SWASTIK MANGAL APARTMENT
RG-MH-60548 · RERA P51600051953 · Last updated on MahaRERA portal: 8 Aug 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- 4 complaints at MahaRERA
- Completion date moved by 24 months
- 1 extension taken
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SWASTIK MANGAL APARTMENT is a Others project by SHREEMANGAL CONSTRUCTION in Nashik, Maharashtra, registered with MahaRERA as P51600051953 on 13 Jul 2023. Possession is promised by 31 Mar 2027. The completion date has moved by 24 months from the original filing. 126 of the 218 units on this registration are recorded sold or booked, and 13 of 22 construction stages are filed complete. 4 complaints are on record with the regulator.
At a glance
Project
- NameSWASTIK MANGAL APARTMENT
- TypeOthers
- Location
- SR NO 1/2/12 AT KAMATWADE
- KAMATWADE
- Nashik (M Corp.)
- Nashik
- 422010
- Pincode422010
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51600051953
- ReraGenie IDRG-MH-60548
Builder
- NameSHREEMANGAL CONSTRUCTION
- Entity typePartnership
- PartnerGAURAV TARACHAND GUPTA
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on13 Jul 2023
- Promised completion31 Mar 2027
- Revised completionRevised to 31 Mar 2027 (originally 31 Mar 2025)
- Buildings2 building records
- Documents filed104 files
Current status
Figures as on 8 Aug 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| SWASTIK MANGAL APARTMENT -A WING | NA | 14 | 12 | 120 | 0 | 120 |
| SWASTIK MANGAL APARTMENT -B WING | NA | 13 | 12 | 83 | 15 | 98 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 8 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
13 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Sanitary Fittings within the flats / premises, at 85%.
SWASTIK MANGAL APARTMENT -A WING88%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 85% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 85% |
SWASTIK MANGAL APARTMENT -B WING83%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 85% |
| Sanitary Fittings within the flats / premises | 85% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 85% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 85% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 70% |
Progress on shared amenities15
As on 8 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 80% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 50% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 50% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 80% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed287
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| SWASTIK MANGAL APARTMENT -A WING | 132 | 132 |
| SWASTIK MANGAL APARTMENT -B WING | 155 | 155 |
Land and ownership8
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| BABUBHAU MATALE THROUGH GPA NEERA GUPTA | Nashik (M Corp.) | Nashik |
| PANDURANG BABURAO MATALE | Nashik (M Corp.) | Nashik |
| CHANDRABHAGABAIKARBHARI KATALE | Nashik (M Corp.) | Nashik |
| BHIMABAI WALU PALKHEDE | Nashik (M Corp.) | Nashik |
| MANDABAI SAHEBRAO PATIL | Nashik (M Corp.) | Nashik |
| INDUBAI ANIL GAOKAR | Nashik (M Corp.) | Nashik |
| SINDUBAI DATTU KAPASE | Nashik (M Corp.) | Nashik |
| SUNIL BABURAO MATALE | Nashik (M Corp.) | Nashik |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| SWASTIK MANGAL APARTMENT -A WING | NA | Rs 9.50 cr | Rs 8.80 cr |
| SWASTIK MANGAL APARTMENT -B WING | NA | Rs 9.50 cr | Rs 8.80 cr |
| - | NA | Rs 1.00 cr | - |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | GUPTAS ASSOCIATED ARCHITECTS PVT LTD |
| Engineer | MILIND RATHI |
| Chartered Accountant | CA NANDKISHOR PATIL |
| Chartered Accountant | CA PIYUSH LALIT VERMA |
| Chartered Accountant | SANVY AND ASSOCIATES |
| Partner | Role in project |
|---|---|
| SHREEMANGAL CONSTRUCTION | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterWorkforce and Material Issues: • Labor Shortages: Availability of skilled manpower, especially in structural and MEP (Mechanical, Electrical & Plumbing) areas, was restricted due to migration and contractual disruptions, slowing down project execution. • Supply Chain Disruptions: Escalation in raw material costs and delays in delivery of essential materials further extended the project timeline. b. Financial Constraints: • Due to market slowdown, the project faced liquidity constraints, delaying scheduled construction activities. c. Design Changes and Legal Issues: • Minor design alterations w
Complaints filed with MahaRERA4
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| SM12500110 | Ram Gawali | SHREEMANGAL CONSTRUCTION | 02/09/2025 |
| SM12500111 | Ram Gawali | SHREEMANGAL CONSTRUCTION | 02/09/2025 |
| SM12500125 | Ram Gawali | SHREEMANGAL CONSTRUCTION | 09/09/2025 |
| SM12500126 | Ram Gawali | SHREEMANGAL CONSTRUCTION | 09/09/2025 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 6 Apr 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 6 Apr 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 18 Jun 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 6 Apr 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Mar 2027
Documents filed104
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 104 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1 June 25.pdf | 8 Aug 2026 |
| Withdrawal Update Form 1File: Form 1 Sept 25.pdf | 8 Aug 2026 |
| Withdrawal Update Form 1File: Form 1 Dec 25.pdf | 8 Aug 2026 |
| Withdrawal Update Form 1File: Form 1 March 26.pdf | 8 Aug 2026 |
| Withdrawal Update Form 2File: Form 2 June 25.pdf | 8 Aug 2026 |
| Withdrawal Update Form 2File: Form 2 Sept 25.pdf | 8 Aug 2026 |
| Withdrawal Update Form 2File: Form 2 Dec 25.pdf | 8 Aug 2026 |
| Withdrawal Update Form 2File: Form 2 March 26.pdf | 8 Aug 2026 |
| Withdrawal Update Form 3File: Form 3 June 25.pdf | 8 Aug 2026 |
| Withdrawal Update Form 3File: Form 3 Sept 25.pdf | 8 Aug 2026 |
| Withdrawal Update Form 3File: Form 3 Dec 25.pdf | 8 Aug 2026 |
| Withdrawal Update Form 3File: Form 3 March 26.pdf | 8 Aug 2026 |
| Form 1File: SM AR CERT 310325.pdf | 6 Aug 2025 |
| Form 2File: SM ER CERT 310325.pdf | 6 Aug 2025 |
| Form 3File: Form 3 31-03-25.pdf | 6 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold mARCH 25.pdf | 6 Aug 2025 |
| Form 2A (FY 2023-2024)File: Form 2A March 23.pdf | 6 Aug 2025 |
| Form 2A (FY 2024-2025)File: Form 2A March 25.pdf | 6 Aug 2025 |
| Form 5 (FY 2023-2024)File: SMC RERA SWASTIK MANGAL 23-24.pdf | 6 Aug 2025 |
| Building plan approvalFile: Building Plan - 1.pdf | 18 Jun 2025 |
| Building plan approvalFile: Building Plan - 2.pdf | 18 Jun 2025 |
| Building plan approvalFile: Building Plan - 3.pdf | 18 Jun 2025 |
| Building plan approvalFile: Building Plan - 4.pdf | 18 Jun 2025 |
| Building plan approvalFile: Building Plan - 5.pdf | 18 Jun 2025 |
| Building plan approvalFile: Building Plan - 6.pdf | 18 Jun 2025 |
| Building plan approvalFile: Building Plan - 7.pdf | 18 Jun 2025 |
| Self-declaration of Quarterly ProgressFile: Self declaration 30092023.pdf | 21 May 2025 |
| Disclosure of Sold and Booked InventoryFile: 7 Sept 23.pdf | 21 May 2025 |
| Form 1File: Self declaration 30092023.pdf | 21 May 2025 |
| Form 2File: 7 Sept 23.pdf | 21 May 2025 |
| Form 3File: Form 1 Dec 23.pdf | 21 May 2025 |
| Disclosure of Sold and Booked InventoryFile: Form 2_Dec 23.pdf | 21 May 2025 |
| Form 1File: Self declaration 30092023.pdf | 21 May 2025 |
| Form 2File: 7 Sept 23.pdf | 21 May 2025 |
| Form 3File: Form 1 Dec 23.pdf | 21 May 2025 |
| Disclosure of Sold and Booked InventoryFile: Form 2_Dec 23.pdf | 21 May 2025 |
| Form 1File: Self declaration 30092023.pdf | 21 May 2025 |
| Form 2File: 7 Sept 23.pdf | 21 May 2025 |
| Form 3File: Form 2_Dec 23.pdf | 21 May 2025 |
| Disclosure of Sold and Booked InventoryFile: Form 1 Dec 23.pdf | 21 May 2025 |
| Form 1File: Self declaration 30092023.pdf | 21 May 2025 |
| Form 2File: 7 Sept 23.pdf | 21 May 2025 |
| Form 3File: Form 2_Dec 23.pdf | 21 May 2025 |
| Disclosure of Sold and Booked InventoryFile: Form 1 Sept 24.pdf | 21 May 2025 |
| Form 1File: SM AR CERT 311224.pdf | 9 May 2025 |
| Form 2File: SM ER CERT 311224.pdf | 9 May 2025 |
| Form 3File: Form 3 31-12-24.pdf | 9 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 June 24.pdf | 24 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Sept 24.pdf | 24 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 June 24.pdf | 24 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Sept 24.pdf | 24 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 June 24.pdf | 24 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Sept 24.pdf | 24 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: SMC RERA SWASTIK MANGAL 23-24.pdf | 21 Nov 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: SMC RERA SWASTIK MANGAL 23-24.pdf | 21 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Dec 23.pdf | 27 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Mar 24.pdf | 27 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Dec 23.pdf | 20 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Mar 24.pdf | 20 May 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5_FY 22-23.pdf | 20 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Swastik Mangal form 3 31122023.pdf | 18 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Swastik mangal form 3 31032024.pdf | 18 May 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A - Neera gupta.pdf | 12 Jun 2023 |
| Other - FinanceFile: Adobe Scan 22 May 2023.pdf | 24 May 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERT FINAL200523.pdf | 20 May 2023 |
| Details of encumbrances concerned to FinanceFile: No Encumbrance finance.pdf | 29 Apr 2023 |
| Details of encumbrances concerned to LegalFile: No Encumbrance finance.pdf | 29 Apr 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: 4 Other - Legal.pdf | 29 Apr 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A - gaurav gupta.pdf | 29 Apr 2023 |
| Details of encumbrances concerned to FinanceFile: No Encrubance Legal.pdf | 15 Apr 2023 |
| Details of encumbrances concerned to LegalFile: No Encrubance Legal.pdf | 15 Apr 2023 |
| Proforma of Allotment letterFile: Allotment Letter Swastik m_11zon.pdf | 7 Apr 2023 |
| Other - LegalFile: MOU MAHADA-1-25 (1).pdf | 7 Apr 2023 |
| Layout approvalFile: LAYOUT.pdf | 6 Apr 2023 |
| Layout approvalFile: LAYOUT 1.pdf | 6 Apr 2023 |
| Building plan approvalFile: PLAN 1_compressed.pdf | 6 Apr 2023 |
| Building plan approvalFile: PLAN 2_compressed.pdf | 6 Apr 2023 |
| Building plan approvalFile: PLAN 3_11zon.pdf | 6 Apr 2023 |
| Building plan approvalFile: PLAN 4_compressed.pdf | 6 Apr 2023 |
| Building plan approvalFile: PLAN 5_2_11zon.pdf | 6 Apr 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nashik
Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.
Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 104 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep SWASTIK MANGAL APARTMENT on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near KAMATWADE4,100+ in Nashik
Filed coordinates, straight-line distance. 94 registered projects within 2 km.
SHREE SATYANARAYAN ROONGTA FORUM
ROONGTA HOMES LLP
LIFE 360
VELOCITY INFRA PROJECTS
ARYAN'S LIFEONE
SHREE ARYAN BUILDERS AND DEVELOPERS
SUNFLOWER CITY
DEEPAK KALYANJI CHANDE
Laxminarayan Heaven
Sahajanand Builders And Developers
VRINDAVAN DHAM
RAJMUDRA CONSTRUCTIONS
See every Nashik project, with the district possession charts
Builder: SHREEMANGAL CONSTRUCTION
SHREEMANGAL CONSTRUCTION has 1 registration on MahaRERA, including SWASTIK MANGAL APARTMENT. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nashik district page.
Frequently asked questions
What are my rights if SWASTIK MANGAL APARTMENT is delayed beyond 31 Mar 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SWASTIK MANGAL APARTMENT?
The registered promoter entity is SHREEMANGAL CONSTRUCTION, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SWASTIK MANGAL APARTMENT?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against SWASTIK MANGAL APARTMENT?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for SWASTIK MANGAL APARTMENT?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SWASTIK MANGAL APARTMENT?
The professionals named in the filing: Architect: GUPTAS ASSOCIATED ARCHITECTS PVT LTD; Engineer: MILIND RATHI; Chartered Accountant: CA NANDKISHOR PATIL; Chartered Accountant: CA PIYUSH LALIT VERMA; Chartered Accountant: SANVY AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SWASTIK MANGAL APARTMENT?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback