ReraGenieLog inGet a buyer report

Home / Browse projects / Dadra & Nagar Haveli / PALLADIUM SQUARE

Completed No litigation declared Mixed project

PALLADIUM SQUARE

By SEVEN - 9 DEVCON LLP

RG-MH-00973 · RERA P49600000125 · Last updated on MahaRERA portal: 21 Jul 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 4 other registrations.

See what the report covers Free either way: or have every new Dadra & Nagar Haveli registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedregistration recorded completed
20 of 22Construction stages doneacross 3 buildings; furthest along: Podiums (if any), 0%
1 of 93Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 135 documents Report an error

PALLADIUM SQUARE is a Mixed project by SEVEN - 9 DEVCON LLP in Dadra & Nagar Haveli, registered with MahaRERA as P49600000125 on 2 Feb 2022. The registration is recorded completed; possession was promised by 31 Dec 2026. 92 of the 93 units on this registration are recorded sold or booked, and 20 of 22 construction stages are filed complete.

At a glance

Project

  • NamePALLADIUM SQUARE
  • TypeMixed
  • Location
    • SURVEY NO. 51/1
    • SILVASSA
    • Others
    • Dadra & Nagar Haveli
    • 396230
  • Pincode396230
  • RERA no.P49600000125
  • ReraGenie IDRG-MH-00973

Builder

  • NameSEVEN - 9 DEVCON LLP
  • Entity typePartnership
  • GSTIN26AEMFS8069P1ZW
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnersVISHAL KISHORBHAI PANCHAL, HARDIK KISHORBHAI PANCHAL
  • Other registrations4 more →
  • Completed1 of 5
  • Declared earlier projects4 →

Key dates

this monthRegisteredFeb 2022PromisedDec 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on2 Feb 2022
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings2 building records
  • Documents filed135 files

Current status

99%92 of 93 units booked

Figures as on 21 Jul 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ANA0029534
BNA00391958

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 21 Jul 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

20 of 22 construction stages are filed complete across 3 buildings. The stage furthest along is Podiums (if any), at 0%.

A91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
B91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
NA Plot Without StructureNot stated
ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 21 Jul 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed52

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots52
Open Space52
BuildingOpen SpaceTotal
A2626
B2626

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,430 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
LALABHAI RAVIYABHAI AHIR AND OTHER-Dadra & Nagar Haveli

Approvals and building plan

Sanctioning authorityVISHAL PANCHAL
Permissible FSI6860.54
Proposed, not sanctioned5,496 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSILVASSA

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectHARDIK PANCHAL
EngineerCHETAN H SAPARIYA
Chartered AccountantYOGESH KOTHARI
Chartered AccountantKUNAL SHAH
Chartered AccountantIshwarlal Chaplot
PartnerRole in project
SEVEN - 9 DEVCON LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 18 Jan 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 13 Jan 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 13 Jan 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 14 Jan 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 14 Jul 2025

Documents filed135

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 135 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2024-2025)File: square FORM -5 Signed.pdf21 Jul 2025
Occupational CertificateFile: OC A-Wing.PDF14 Jul 2025
Occupational CertificateFile: OC ORDER B-Wing.pdf14 Jul 2025
Completion CertificateFile: 01 FORM-4 WING-A SQUARE.PDF14 Jul 2025
Completion CertificateFile: 01 FORM-4 WING-B SQUARE.PDF14 Jul 2025
Form 5 (FY 2021-2022)File: FORM 5 21-22.pdf17 Jun 2025
Form 5 (FY 2022-2023)File: square from 5 2022-23 Signed.pdf17 Jun 2025
Form 5 (FY 2023-2024)File: Square from 5 2023-24 Signed.pdf17 Jun 2025
Form 1File: Architect Certificate.pdf16 Jun 2025
Form 2File: Engineer Certificate.pdf16 Jun 2025
Form 3File: FORM-3(31-3-2023).pdf16 Jun 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold & Booked Inventory.pdf16 Jun 2025
Form 1File: Form 1.pdf16 Jun 2025
Form 2File: Form 2.pdf16 Jun 2025
Form 3File: FORM-3(30-6-2023).pdf16 Jun 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold & Booked Inventory.pdf16 Jun 2025
Form 1File: Form 1 PS.pdf16 Jun 2025
Form 2File: Form 2 PS.pdf16 Jun 2025
Form 3File: Palladium Square form 3 sep 2024.pdf16 Jun 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold & Booked Inventory.pdf16 Jun 2025
Form 1File: 01 PALLADIUM SQUARE FORM 1 (31 12 2023) (R01).PDF16 Jun 2025
Form 2File: 02 PALLADIUM SQUARE FORM 2 (31 12 2023) (R01).PDF16 Jun 2025
Form 3File: FORM-3(31-12-2023).pdf16 Jun 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold & Booked Inventory.pdf16 Jun 2025
Form 1File: Form 1.pdf16 Jun 2025
Form 2File: form 2.pdf16 Jun 2025
Form 3File: Form 3 FY 2023-24 Q4 Signed.pdf16 Jun 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold & Booked inventory.pdf16 Jun 2025
Form 1File: F0RM -1 ARCHITECTS CERTIFICATE ALCOVE JUN 2024.pdf16 Jun 2025
Form 2File: FORM -2 ENGINEERS CERTIFICATE.pdf16 Jun 2025
Form 3File: FORM 3 JUNE 2024 Signed_C.pdf16 Jun 2025
Disclosure of Sold and Booked InventoryFile: Inventory (1).pdf16 Jun 2025
Form 1File: Form 1 Square sep 2024.pdf16 Jun 2025
Form 2File: Form 2 square sep 2024.pdf16 Jun 2025
Form 3File: Palladium Square form Sep 2024 (Kunal Sir)_Signed.pdf16 Jun 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold & Booked Inventory.pdf16 Jun 2025
Form 1File: Square Architect Form 1 Dec-2024.pdf16 Jun 2025
Form 2File: Square Form 2 Dec-2024.pdf16 Jun 2025
Form 3File: Square Signed form 3 Dec 2024.pdf16 Jun 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold & Booked Inventory.pdf16 Jun 2025
Form 1File: FORM-1 SQUARE.PDF16 Jun 2025
Form 2File: FORM-2 SQUARE.PDF16 Jun 2025
Form 3File: Form 3 Square March-2025.pdf16 Jun 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold & Booked Inventory.pdf16 Jun 2025
Form 2A (FY 2021-2022)File: Engineer certificate 2A.pdf16 Jun 2025
Form 2A (FY 2022-2023)File: Quality Certificate.pdf16 Jun 2025
Form 2A (FY 2023-2024)16 Jun 2025
Form 1File: Architect certificate form 1.pdf13 Jun 2025
Form 2File: Engineer certificate form 2.pdf13 Jun 2025
Form 3File: FORM 3.pdf13 Jun 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold & Booked Inventory.pdf13 Jun 2025
Form 1File: Architect Certificate - FOrm 1.PDF13 Jun 2025
Form 2File: Engineer Certificate Form 2.pdf13 Jun 2025
Form 3File: FORM-3.pdf13 Jun 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold & Booked Inventory.pdf13 Jun 2025
Form 1File: Form 1 Architect Certificate.pdf13 Jun 2025
Form 2File: Form 2 Engineer Certificate.pdf13 Jun 2025
Form 3File: Form 3.pdf13 Jun 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold & Booked Inventory.pdf13 Jun 2025
Form 1File: Architect CertificateForm 1.pdf13 Jun 2025
Form 2File: Engineer Certificate Form 2.pdf13 Jun 2025
Form 3File: FORM-3(31-12-2022).pdf13 Jun 2025
Disclosure of Sold and Booked InventoryFile: Disclosure OF Sold & Booked Inventory.pdf13 Jun 2025
Form 2A (FY 2024-2025)9 Jun 2025
Certificates of Architect (Form 1) (UT)(Mandatory for only ongoing project)File: FORM-1 SQUARE_compressed.pdf19 Apr 2025
Certificates of CA (Form 3) (UT)File: Form 3 Square March-2025.pdf19 Apr 2025
Certificates of Engineer (Form 2) (UT) (Mandatory for only ongoing project)File: FORM-2 SQUARE.PDF19 Apr 2025
Form 2AFile: FORM-2A SQUARE.PDF19 Apr 2025
Certificates of Architect (Form 1) (UT)(Mandatory for only ongoing project)File: Form 1 Square sep 2024.pdf1 Mar 2025
Certificates of Architect (Form 1) (UT)(Mandatory for only ongoing project)File: Square Architect Form 1 Dec-2024.pdf1 Mar 2025
Certificates of CA (Form 3) (UT)File: Square Signed form 3 Dec 2024_compressed.pdf1 Mar 2025
Certificates of Engineer (Form 2) (UT) (Mandatory for only ongoing project)File: Form 2 square sep 2024.pdf1 Mar 2025
Certificates of Engineer (Form 2) (UT) (Mandatory for only ongoing project)File: Square Form 2 Dec-2024.pdf1 Mar 2025
Form 2AFile: Form 2A square sep 2024.pdf1 Mar 2025
Form 2AFile: Square Form 2A Dec-2024.pdf1 Mar 2025
Certificates of Architect (Form 1) (UT)(Mandatory for only ongoing project)File: Form 1.pdf27 Feb 2025
Certificates of Architect (Form 1) (UT)(Mandatory for only ongoing project)File: Form 1 june 2024 seven 9 Devcon LLP (1).pdf27 Feb 2025
Certificates of Engineer (Form 2) (UT) (Mandatory for only ongoing project)File: FORM 2.pdf27 Feb 2025
Certificates of Engineer (Form 2) (UT) (Mandatory for only ongoing project)File: Form 2 June 2024 seven 9 Devcon LLP (1).pdf27 Feb 2025
Certificates of CA (Form 3) (UT)File: Square Signed form 3 Dec 2024 Final Signed_compressed.pdf31 Jan 2025

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsRegisteredStatusPromisedDelivered
PALLADIUM ALCOVEP49600000157SILVASSA, Dadra & Nagar Haveli2Jul 2023OngoingDec 2027Jan 1970

How this compares with Dadra & Nagar Haveli

99%of this project is bookeddistrict median 30%
10%of Dadra & Nagar Haveli projects moved their completion datethis one has not
28%of Dadra & Nagar Haveli registrations have lapsed or been cancelledthis one is completed

Computed across the 210+ Dadra & Nagar Haveli projects on ReraGenie, from their own filings.

Keep PALLADIUM SQUARE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near SILVASSA210+ in Dadra & Nagar Haveli

Builder: SEVEN - 9 DEVCON LLP

SEVEN - 9 DEVCON LLP has 5 registrations on MahaRERA, including PALLADIUM SQUARE and PALLADIUM ALCOVE. Its filings disclose 4 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Dadra & Nagar Haveli district page.

Frequently asked questions

What are my rights if PALLADIUM SQUARE is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of PALLADIUM SQUARE?

The registered promoter entity is SEVEN - 9 DEVCON LLP, a partnership as per the filing. Its GSTIN 26AEMFS8069P1ZW can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in PALLADIUM SQUARE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for PALLADIUM SQUARE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at PALLADIUM SQUARE?

The professionals named in the filing: Architect: HARDIK PANCHAL; Engineer: CHETAN H SAPARIYA; Chartered Accountant: YOGESH KOTHARI; Chartered Accountant: KUNAL SHAH; Chartered Accountant: Ishwarlal Chaplot. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in PALLADIUM SQUARE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About PALLADIUM SQUARE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save PALLADIUM SQUARE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.