Home / Browse projects / Dadra & Nagar Haveli / SHREE BALAJI RESIDENCY
SHREE BALAJI RESIDENCY
RG-MH-00532 · RERA P49600000050 · Last updated on MahaRERA portal: 9 Oct 2021
Source: official MahaRERA filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 4 other registrations and every project registered within 2 km.
See what the report covers Free either way: or have every new Dadra & Nagar Haveli registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SHREE BALAJI RESIDENCY is a Residential / Group Housing project by ANAND ASSOCIATES in Dadra & Nagar Haveli, registered with MahaRERA as P49600000050 on 11 Apr 2018. The registration is recorded completed; possession was promised by 30 Dec 2021.
At a glance
Project
- NameSHREE BALAJI RESIDENCY
- TypeResidential / Group Housing
- Location
- AMLI
- BALAJI TOWNSHIP
- Dadra & Nagar Haveli
- 396230
- Pincode396230
- MapView location on Google Maps (as filed on RERA)
- RERA no.P49600000050
- ReraGenie IDRG-MH-00532
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on11 Apr 2018
- Promised completion30 Dec 2021
- Revised completionNone
- Buildings2 building records
- Documents filed29 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| A BUILDING | NA | 6 | 0 | 0 | 0 | 0 |
| B BUILDING | NA | 6 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 9 Oct 2021, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
20 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 0%.
A BUILDING91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
B BUILDING91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 9 Oct 2021, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 100% |
| Open Parking | Yes | 100% |
Parking filed74
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| A BUILDING | 30 | 8 | 38 |
| B BUILDING | 28 | 8 | 36 |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Partner | Role in project |
|---|---|
| ANAND ASSOCIATES | - |
Litigation declared1
| Case | Court | Status |
|---|---|---|
| SCS 83 SLASH 14/2014 | SIVASSA DISTRICT AND SESSIONS COURT | FOR EVIDENCE |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 4 Apr 2018 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 4 Apr 2018 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 4 Apr 2018 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 4 Apr 2018Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed29
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Certificates of CA (Form 5) (UT)File: FORM 5 19_20.pdf | 9 Oct 2021 |
| Certificates of Architect (Form 4) (UTFile: FORM 4OCT 2020.pdf | 26 Dec 2020 |
| Certificates of Architect (Form 1) (UT)(Mandatory for only ongoing project)File: FORM 1_compressed.pdf | 1 Jul 2019 |
| Certificates of Engineer (Form 2) (UT) (Mandatory for only ongoing project)File: FORM 2_compressed.pdf | 1 Jul 2019 |
| Certificates of CA (Form 3) (UT)File: FORM 3_compressed.pdf | 1 Jul 2019 |
| Form 2AFile: FORM 2A_compressed.pdf | 1 Jul 2019 |
| Certificates of Architect (Form 1) (UT)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE.pdf | 31 Mar 2019 |
| Certificates of Engineer (Form 2) (UT) (Mandatory for only ongoing project)File: ENGINEER CERTIFICATE.pdf | 31 Mar 2019 |
| Certificates of CA (Form 3) (UT)File: CA CERTIFICATE.pdf | 31 Mar 2019 |
| Proforma of Allotment letterFile: PROFORMA OF AGREEMENT OF SALE REVISED.pdf | 31 Mar 2019 |
| Certificates of CA (Form 5) (UT)File: FORM 5.pdf | 28 Dec 2018 |
| Certificates of Architect (Form 1) (UT)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE.pdf | 10 Oct 2018 |
| Certificates of Engineer (Form 2) (UT) (Mandatory for only ongoing project)File: ENGINEER CERTF.pdf | 10 Oct 2018 |
| Certificates of CA (Form 3) (UT)File: FORM 3.pdf | 10 Oct 2018 |
| Certificates of CA (Form 5) (UT)File: FORM 3.pdf | 10 Oct 2018 |
| Layout approvalFile: LAYOUT PLAN.pdf | 4 Apr 2018 |
| Building plan approvalFile: BUILDING PLAN.pdf | 4 Apr 2018 |
| PAN CardFile: PAN CARD.pdf | 4 Apr 2018 |
| Copy of the legal title reportFile: TITLE SEARCH CERTIFICATE.pdf | 4 Apr 2018 |
| Details of encumbrancesFile: TITLE SEARCH CERTIFICATE.pdf | 4 Apr 2018 |
| Copy of Layout Approval (in case of layout)File: LAYOUT PLAN.pdf | 4 Apr 2018 |
| Building Plan Approval (IOD)File: BUILDING PLAN.pdf | 4 Apr 2018 |
| Commencement CertificatesFile: COMMENCEMENT CERTIFICATE.pdf | 4 Apr 2018 |
| Declaration in FORM BFile: FORM B.pdf | 4 Apr 2018 |
| Certificates of Architect (Form 1) (UT)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE.pdf | 4 Apr 2018 |
| Certificates of Engineer (Form 2) (UT) (Mandatory for only ongoing project)File: ENGINEER CERTIFIICATE.pdf | 4 Apr 2018 |
| Certificates of CA (Form 3) (UT)File: FORM 3 CA CERTIFICATE.pdf | 4 Apr 2018 |
| Annual Report / Audited Financial Statements for the immediately preceding three financial yearsFile: FINANCIALS OF LAST 3 YEARS.pdf | 4 Apr 2018 |
| Proforma of Allotment letterFile: PROFORMA OF SALE AGREEMENT.pdf | 4 Apr 2018 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| BALAJI RESIDENCY | BALAJI TOWNSHIP PLOT NO 87 92 93 AND 94 SURVEY NO 51 AMLI SILVASSA | 112 | Completed | May 2014 | Late, Feb 2016 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Dadra & Nagar Haveli
Computed across the 210+ Dadra & Nagar Haveli projects on ReraGenie, from their own filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 4 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 29 filed documents as one ZIP, foldered, with a manifest
Keep SHREE BALAJI RESIDENCY on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near BALAJI TOWNSHIP210+ in Dadra & Nagar Haveli
PRAMUKH SHIVANTA
ROYAL ENTERPRISE
SHASHIKALP SAROVAR
AKS BUILDERS AND DEVELOPERES
Ekdant Silver Oak
Ekdant Developers
Nagjua Ananta
MICROMEGA PROJECTS
ROYAL VIEW-II
M & P DEVELOPERS
PARADISE ONE
JMB REALTY
See every Dadra & Nagar Haveli project, with the district possession charts
Builder: ANAND ASSOCIATES
ANAND ASSOCIATES has 5 registrations on MahaRERA, including SHREE BALAJI RESIDENCY and ANAND BLOSSOM. Its filings disclose 2 earlier MahaRERA projects: declares 0 of 2 past projects completed on time. Litigation is declared on 3 of its registrations. Read the full track record. See more projects on the Dadra & Nagar Haveli district page.
Frequently asked questions
What are my rights if SHREE BALAJI RESIDENCY is delayed beyond 30 Dec 2021?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SHREE BALAJI RESIDENCY?
The registered promoter entity is ANAND ASSOCIATES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SHREE BALAJI RESIDENCY?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SHREE BALAJI RESIDENCY?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
What should I check before booking in SHREE BALAJI RESIDENCY?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback