Home / Browse projects / Nashik, Maharashtra / SHREEJI EXCELENCIA

Completed No litigation declared Others project

SHREEJI EXCELENCIA

By SHREEJI DEVELOPERS

RG-MH-13629 · RERA P51600026697 · Last updated on MahaRERA portal: 16 Oct 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 26 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.
Jun 2028Possession promisedregistration recorded completed
33 of 33Construction stages doneacross 3 buildings; every applicable stage filed complete
68 of 356Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 263 documents Report an error

SHREEJI EXCELENCIA is a Others project by SHREEJI DEVELOPERS in Nashik, Maharashtra, registered with MahaRERA as P51600026697 on 21 Oct 2020. The registration is recorded completed; possession was promised by 30 Jun 2028. 288 of the 356 units on this registration are recorded sold or booked, and 33 of 33 construction stages are filed complete.

At a glance

Project

  • NameSHREEJI EXCELENCIA
  • TypeOthers
  • Location
    • GANGAPUR ROAD
    • SERENE MEADOWS
    • Aanandwali
    • Nashik
    • 422005
  • Pincode422005
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51600026697
  • ReraGenie IDRG-MH-13629

Builder

  • NameSHREEJI DEVELOPERS
  • Entity typePartnership
  • GSTIN27AAIFV9174C1ZU
  • PartnersANJAN HASMUKHBHAI BHALODIYA, SWATI ANJAN BHALODIYA, MADHUBEN HASMUKHBHAI BHALODIA
  • Other registrations26 more →
  • Completed11 of 27
  • No longer live4 lapsed, de-registered or revoked
  • Past their filed date1
  • Declared earlier projects7 →

Key dates

this monthRegisteredOct 2020PromisedJun 2028Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on21 Oct 2020
  • Promised completion30 Jun 2028
  • Revised completionNone
  • Buildings3 building records
  • Documents filed263 files

Current status

81%288 of 356 units booked
74.0%Work done, per cost certificate

Figures as on 16 Oct 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SHREEJI EXCELENCIA WING BNA23211170117
SHREEJI EXCELENCIA WING CNA23211170117
SHREEJI EXCELENCIA COMMERCIALNA330122122

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 16 Oct 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

33 of 33 construction stages are filed complete across 3 buildings.

SHREEJI EXCELENCIA WING B100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
SHREEJI EXCELENCIA WING C100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
SHREEJI EXCELENCIA COMMERCIAL100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 16 Oct 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed1292

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1,292
Closed/Covered748
Open Space544
BuildingClosed/CoveredOpen SpaceTotal
SHREEJI EXCELENCIA WING B5640564
SHREEJI EXCELENCIA WING C1840184
SHREEJI EXCELENCIA COMMERCIAL0544544

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area14,173 sq m
Land owned byNot the promoter
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on23 Sep 2024
LandownerVillageDistrict
RATHI SHREYAS VIJAYSatpurNashik

Approvals and building plan

Sanctioning authorityNashik Municipal Corporation
Permissible FSI32228.47
Proposed, not sanctioned32,228 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMALPANI PRIDE, NEW PANDIT COLONY, OFF SHARANPUR ROAD, NASHIK
Estimated costRs 94.78 cr
Cost incurredRs 70.18 cr
Work done74.05%
BuildingWingEstimatedIncurred
SHREEJI EXCELENCIA WING CNARs 37.16 crRs 27.52 cr
SHREEJI EXCELENCIA WING BNARs 31.96 crRs 23.67 cr
SHREEJI EXCELENCIA COMMERCIALNARs 25.65 crRs 19.00 cr

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSUMIT MOHANLAL KUMATH
ArchitectSumit Kumath
EngineerSHAILESH DHUMNE
EngineerKishor Chopda
Chartered AccountantCA PIYUSH MAHESH SANT
Chartered AccountantCA PIYUSH VERMA
Chartered AccountantAnil Dahiya
PartnerRole in project
SHREEJI DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 15 Oct 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 26 Jul 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 26 Jul 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 26 Jul 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed263

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 263 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupational CertificateFile: Completion Certificate 01092025.pdf16 Oct 2025
Form 2A (FY 2020-2021)File: Form 2A 2021.pdf25 Sep 2025
Form 2A (FY 2021-2022)File: Form 2A 2022.pdf25 Sep 2025
Form 2A (FY 2022-2023)File: Form 2A 2023.pdf25 Sep 2025
Form 2A (FY 2023-2024)File: Form 2A 2024.pdf25 Sep 2025
Form 2A (FY 2024-2025)File: Form 2A 2025.pdf25 Sep 2025
Form 5 (FY 2020-2021)File: Annual Audit Report of Statutory CA (Form 5) (FY 2020-21).pdf25 Sep 2025
Form 5 (FY 2021-2022)File: Annual Audit Report of Statutory CA (Form 5) (FY 2021-22).pdf25 Sep 2025
Form 5 (FY 2022-2023)File: Annual Audit Report of Statutory CA (Form 5) (FY 2022-23).pdf25 Sep 2025
Form 5 (FY 2023-2024)File: Annual Audit Report of Statutory CA (Form 5) (FY 2023-24).pdf25 Sep 2025
Withdrawal Update Form 1File: Form 1 Excelencia for RERA.pdf15 Jul 2025
Withdrawal Update Form 2File: Form 2 Shreeji Excelencia_0001.pdf15 Jul 2025
Withdrawal Update Form 3File: Form 3 Excelencia for Rera_0001.pdf15 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: From1 Shreeji Excelencia.pdf16 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 Shreeji Excelencia 31012025_compressed_compressed.pdf8 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Shreeji Excelencia 31012025.pdf8 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Shreeji Excelencia Form 5.pdf5 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q3.pdf9 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q3_compressed.pdf9 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q3.pdf9 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Shreeji Excelencia_compressed.pdf12 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Shreeji Excelencia.pdf12 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Excelencia Q2.pdf16 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 Shreeji Excelencia-Q1_.pdf14 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Shreeji Excelencia Q1 24-25.pdf14 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q1 Shreeji Excelencia.pdf29 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Shreeji Excelencia Form 2 31032024 Q4.pdf5 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Shreeji Excelencia Form 3 31032024 Q4_compressed.pdf5 Jul 2024
Status of ConveyanceFile: Declaration of Apartment Residencial BWing1.pdf5 Jul 2024
Status of ConveyanceFile: Declaration of Apartment Residencial BWing2.pdf5 Jul 2024
Status of ConveyanceFile: Declaration of Apartment CWing1.pdf5 Jul 2024
Status of ConveyanceFile: Declaration of Apartment CWing2.pdf5 Jul 2024
Status of ConveyanceFile: Apartment Declaration DWing1.pdf5 Jul 2024
Status of ConveyanceFile: Apartment Declaration DWing2.pdf5 Jul 2024
Status of ConveyanceFile: Correction Declaration DWing3.pdf5 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Shreeji Excelencia Form 1 29022024.pdf20 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Shreeji Excelencia Form 2 29022024.pdf20 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Shreeji Excelencia Form 3 29022024_compressed.pdf20 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Shreeji Excelencia.pdf18 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Shreeji Excelencia.pdf13 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Shreeji Excelencia_compressed.pdf13 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Shreeji Excelencia Form 1 Q1.pdf7 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Shreeji Excelencia Form 1 Q2.pdf7 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Shreeji Excelencia Form 2 Q1.pdf7 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Shreeji Excelencia Form 2 Q2.pdf7 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Shreeji Excelencia Form 3 Q1_compressed.pdf7 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Shreeji Excelencia Form 3 Q2_compressed.pdf7 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Shreeji Excelencia Form 3 till 31122022.pdf24 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Shreeji Excelencia Form 3 till 28022023.pdf24 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Shreeji Excelencia 22-23.pdf24 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Shreeji Excelencia Q1 22-23.pdf23 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Shreeji Excelencia Q2 22-23.pdf23 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Shreeji Excelencia Q3 22-23.pdf23 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Shreeji Excelencia Q4 22-23.pdf23 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Shreeji Excelencia Form 2 Q1.pdf23 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Shreeji Excelencia Form 2 Q2.pdf23 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Shreeji Excelencia Form 2 Q3.pdf23 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Shreeji Excelencia Form 2 Q4.pdf23 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 EXCELENCIA.pdf9 Nov 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: form 5.pdf25 Feb 2022
Layout approvalFile: Building Plan Sheet No 1.pdf26 Jul 2021
Layout approvalFile: Building Plan Sheet No 2.pdf26 Jul 2021
Layout approvalFile: Building Plan Sheet No 4.pdf26 Jul 2021
Layout approvalFile: Building Plan Sheet No 5.pdf26 Jul 2021
Layout approvalFile: Building Plan Sheet No 6.pdf26 Jul 2021
Layout approvalFile: Building Plan Sheet No 7.pdf26 Jul 2021
Layout approvalFile: Building Plan Sheet No 8.pdf26 Jul 2021
Layout approvalFile: Building Plan Sheet No 9.pdf26 Jul 2021
Layout approvalFile: Building Plan Sheet No 10.pdf26 Jul 2021
Layout approvalFile: Building Plan Sheet No 11.pdf26 Jul 2021
Layout approvalFile: Building Plan Sheet No 12.pdf26 Jul 2021
Layout approvalFile: Building Plan Sheet No 13.pdf26 Jul 2021
Layout approvalFile: Building Plan Sheet No 14.pdf26 Jul 2021
Building plan approvalFile: Building Plan Sheet No 1.pdf26 Jul 2021
Building plan approvalFile: Building Plan Sheet No 2.pdf26 Jul 2021
Building plan approvalFile: Building Plan Sheet No 4.pdf26 Jul 2021
Building plan approvalFile: Building Plan Sheet No 5.pdf26 Jul 2021
Building plan approvalFile: Building Plan Sheet No 5.pdf26 Jul 2021
Building plan approvalFile: Building Plan Sheet No 6.pdf26 Jul 2021
Building plan approvalFile: Building Plan Sheet No 7.pdf26 Jul 2021

How this compares with Nashik

81%of this project is bookeddistrict median 17%
10%of Nashik projects moved their completion datethis one has not
19%of Nashik registrations have lapsed or been cancelledthis one is completed

Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.

Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SHREEJI EXCELENCIA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near SERENE MEADOWS4,100+ in Nashik

2 kmSHREEJI EXCELENCIACompleted 51Lapsed / revoked 12Other 34Dot size: filed unitsN

Filed coordinates, straight-line distance. 97 registered projects within 2 km.

Builder: SHREEJI DEVELOPERS

SHREEJI DEVELOPERS has 27 registrations on MahaRERA, including SAHAJANAND INTEGRITY and SHREEJI DREAMS. Its filings disclose 7 earlier MahaRERA projects: declares 6 of 7 past projects completed on time. Read the full track record. See more projects on the Nashik district page.

Frequently asked questions

What are my rights if SHREEJI EXCELENCIA is delayed beyond 30 Jun 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHREEJI EXCELENCIA?

The registered promoter entity is SHREEJI DEVELOPERS, a partnership as per the filing. Its GSTIN 27AAIFV9174C1ZU can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHREEJI EXCELENCIA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SHREEJI EXCELENCIA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHREEJI EXCELENCIA?

The professionals named in the filing: Architect: SUMIT MOHANLAL KUMATH; Architect: Sumit Kumath; Engineer: SHAILESH DHUMNE; Engineer: Kishor Chopda; Chartered Accountant: CA PIYUSH MAHESH SANT; Chartered Accountant: CA PIYUSH VERMA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHREEJI EXCELENCIA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHREEJI EXCELENCIA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHREEJI EXCELENCIA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.