Shilpa Solitaire

By Shilpa Estate

RG-MH-07051 · RERA P51600077153 · Last updated on MahaRERA portal: 19 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 4 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
0 of 11Construction stages donefurthest along: Excavation, 0%
254 of 254Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 81 documents Report an error

Shilpa Solitaire is a Others project by Shilpa Estate in Nashik, Maharashtra, registered with MahaRERA as P51600077153 on 23 Jul 2024. Possession is promised by 31 Dec 2027. 0 of the 254 units on this registration are recorded sold or booked, and 0 of 11 construction stages are filed complete.

At a glance

Project

  • NameShilpa Solitaire
  • TypeOthers
  • Location
    • Mouje Chandshi
    • Near Hotel Red Rose
    • Chandshi
    • Nashik
    • 422003
  • Pincode422003
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51600077153
  • ReraGenie IDRG-MH-07051

Builder

  • NameShilpa Estate
  • Entity typePartnership
  • GSTIN27AAJFS0255N1ZT
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnersBhavik Jayesh Thakker, Jayesh Vallabhdas Thakker
  • Other registrations4 more →
  • Completed2 of 5
  • Past their filed date1
  • Declared earlier projects1 →

Key dates

this monthRegisteredJul 2024PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on23 Jul 2024
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed81 files

Current status

0%0 of 254 units booked
0.1%Work done, per cost certificate

Figures as on 19 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Shilpa SolitaireNA550254254

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 19 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 0%.

Shilpa Solitaire: 0% average across the applicable activities

ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 19 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed250

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots250
Closed/Covered250

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,020 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityTown planning Department Nashik Municipal Corporation
Permissible FSI7609.54
Proposed, not sanctioned7,610 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchThatte Nagar, Gangapur College Link Road, Nashik 422 005
Estimated costRs 15.12 cr
Cost incurredRs 2.25 lakh
Work done0.15%
BuildingWingEstimatedIncurred
Shilpa SolitaireNARs 15.12 crRs 2.25 lakh

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAr Pankaj Jadhav
EngineerEr Mahendra Ukha Patil
Chartered AccountantCA PRASAD YEOLA
Chartered AccountantBHALGAT BOTHRA & ASSOCIATES CA TUSHAR LOKHANDE
PartnerRole in project
Shilpa Estate-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 13 Jun 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 4 May 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 4 May 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 4 May 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed81

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 81 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2025-2026)File: FORM 5.pdf19 May 2026
Withdrawal Update Form 1File: FORM 1 MARCH 2026.pdf15 May 2026
Withdrawal Update Form 2File: FORM 2 MARCH 2026.pdf15 May 2026
Withdrawal Update Form 3File: FORM 3 MARCH 2026.pdf15 May 2026
Withdrawal Update Form 1File: Form 1 Solitair 05012026.pdf2 May 2026
Withdrawal Update Form 2File: Engineer Certificate-Chandashi 08012026.pdf2 May 2026
Withdrawal Update Form 3File: FORM 3 DEC 2025.pdf2 May 2026
Withdrawal Update Form 1File: Form 1 Solitair.pdf18 Dec 2025
Withdrawal Update Form 2File: FORM 2 SEPT 2025.pdf18 Dec 2025
Withdrawal Update Form 3File: Shilpa Solitaire Sept 2025 Rera CA report_removed.pdf18 Dec 2025
Withdrawal Update Form 1File: Form 1 Solitair JUNE 2025.pdf30 Sep 2025
Withdrawal Update Form 2File: FORM 2 JUNE 2025.pdf30 Sep 2025
Withdrawal Update Form 3File: FORM 3 JUNE 2025_compressed.pdf30 Sep 2025
Form 5 (FY 2024-2025)File: Shilpa Solitaire annual Report- FY 2024-25.pdf30 Jul 2025
Withdrawal Update Form 1File: Form 1 Solitair JUNE 2025.pdf19 Jul 2025
Withdrawal Update Form 2File: FORM 2 JUNE 2025.pdf19 Jul 2025
Withdrawal Update Form 3File: FORM 3 JUNE 2025_compressed.pdf19 Jul 2025
Form 1File: Form 1 Solitair SEPT 2024.pdf12 Jul 2025
Form 2File: FORM 2 SEPT 2024.pdf12 Jul 2025
Disclosure of Sold and Booked InventoryFile: S UNS 2024 25 COMPRESSED.pdf12 Jul 2025
Form 3File: FORM 3 SEPT 2024.pdf12 Jul 2025
Form 1File: Form 1 Solitair DEC 2024.pdf12 Jul 2025
Form 2File: FORM 2 DEC 2024.pdf12 Jul 2025
Form 3File: FORM 3 DEC 2024.pdf12 Jul 2025
Disclosure of Sold and Booked InventoryFile: S UNS 2024 25 COMPRESSED.pdf12 Jul 2025
Form 1File: Form 1 Solitair MARCH 2025.pdf12 Jul 2025
Form 2File: FORM 2 MARCH 2025.pdf12 Jul 2025
Form 3File: FORM 3 MARCH 2025compressed.pdf12 Jul 2025
Disclosure of Sold and Booked InventoryFile: S UNS 2024 25 COMPRESSED.pdf12 Jul 2025
Withdrawal Update Form 1File: Form 1 Solitair SEPT 2024.pdf12 Jul 2025
Withdrawal Update Form 2File: FORM 2 MARCH 2025.pdf12 Jul 2025
Withdrawal Update Form 3File: FORM 3 MARCH 2025compressed.pdf12 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Solitair SEPT 2024.pdf6 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Solitair DEC 2024.pdf6 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 SEPT 2024.pdf6 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 DEC 2024.pdf6 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 SEPT 2024.pdf6 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 DEC 2024.pdf6 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Shilpa Solitaire-CA Cert_revised_Signed.pdf12 Jul 2024
Proforma of Agreement for saleFile: ATS Shilpa Solitaire Corrected as per PNS 12-6-24 Final (2).pdf3 Jul 2024
Deviation Report with respect to model copy of AgreementFile: DEVIATION REPORT-AFS.pdf3 Jul 2024
Declaration about Commencement CertificateFile: Declaration Shilpa.PDF28 Jun 2024
Copy of the legal title reportFile: Flow of Title.pdf13 Jun 2024
Copy of the legal title reportFile: Search Report.pdf13 Jun 2024
Other - LegalFile: Clarification Letter Final.pdf13 Jun 2024
Other - LegalFile: MO U.pdf13 Jun 2024
Other - LegalFile: Partnership Deed and Retirement Deed Final.pdf13 Jun 2024
Other - LegalFile: 7 12.pdf3 Jun 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in Other Real Estate Organizations - Solitaire_1 (2 files merged).p23 May 2024
Proforma of Allotment letterFile: 1 Proforma of Allotment letter-pages-deleted.pdf23 May 2024
Other - LegalFile: Annexture A.PDF23 May 2024
Other - LegalFile: Sale Deed - converted.pdf23 May 2024
Other - TechnicalFile: Annexture A.PDF23 May 2024
Layout approvalFile: Plan No - 1.pdf4 May 2024
Layout approvalFile: Plan No -2.pdf4 May 2024
Layout approvalFile: Plan No -3.pdf4 May 2024
Layout approvalFile: Plan No - 4.pdf4 May 2024
Building plan approvalFile: Plan No - 1.pdf4 May 2024
Building plan approvalFile: Plan No -2.pdf4 May 2024
Building plan approvalFile: Plan No -3.pdf4 May 2024
Building plan approvalFile: Plan No - 4.pdf4 May 2024
PAN CardFile: Firm Pan Card.pdf4 May 2024
Copy of the legal title reportFile: Final Title Report.pdf4 May 2024
Details of encumbrances concerned to FinanceFile: Encumbrances concerned to Finance.PDF4 May 2024
Details of encumbrances concerned to FinanceFile: Encumbrances concerned to Legal.PDF4 May 2024
Details of encumbrances concerned to LegalFile: Encumbrances concerned to Finance.PDF4 May 2024
Details of encumbrances concerned to LegalFile: Encumbrances concerned to Legal.PDF4 May 2024
Copy of Layout Approval (in case of layout)File: Plan No - 1.pdf4 May 2024
Copy of Layout Approval (in case of layout)File: Plan No -2.pdf4 May 2024
Copy of Layout Approval (in case of layout)File: Plan No -3.pdf4 May 2024
Copy of Layout Approval (in case of layout)File: Plan No - 4.pdf4 May 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan No - 1.pdf4 May 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan No -2.pdf4 May 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan No -3.pdf4 May 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan No - 4.pdf4 May 2024
Commencement Certificates / NA Order for plotted developmentFile: Commcencement Certificate 26-2-24.PDF4 May 2024
Declaration in FORM BFile: Form B (2).pdf4 May 2024
CERSAI detailsFile: CERSAI REPORT.PDF4 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Other.pdf4 May 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A Declaration about Separate Bank Account.PDF4 May 2024

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
Empire MarvelShilpa Estates Sumangal Builders House Sadhu Waswani Road Opp Holaram Colony Near MICO Circle Nashik 422002120CompletedAug 2022Jun 2022

How this compares with Nashik

0%of this project is bookeddistrict median 17%
10%of Nashik projects moved their completion datethis one has not
19%of Nashik registrations have lapsed or been cancelledthis one is on the register

Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.

Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Shilpa Solitaire on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Near Hotel Red Rose4,100+ in Nashik

2 kmShilpa SolitaireCompleted 6Lapsed / revoked 1Other 9Dot size: filed unitsN

Filed coordinates, straight-line distance. 16 registered projects within 2 km.

Builder: Shilpa Estate

Shilpa Estate has 5 registrations on MahaRERA, including Empire Marvel and SHILPA ANANDVAN. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Nashik district page.

Frequently asked questions

What are my rights if Shilpa Solitaire is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Shilpa Solitaire?

The registered promoter entity is Shilpa Estate, a partnership as per the filing. Its GSTIN 27AAJFS0255N1ZT can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Shilpa Solitaire?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Shilpa Solitaire?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Shilpa Solitaire?

The professionals named in the filing: Architect: Ar Pankaj Jadhav; Engineer: Er Mahendra Ukha Patil; Chartered Accountant: CA PRASAD YEOLA; Chartered Accountant: BHALGAT BOTHRA & ASSOCIATES CA TUSHAR LOKHANDE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Shilpa Solitaire?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Shilpa Solitaire. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Shilpa Solitaire to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.