New projects and RERA data in Dadra & Nagar Haveli district, Maharashtra

218 of the projects in this build are in Dadra & Nagar Haveli district: 13,017 units across them, 31 registered in the last 12 months. Sales and inventory trends accumulate from each future quarterly update; this page shows the first one.

218Projects in this build
31Registered, last 12 months
13,017Units declared
8,779Units not yet booked
22Completion dates revised
0With declared litigation

Of the 218 covered registrations, 22 have revised their promised completion date and 0 declare litigation. The median project here is 30% booked as of the current data. Every figure comes from the projects' own MahaRERA filings.

When Dadra & Nagar Haveli projects promise possession

Promised possession year as filed by the builder with MahaRERA, split by what the registration says today. Of 218 projects with a promised date, 61 are recorded delivered, 95 are still on the register and 62 have a registration that has lapsed or been cancelled.

DeliveredOn the registerRegistration lapsed or cancelled

012253750today2018: 9 projects, delivered2018: 2 projects, registration lapsed or cancelled’182019: 12 projects, delivered2019: 4 projects, registration lapsed or cancelled’192020: 6 projects, delivered2020: 6 projects, registration lapsed or cancelled’202021: 4 projects, delivered2021: 3 projects, registration lapsed or cancelled’212022: 4 projects, delivered2022: 9 projects, registration lapsed or cancelled’222023: 3 projects, delivered2023: 12 projects, registration lapsed or cancelled’232024: 5 projects, delivered2024: 13 projects, registration lapsed or cancelled’242025: 5 projects, delivered2025: 8 projects, registration lapsed or cancelled’252026: 10 projects, delivered2026: 15 projects, on the register2026: 5 projects, registration lapsed or cancelled’262027: 3 projects, delivered2027: 16 projects, on the register’272028: 15 projects, on the register’282029: 11 projects, on the register’292030: 18 projects, on the register’302031: 6 projects, on the register’312032: 9 projects, on the register’322033: 2 projects, on the register’332034: 1 projects, on the register’342035: 2 projects, on the register’35

113 projects promise possession in 2026 or later. Facts as per filings on RERA website.

06251,2501,8752,500today’18’192020: 213 flats, registration lapsed or cancelled (only 3 of 12 projects filed a flat count)’202021: 103 flats, delivered (only 2 of 7 projects filed a flat count)2021: 2 flats, registration lapsed or cancelled (only 2 of 7 projects filed a flat count)’212022: 72 flats, delivered (only 4 of 13 projects filed a flat count)2022: 277 flats, registration lapsed or cancelled (only 4 of 13 projects filed a flat count)’222023: 159 flats, registration lapsed or cancelled (only 1 of 15 projects filed a flat count)’232024: 25 flats, delivered (only 3 of 18 projects filed a flat count)2024: 159 flats, registration lapsed or cancelled (only 3 of 18 projects filed a flat count)’242025: 28 flats, delivered2025: 776 flats, registration lapsed or cancelled’252026: 561 flats, delivered2026: 1,194 flats, on the register2026: 358 flats, registration lapsed or cancelled’262027: 135 flats, delivered2027: 1,722 flats, on the register’272028: 491 flats, on the register’282029: 853 flats, on the register’292030: 2,466 flats, on the register’302031: 677 flats, on the register’312032: 1,369 flats, on the register’322033: 515 flats, on the register’332034: 561 flats, on the register’342035: 301 flats, on the register’35

11,203 flats are promised in 2026 or later, across the 77% of those projects that file a flat count. Hatched years are ones where most builders never filed a count, so the bar understates real supply and cannot be compared with the years beside it. Facts as per filings on RERA website.

How far Dadra & Nagar Haveli possession dates have moved

Builders may revise the possession date they filed at registration. Each bar is the year a project first promised, split by how far that date has since moved. 22 of 218 projects (10%) have moved at least once; the median move is 18 months and the longest is 75 months.

Kept the original dateMoved by under 2 yearsMoved by 2 years or more

012253750Originally due 2018: 11 projects kept the original date, 92% of the yearOriginally due 2018: 1 projects moved by under 2 years, 8% of the year’18Originally due 2019: 15 projects kept the original date, 60% of the yearOriginally due 2019: 5 projects moved by under 2 years, 20% of the yearOriginally due 2019: 5 projects moved by 2 years or more, 20% of the year’19Originally due 2020: 8 projects kept the original date, 80% of the yearOriginally due 2020: 2 projects moved by under 2 years, 20% of the year’20Originally due 2021: 4 projects kept the original date, 80% of the yearOriginally due 2021: 1 projects moved by 2 years or more, 20% of the year’21Originally due 2022: 10 projects kept the original date, 83% of the yearOriginally due 2022: 1 projects moved by under 2 years, 8% of the yearOriginally due 2022: 1 projects moved by 2 years or more, 8% of the year’22Originally due 2023: 13 projects kept the original date, 93% of the yearOriginally due 2023: 1 projects moved by 2 years or more, 7% of the year’23Originally due 2024: 18 projects kept the original date, 95% of the yearOriginally due 2024: 1 projects moved by under 2 years, 5% of the year’24Originally due 2025: 10 projects kept the original date, 83% of the yearOriginally due 2025: 2 projects moved by under 2 years, 17% of the year’25Originally due 2026: 27 projects kept the original date, 93% of the yearOriginally due 2026: 1 projects moved by under 2 years, 3% of the yearOriginally due 2026: 1 projects moved by 2 years or more, 3% of the year’26Originally due 2027: 18 projects kept the original date, 100% of the year’27Originally due 2028: 14 projects kept the original date, 100% of the year’28Originally due 2029: 11 projects kept the original date, 100% of the year’29Originally due 2030: 17 projects kept the original date, 100% of the year’30Originally due 2031: 6 projects kept the original date, 100% of the year’31Originally due 2032: 9 projects kept the original date, 100% of the year’32Originally due 2033: 2 projects kept the original date, 100% of the year’33Originally due 2034: 1 projects kept the original date, 100% of the year’34Originally due 2035: 2 projects kept the original date, 100% of the year’35

Read down a bar to see how much of that year's cohort held its promise. Facts as per filings on RERA website.

01,2502,5003,7505,000’18Originally due 2019: 272 flats moved by under 2 years, 20% of the year (only 6 of 25 projects filed a flat count)Originally due 2019: 387 flats moved by 2 years or more, 20% of the year (only 6 of 25 projects filed a flat count)’19Originally due 2020: 44 flats kept the original date, 80% of the year (only 3 of 10 projects filed a flat count)Originally due 2020: 122 flats moved by under 2 years, 20% of the year (only 3 of 10 projects filed a flat count)’20Originally due 2021: 52 flats moved by 2 years or more, 20% of the year (only 1 of 5 projects filed a flat count)’21Originally due 2022: 165 flats kept the original date, 83% of the year (only 3 of 12 projects filed a flat count)Originally due 2022: 499 flats moved by 2 years or more, 8% of the year (only 3 of 12 projects filed a flat count)’22Originally due 2023: 190 flats moved by 2 years or more, 7% of the year (only 1 of 14 projects filed a flat count)’23Originally due 2024: 184 flats kept the original date, 95% of the year (only 4 of 19 projects filed a flat count)Originally due 2024: 26 flats moved by under 2 years, 5% of the year (only 4 of 19 projects filed a flat count)’24Originally due 2025: 115 flats kept the original date, 83% of the year (only 5 of 12 projects filed a flat count)Originally due 2025: 123 flats moved by under 2 years, 17% of the year (only 5 of 12 projects filed a flat count)’25Originally due 2026: 1,800 flats kept the original date, 93% of the yearOriginally due 2026: 258 flats moved by under 2 years, 3% of the yearOriginally due 2026: 718 flats moved by 2 years or more, 3% of the year’26Originally due 2027: 1,599 flats kept the original date, 100% of the year’27Originally due 2028: 439 flats kept the original date, 100% of the year’28Originally due 2029: 853 flats kept the original date, 100% of the year’29Originally due 2030: 1,748 flats kept the original date, 100% of the year’30Originally due 2031: 677 flats kept the original date, 100% of the year’31Originally due 2032: 1,369 flats kept the original date, 100% of the year’32Originally due 2033: 515 flats kept the original date, 100% of the year’33Originally due 2034: 561 flats kept the original date, 100% of the year’34Originally due 2035: 301 flats kept the original date, 100% of the year’35

Hatched years are ones where most builders never filed a flat count, so the bar understates the real total. Read down a bar to see how much of that year's cohort held its promise. Facts as per filings on RERA website.

Projects in Dadra & Nagar Haveli

ProjectDeveloperUnits BookedRegistered
ORION IMPERIAMpoonam Developers LLP71843%12 Dec 2017
PRAMUKH SHIVANTAROYAL ENTERPRISE56114%16 Aug 2024
SHASHIKALP SAROVARAKS BUILDERS AND DEVELOPERES49952%4 Jul 2018
Ekdant Silver OakEkdant Developers3078%12 Jan 2026
Nagjua AnantaMICROMEGA PROJECTS27589%10 Jan 2023
ROYAL VIEW-IIM & P DEVELOPERS2600%17 Mar 2026
PARADISE ONEJMB REALTY25854%26 Sep 2022
SAHAJ INFINITYADITYA REALITY2580%21 May 2026
Ekdant Sapphire SpringsEkdant Developers25641%6 May 2025
SUNRAHI SKYLINENISHMA SUNNY BHIMRA2485%19 May 2025
MANGALAM HEIGHTS PHASE-IIMANGALAM DEVELOPERS22430%26 Jun 2025
YOGI WOODS PHASE 2Shiv Builders22329%11 Aug 2025
Pramukh Nakshatra-2 Ph-1Pramukh Realty2161%6 Feb 2026
KRISHNA TOWERSPRABHAT PRATAPJI RAJPUROHIT21545%3 Feb 2023
EDEN COURTSilverbill Properties LLP2080%28 Apr 2026
MEADOWSPRAMUKH REALTY20173%5 Oct 2021
ARIHANT A & B WINGArihant Developers19012%8 Dec 2017
AKSHAR RESIDENCYSNT DEVELOPERS18072%27 Jun 2023
BALAJI RESIDENCYDREAM DEVELOPERS17634%23 Jun 2025
SPRING CITY P2SPRING CITY DEVELOPERS17422%7 Oct 2025
PRAMUKH GARDENS-2PRAMUKH REALTY17296%22 Nov 2021
THE AVENUEDEVYANI RAJENDRASINH DODIA16811%8 Sep 2021
SIDDHI TOWERVIMLESH YUGRAJ SHUKLA16439%7 Nov 2017
Pramukh Swagat-2 A,B,C BuildingPramukh Realty16434%29 Jan 2026
YOGI WOODS PH-1SHIV BUILDERS16338%6 Mar 2023
PALLADIUM ALCOVESEVEN - 9 DEVCON LLP16217%13 Jul 2023
JALARAM DARSHAN PHASE IIRADHEKRISHNA DEVELOPERS15940%7 Nov 2017
Polaris Infinity A A1, A2, A3, A4R R Enterprise15934%12 May 2022
HORIZON CITYJN INFRA1565%10 Mar 2026
ADVAIT SKYLINEDHANASVI INFRA1550%6 Apr 2026
SAHAJANAND INTEGRITYSHREEJI DEVELOPERS15031%13 Feb 2020
Pramukh Meadows-2 Ph-1TOUGH BUILDERS AND CONSTRUCTIONS LLP1501%16 Mar 2026
ARV UNICAM/S. A.R.V. REALTY14842%9 Feb 2022
Tropical Greens Phase-2 BMICROMEGA PROJECTS14650%6 Nov 2023
Kalpataru Skyline- Phase-IIJNR BUILDERS14627%12 Jan 2026
Tropical Greens Phase-2 AMICROMEGA PROJECTS14574%26 Aug 2022
POONAM RESIDENCY A B AND D WINGGagan Kishorbhai Chotaliya1450%23 Jun 2025
VRINDAVANKRISHNA DEVELOPERS14530%11 Aug 2025
AKSHAR GREENS PHASE-2MUNIVAR DEVELOPERS14462%17 Apr 2023
AKSHAR HEIGHTS PHASE-2MUNIVAR DEVELOPERS1400%22 Jun 2026
PALLADIUM HIGHSTREETSEVEN - 9 DEVCON LLP13949%13 Nov 2024
Heaven PlazaDiamond Developers1370%15 Jun 2026
Ekdant Sanskriti Building BKALPSHREE HOMES13537%13 Nov 2024
GOKULDHAM TOWNSHIPDOSHI AND MEHTA ASSOCIATES13519%17 Mar 2025
AKAR HEIGHTSRAMDEV BUILDERSS1271%9 Jun 2026
HORIZON INDUSTRIAL PARKSAI INFRA INDUSTRIES12324%10 Mar 2021
RAJESHREE RESIDENCY IIJ B DEVELOPERS1220%27 Mar 2025
Palladium High Street West Gate B & CSEVEN - 9 DEVCON LLP12239%27 Feb 2026
SHREE SAKHA SADANSHREE SAKHA DEVELOPERS PRIVATE LIMITED1200%7 Aug 2018
AKSHAR AVENUESHIVSHAKTI DEVELOPERS12033%3 Jul 2025
J9 TRITONFOUR SEASONS LIFE SPACE11624%31 Jul 2021
MANGALAM RIVERSIDEMANGALAM ENTERPRISE11219%28 Jul 2025
Mangalam HomesMangalam Buildcon1120%8 Jun 2026
RUDRAKSH-1SHREE VINAYAK DEVELOPERS10529%28 Mar 2025
Saffron HeightSun Corporation10366%7 Nov 2017
SUMUKH RESIDENCYECSTASY DEVELOPERS9624%3 Oct 2022
Saffron Height Phase 2 , Building C And DSun Corporation9368%8 Feb 2019
PALLADIUM SQUARESEVEN - 9 DEVCON LLP9399%2 Feb 2022
RAJ HEAVENS PHASE II D WINGBURHANI TAMOS DEVELOPERS9054%17 Jan 2023
ORION VILLA - P1M.POONAM DEVELOPERS8990%29 Nov 2017
SIGNATURE HEIGHTSSHRI BALAJI REALITY8032%27 Feb 2018
SILVASSA COMMERCIAL HUBMILAN KHANDUBHAI PATEL800%24 Feb 2020
SAHAJ SHANGRILASHREE ASSOCIATES8082%8 Nov 2021
OASIS HEIGHTSMAHARANI DEVELOPERS800%7 Jul 2026
THE PLATINUM A WINGBURHANI BUILDERS AND DEVELOPERS7873%27 Dec 2024
SAI NAGAR PHASE 2- I WINGDATTAINFINITY72100%14 Jun 2019
RAJ HEAVENS PHASE 1 C BUILDINGBURHANI TAMOS DEVELOPERS7274%21 Oct 2020
RAJESHREE RESIDENCYJ B DEVELOPERS7238%22 May 2023
SANGATH E1-E2Pramukh Realty7254%29 Jul 2024
RUDRAKSHAK AND R ASSOCIATES7030%18 Dec 2023
EKDANT SHLOKKalpeshkumar Takhatsinh Parmar6945%21 Nov 2022
GANESH SOCIETY PHASE 1ASHISHBHAI BHARATBHAI THAKKAR643%7 Nov 2017
M.J. HEIGHTSSHREE KRISHNA BUILDCON6352%26 Sep 2022
SAKET RESIDENCY, PHASE-II, BUILDING-KJALARAM DEVELOPERS630%3 Jul 2023
Bliss-2Pramukh Realty610%12 Jan 2026
RAJESHREE COMPLEX A BUILDINGABS DEVELOPERS6052%10 Oct 2022
Arihant C WingARIHANT DEVELOPERS530%8 Jul 2026
SHAYONA ORNATESHAYONA DEVELOPERS5277%7 Nov 2017
PALLADIUM PARKSEVEN - 9 DEVCON LLP502%2 Dec 2025
AMARABALAJI BUILDERS490%11 Mar 2026
THE PRIDEBURHANI BUILDERS AND DEVELOPERS46100%3 Dec 2021
MAHALAXMI AVENUEBNB DEVELOPERS460%17 Apr 2025
Orion Villa P2M.Poonam Developers4461%26 Jun 2018
SHRADDHA RESIDENCY- BUILDING A and BSHRADDHA ENTERPRISE4257%8 Nov 2023
SHASHIKALP HOMES A WINGAKS BUILDTECH400%12 Aug 2022
INFINITY SAPPHIREGRAYSCALE ARCHITECTS4055%24 Mar 2025
RIVER CROWNSUN REALITY400%12 May 2026
KASTURI FLORIDUSFLORIDUS REALTORS LLP3694%19 May 2023
Silva The PrideBURHANI BUILDERS AND DEVELOPERS340%11 Jun 2026
Sai Residency E WingDATTA PROJECTS PVT LTD300%21 Nov 2025
HARMONY PHASE 2PRAMUKH REALTY2763%4 Jan 2022
THE PALACIOTABP Build LLP2638%20 Jul 2021
SAMARA - PREMIUM GARDEN RESIDENCESSPJ Developers268%26 Feb 2026
SIDDHI VINAYAK APPARTMENT-2SIDDHI VINAYAK ENTERPRISES2564%24 Jul 2023
INDRAPRASTHINDRASINH TAKHATSINH SOLANKI250%16 Mar 2026
Neev Nandaa ProjectBhavesh Navinchandra Gajjar250%9 Jul 2026
SHASHIKALP HOMES B WINGAKS BUILDTECH2060%14 Sep 2022
THE COURTYARD PHASE3M/s LIVINGDWELL ENTERPRISE180%18 May 2022
THE GRANDE VILLAGRAYSCALE ARCHITECTS17100%10 Aug 2021
SAI NAGAR PHASE2-B WINGDATTAINFINITY1377%18 Jun 2024
THE COURTYARD PHASE 3AM/s LIVINGDWELL ENTERPRISE110%21 Oct 2024
THE COURTYARD PHASE2M/s LIVINGDWELL ENTERPRISE100%8 Jan 2021
THE COURTYARD PHASE 3BM/s LIVINGDWELL ENTERPRISE100%16 Jun 2025
ABHINANDAN MOUNTREEAABHI DEVELOPERS50%11 Feb 2026
KRISHNA HEIGHTST S DEVELOPERS2100%9 Apr 2019
SANGATHPramukh Realty1100%22 Jul 2019
SKYLET VISTASWARAJ REALITY10%26 Feb 2024
Pramukh Sneh Phase 2Pramukh Realty--7 Oct 2017
DEEP LAXMI DEVELOPERSDEEP LAXMI DEVELOPERS--23 Oct 2017
PRAMUKH GARDENS PHASE 2PRASHANT DEVELOPERS PVT LTD--23 Oct 2017
VRUNDAVANSILVASSA ASBESTOS CEMENT PRODUCT--7 Nov 2017
SAHJANAND PARKLAXMI REALTORS--11 Apr 2018
Pramukh Sangam Phase 2Pramukh Devcon Pvt. Ltd--2 Nov 2017
Sunrise ResidencySunrise Corporation--7 Nov 2017
SHASHIKALP CLASSICSHREE SHIV BUILDERS--7 Nov 2017
Yogi Milan Phase 2Shiv Builders--25 Oct 2017
PRABHAT APPARTMENTAB DEVELOPERS--25 Oct 2017
JAS LUXURIA , J-1ASHNAY Developers--7 Nov 2017
SRI MADHAV RESIDENCYSRI MADHAV CORPORATION--4 Dec 2017
Yogi Milan Phase 3Shiv Builders--7 Nov 2017
SPRING CITYSPRING CITY DEVELOPERS--7 Nov 2017
SRI KONARK PLAZASRI KONARK CORPORATION--7 Nov 2017
SAI AURADATTA PROJECTS PVT LTD--23 Oct 2017
AKSHAR GREENSMUNIVAR DEVELOPERS--2 Nov 2017
TIRUPATI RESIDENCYDATTA PROJECTS PVT LTD--30 Oct 2017
HORIZON HEIGHTS B WINGJUPITER BUILDER AND DEVELOPERS--7 Nov 2017
HARI LILADEEPAK HARGOVIND DOSHI--7 Nov 2017
SHIVAM HEIGHTSKRISHNA ENTERPRISE--7 Nov 2017
SAI NAGAR PHASE 2 K WINGDATTAINFINITY--7 Nov 2017
MAHADEV RESIDENCY NAROLIMAGIC RETREAT--7 Nov 2017
JAS Exotica Phase IIHriday Developers--7 Nov 2017
PADMAVATI ENCLAVE PHASE 2Juzer Firoz Stovewalla--7 Nov 2017
MANORATH RESIDENCY PHASE - 2Krishnakumar Ramsinh Parmar--7 Nov 2017
HORIZON RESIDENCY B BUILDINGARHAM DEVELOPER--7 Nov 2017
HORIZON RESIDENCY C BUILDINGARHAM DEVELOPER--7 Nov 2017
EKDANT SQUARE-RIDDHI WINGKALPSHREE DEVELOPERS--7 Nov 2017
RAJESHREE TOWERAB DEVELOPERS--7 Nov 2017
VEDANT RESIDENCYJALARAM DEVELOPERS--7 Nov 2017
ARV RIVERDALEM/S. A.R.V. REALTY--7 Nov 2017
BALAJI GEMSKRISHNA ENTERPRISE--7 Nov 2017
ANAND NAGARAbhishek Rajendra Mutha--7 Nov 2017
KALPATARU RESIDENCYDEVYANI R DODIA--7 Nov 2017
BLOCK E, SRI RESIDENCYSHREE GURUDEV ENTERPRISE--26 Dec 2017
SKY HEIGHTSPRAY DEVELOPERS--29 Nov 2017
KASTURI FLORIDUSSHIVAAY DEVELOPERS--15 Dec 2017
KASTURI FLORIDUSSHIVAAY DEVELOPERS--15 Dec 2017
EKDANT SQUARE SIDDHI WINGKalpshree Developers Siddhi Wing--15 Feb 2018
JC TOWERUMEDBHAI CHHIBUBHAI PATEL--9 Apr 2018
SHREE BALAJI RESIDENCYANAND ASSOCIATES--11 Apr 2018
Sunrise Residency B BuildingSunrise Corporation--25 May 2018
SAI SANSKRUTISAI ENTERPRISES--5 Jun 2018
Sai Nagar Phase 2 J WingDATTAINFINITY--21 May 2018
GANGOTRIH V CONSTRUCTION--17 Jul 2018
Shagun Residency Building AAnjana Developers--9 Aug 2018
TROPICAL GREENS PHASE 1-AMICROMEGA PROJECTS--7 Aug 2018
GURUKRUPA RESIDENCYGURUKRUPA ENTERPRISES--27 Jul 2018
BALAJI PLATINUMBALAJI ENTERPRISE--9 Aug 2018
SAI ENCLAVESHREE SAI DEVELOPERS--13 Aug 2018
Tropical Greens Phase 1-BMICROMEGA PROJECTS--28 Aug 2018
SIDDHI VINAYAK APPARTMENTSIDDHI VINAYAK ENTERPRISES--10 Oct 2018
EKDANT RESIDENCYSHRIKANT KULKARNI--10 Oct 2018
Nakshatra A-BPramukh Realty--30 Oct 2018
NAKSHATRA C to GPramukh realty--27 Nov 2018
ABHISHEK LUXURIAABHISHEK DEVELOPERS--13 Nov 2018
PADMAVATI ENCLACE PHASE IIIJUZER FIROZ STOVEWALLA--9 Apr 2019
SUNRISE RESIDENCYSunrise Builders--12 Feb 2019
SHIVAM HEIGHTS PHASE 2KRISHNA ENTERPRISE--30 Jan 2019
SAI AASTHASAI ASSOCIATE--12 Feb 2019
SAKET RESIDENCY PHASE-II, BUILDING - JJALARAM DEVELOPERS--6 Feb 2019
Poonam Residency C BuildingGagan Kishorbhai Chotaliya Proprietor of Lalgebi Enterprises--5 Mar 2019
RAJESHREE HEIGHTS - WING AAB DEVELOPERS--5 Apr 2019
SAKET RESIDENCY, PHASE-II, BUILDING-LJALARAM DEVELOPERS--29 Mar 2019
KASTURI FLORIDUSSHIVAAY DEVELOPERS--26 Jun 2019
Sri ResidencyShree Shyamal Enterprise--8 Jul 2019
YOGI MILAN PHASE IVSHIV BUILDERS--1 Oct 2019
GOKHULDHAMDOSHI & MEHTA ASSOCIATES--10 Feb 2020
EKTA COMPLEXEKTA DEVELOPERS--18 Feb 2020
PREMALDEEPGAVLI DEVELOPERS--26 Feb 2020
BLISSPRAMUKH REALTY--16 Jul 2020
YOGI MILAN PLUSSHIV BUILDERS--7 Aug 2020
SHREE VINAYAK INDUSTRIAL ESTATEPARTH INFRA--2 Sep 2020
PALACIO Phase 1TABP Build LLP--20 Sep 2020
EKDANT SANSKRITIKALPSHREE HOMES--25 Sep 2020
SAI NAGAR PHASE2- D,E,F,HDATTAINFINITY--13 Nov 2020
SAMRUDHHI SHOPPING CENTERSHREE NAKODA DEVELOPERS--26 Sep 2020
THE COURTYARD 41 TO 45M/s LIVINGDWELL ENTERPRISE--13 Nov 2020
MANORATH RESIDENCY PHASE-3Krishnakumar Ramsinh Parmar--30 Mar 2021
SHRI GANESH SOCIETYRAKESHKUMAR PATEL--31 Jan 2021
RUDRAKSHRUDRA ENTERPRISES--8 Sep 2021
SWAGATPRAMUKH REALTY--25 Mar 2021
THE MARKET PALLATESEVEN 9 DEVELOPERS--8 Mar 2021
Rajshree Heights Wing-BAB DEVELOPERS--29 May 2021
AKSHAR HEIGHTSMUNIVAR DEVELOPERS--10 Mar 2021
Affordable Housing in Partnership under PMAY U in BaldeviSilvassa Municipal Council--12 Feb 2024
Affordable Housing in Partnership under PMAY U in Ambedkar Nagar Plot No. 54Silvassa Municipal Council--5 Aug 2021
FLORAROYAL ENTERPRISE--18 May 2021
SHRI HARI DARSHAN RESIDENCYSHRI SADGURU DEVELOPERS--3 May 2021
Affordable housing in Partnership under PMAY U in Ambedkar Nagar Plot No. 11Silvassa Municipal Council--15 Aug 2021
HARMONY PHASE 1PRAMUKH REALTY--4 Jun 2021
SIDDHIVINAYAKSHRI SOMNATH ENTERPRISE--15 Oct 2021
PALI CORNERPALI CORNER DEVELOPERS--5 Aug 2021
SHIVALIKSHYAM ASSOCIATE--12 Nov 2021
HORIZON PARKSHAGUN BUILDCON--3 Feb 2022
J C AVENUEUMEDBHAI CHHIBUBHAI PATEL--4 May 2022
ROYAL VIEWM AND P DEVELOPERS--12 May 2022
Sun Avenue B - WingSun Infra--20 Jun 2022
VEDANT SKYJALARAM DEVELOPERS--20 Sep 2022
JC MAHALAXMIJC REALTY ENTERPRISES LLP--20 Sep 2022
MANGALAM HEIGHTSMANGALAM DEVELOPERS--4 Aug 2022
HORIZON RESIDENCY D WINGMAHARANI DEVELOPERS--30 Aug 2022
KALPATARU SKYLINEKALPATARU BUILDCON--7 Feb 2023
SAKET RESIDENCY, PHASE-II, BUILDING-MJALARAM DEVELOPERS--7 Jul 2023
Mangalam SrushtiMangalam Buildcon--5 Apr 2023
SAKET RESIDENCY PHASE - II, BUILDING - NJALARAM DEVELOPERS--31 May 2024
HORIZON GREENSMAGIC RETREAT--2 May 2024
Shaligram C, D wingADITYA ENTERPRISE--31 Jul 2024
Shivam Heights Phase 3KRISHNA ENTERPRISE--25 Nov 2024
Unity HeightsUnity Developers--4 Dec 2024
Planning a launch in Dadra & Nagar Haveli? The area consolidated report packs launches, inventory movement, unit sizes and absorption across the projects you pick into one document. Rs 2,999 for the first project and Rs 1,999 for each additional one. Area report · Rs 2,999 · coming soon  See what is coming

Developers active in Dadra & Nagar Haveli

Pramukh Realty (14), JALARAM DEVELOPERS (7), Shiv Builders (6), MICROMEGA PROJECTS (5), SEVEN - 9 DEVCON LLP (5), DATTAINFINITY (5). Each link opens the promoter's track record built from their own filings.

Frequently asked questions

How do I shortlist among the Dadra & Nagar Haveli projects listed above?

Compare each project against its neighbours, not against the brochure. The median project on this page is 30% booked, which is the benchmark to hold any single project against. A project selling much slower than the district may have a pricing or credibility problem; one selling much faster deserves a look at whether construction is keeping pace with collections. Then open the developer link to check their delivery record on other projects, and compare filed carpet areas rather than super built-up marketing areas.

What does a revised completion date on a Dadra & Nagar Haveli project actually mean?

The promoter has moved their deadline with the regulator, usually under section 6, which allows an extension of up to one year for reasons beyond their control. It does not move the date in your agreement for sale: your section 18 claim for delay interest or refund runs from the possession date you signed for. Before booking a project with a revision on record, ask which approvals or works the new date depends on.

What stamp duty will I pay on a flat in Dadra & Nagar Haveli district?

The rate depends on the local body: roughly 6 to 7 percent inside municipal corporations, 4 percent in municipal council areas and 3 percent in gram panchayat areas, with women buying in their sole name paying 1 percent less. The registration fee is 1 percent of value, capped at Rs 30,000. Duty is charged on the higher of your agreement value and the ready reckoner value. ReraGenie has a free Maharashtra stamp duty calculator under Tools.

What does it mean that some Dadra & Nagar Haveli registrations have lapsed?

A RERA registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then, the registration lapses and the project stops being a registered project: the promoter may not legally market or sell in it, and the Authority can act under section 7 against a defaulting promoter. It does not cancel your agreement for sale or your section 18 rights if you have already booked, and it does not mean construction has stopped. Ask the promoter for the current registration position in writing, and verify it on the MahaRERA portal before you pay any further instalment.

What if a Dadra & Nagar Haveli project shows strong sales but slow construction?

That shape means the promoter is collecting money faster than they are building, which is fine under a disciplined promoter and dangerous under a stretched one. The law helps: withdrawals from the project account need architect, engineer and CA certificates in proportion to progress. Check the promoter's delivery record, and watch the next quarterly filing (due within 20 days of each quarter end) to see whether the construction line moves.

Data from official MahaRERA filings.