21.pdf20 Aug 2026
Form 3File: 5 CA Cert Dec 21.pdf20 Aug 2026
Disclosure of Sold and Booked InventoryFile: Disclosure.pdf20 Aug 2026
Form 1File: 6 Architect Certificate March 22.pdf20 Aug 2026
Form 2File: 6 Engineer Certificate March 22.pdf20 Aug 2026
Form 3File: 6 CA Cert March 22.pdf20 Aug 2026
Disclosure of Sold and Booked InventoryFile: Disclosure.pdf20 Aug 2026
Form 1File: 7 Architect Certificate Jun 22.pdf20 Aug 2026
Form 2File: 7 Engineer Certificate June 22.pdf20 Aug 2026
Form 3File: 7 CA Cert June 22.pdf20 Aug 2026
Disclosure of Sold and Booked InventoryFile: Disclosure.pdf20 Aug 2026
Form 1File: 8 Architect Certificate Sept 22.pdf20 Aug 2026
Form 2File: 8 Engineer Certificate Sept 22.pdf20 Aug 2026
Form 3File: 8 CA Cert Sept22.pdf20 Aug 2026
Disclosure of Sold and Booked InventoryFile: Disclosure.pdf20 Aug 2026
Form 1File: 9 Architect Certificate Dec 22.pdf20 Aug 2026
Form 2File: 9 Engineer Certificate Dec 22.pdf20 Aug 2026
Form 3File: 9 CA Cert Dec 22.pdf20 Aug 2026
Disclosure of Sold and Booked InventoryFile: Disclosure.pdf20 Aug 2026
Form 1File: 10 Architect Certificate March 23.pdf20 Aug 2026
Form 2File: 10 Engineer Certificate March 23.pdf20 Aug 2026
Form 3File: CA March 23.pdf20 Aug 2026
Disclosure of Sold and Booked InventoryFile: 2 Disclosure March 23.pdf20 Aug 2026
Form 1File: 11 Architect Certificate June 23.pdf20 Aug 2026
Form 2File: 11 Engineer Certificate June 23.pdf20 Aug 2026
Form 3File: 11 CA Cert June 23.pdf20 Aug 2026
Disclosure of Sold and Booked InventoryFile: Disclosure.pdf20 Aug 2026
Form 1File: 12 Architect Certificate Sept 23.pdf20 Aug 2026
Form 2File: 12 Engineer Certificate Sept 23.pdf20 Aug 2026
Form 3File: 12 CA Cert Sept 23.pdf20 Aug 2026
Disclosure of Sold and Booked InventoryFile: 3 Disclosure Sept 23.pdf20 Aug 2026
Form 1File: 13 Architect Certificate Dec 23.pdf20 Aug 2026
Form 2File: 13 Engineer Certificate Dec 23.pdf20 Aug 2026
Form 3File: 13 CA Cert Dec 23.pdf20 Aug 2026
Disclosure of Sold and Booked InventoryFile: 4 Disclosure Dec 23.pdf20 Aug 2026
Form 1File: 14 Architect Certificate March 24.pdf20 Aug 2026
Form 2File: 14 Engineer Certificate March 24.pdf20 Aug 2026
Form 3File: 14 CA Cert March 24.pdf20 Aug 2026
Disclosure of Sold and Booked InventoryFile: 5 Disclosure March 24.pdf20 Aug 2026
Form 1File: AR-June 2024.pdf20 Aug 2026
Form 2File: ER-June 24.pdf20 Aug 2026
Form 3File: CA-June 24.pdf20 Aug 2026
Disclosure of Sold and Booked InventoryFile: 6 Disclosure Jun 24.pdf20 Aug 2026
Form 1File: 1 Architect Certificate March 20.pdf20 Aug 2026
Form 2File: 1 Engineer Certificate March 20.pdf20 Aug 2026
Form 3File: 1 CA Cert March 20.pdf20 Aug 2026
Disclosure of Sold and Booked InventoryFile: 1 Disclosure.pdf20 Aug 2026
Form 1File: 2 Architect Certificate March 21.pdf20 Aug 2026
Form 2File: 2 Engineer Certificate March 21.pdf20 Aug 2026
Form 3File: 2 CA Cert March 21.pdf20 Aug 2026
Disclosure of Sold and Booked InventoryFile: Disclosure.pdf20 Aug 2026

Promoter's earlier projects10

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

8 delivered on promise2 delivered late
ProjectLocationFlatsStatusPromisedDelivered
AbhinavS. No. G. No. 87 1 2 11 3 of Deolali Shiwar Nashik - 42210178OngoingDec 2026Dec 2026
AARADHYA RESIDENCY PHASE IIS NO 31 2 1 19 Nashik Maharashtra63OngoingDec 2026Dec 2026
ARADHANA ENCLAVES NO 40 8 9 10 PLOT NO 4 Nashik Maharashtra14OngoingDec 2025Dec 2025
AARADHANA RESIDENCY - AS no - 39 6 40 6 7 2 3 - Plot No 25 to 46 Nashik Maharashtra84CompletedDec 2022Dec 2022
AARADHANA RESIDENCY - BS NO - 39 6 40 6 7 2 3 PLOT NO 62 65 Nashik Maharashtra16CompletedDec 2022Dec 2022
AARADHANA VILLAS39 6 40 6 7 2 3 Nashik Maharashtra13CompletedDec 2020Dec 2020
ABHINANDAN HEIGHTSANUSAYA NAGAR NEAR MHADA BUILDINGS MAKHMALABAD NASIK48CompletedJun 2019Late, Jul 2019
KAPALESHWAR CO OP HSG SOCIETYOPP SURANA HOSPITAL ARTILLERY CENTER ROAD NASIKROAD38CompletedMar 2019Mar 2019
AARADHYA RESIDENCYA WING OPP JADHAV HOSPITAL JAGTAP MALA ANAND NAGAR NASIKROAD45CompletedJun 2018May 2018
AANUSHREE RESIDENCYPLOT NO 1 TO 8 BEHIND KAMAL AUTO ASHOKA MARG OPP ASHOKA SCHOOL NASIK53CompletedMar 2018Late, May 2018

How this compares with Nashik

67%of this project is bookeddistrict median 17%
10%of Nashik projects moved their completion datethis one moved by 19 months
19%of Nashik registrations have lapsed or been cancelledthis one is on the register

Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.

Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ARRPAN HOUSING on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near VIHITGAON4,100+ in Nashik

2 kmARRPAN HOUSINGCompleted 23Lapsed / revoked 11Other 25Dot size: filed unitsN

Filed coordinates, straight-line distance. 59 registered projects within 2 km.

Builder: A C JAIN BUILDERS AND DEVELOPERS LLP

A C JAIN BUILDERS AND DEVELOPERS LLP has 8 registrations on MahaRERA, including ARRPAN HOUSING and AARADHANA RESIDENCY - A. Its filings disclose 11 earlier MahaRERA projects: declares 9 of 11 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Nashik district page.

Frequently asked questions

What are my rights if ARRPAN HOUSING is delayed beyond 19 Nov 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ARRPAN HOUSING?

The registered promoter entity is A C JAIN BUILDERS AND DEVELOPERS LLP, a partnership as per the filing. Its GSTIN 27ABOFA9179M1ZH can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ARRPAN HOUSING?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ARRPAN HOUSING?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ARRPAN HOUSING?

The professionals named in the filing: Architect: NIKI ASSOCIATES; Engineer: BAFNA NARESH ISHWARLAL; Engineer: MILIND SHYAMSUNDER RATHI; Chartered Accountant: KPN AND CO; Chartered Accountant: RSPH & Associates; Chartered Accountant: Pratik D Jain & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ARRPAN HOUSING?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ARRPAN HOUSING. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ARRPAN HOUSING to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.