NAKSHATRA C to G
RG-MH-00635 · RERA P49600000069 · Last updated on MahaRERA portal: 10 Oct 2024
Source: official MahaRERA filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
- All 1 earlier projects delivered on promise
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 13 other registrations and every project registered within 2 km.
See what the report covers Free either way: or have every new Dadra & Nagar Haveli registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
NAKSHATRA C to G is a Residential / Group Housing project by Pramukh realty in Dadra & Nagar Haveli, registered with MahaRERA as P49600000069 on 27 Nov 2018. The registration is recorded completed; possession was promised by 30 Oct 2026.
At a glance
Project
- NameNAKSHATRA C to G
- TypeResidential / Group Housing
- Location
- KRISHNA COMPANY ROAD
- SAMARVANI AREA
- Dadra & Nagar Haveli
- 396230
- Pincode396230
- MapView location on Google Maps (as filed on RERA)
- RERA no.P49600000069
- ReraGenie IDRG-MH-00635
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on27 Nov 2018
- Promised completion30 Oct 2026
- Revised completionNone
- Buildings5 building records
- Documents filed56 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| C | NA | 11 | 0 | 0 | 0 | 0 |
| D | NA | 11 | 0 | 0 | 0 | 0 |
| E | NA | 11 | 0 | 0 | 0 | 0 |
| F | NA | 11 | 0 | 0 | 0 | 0 |
| G | NA | 11 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building5
As on 10 Oct 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
50 of 55 construction stages are filed complete across 5 buildings. The stage furthest along is Podiums (if any), at 0%.
C91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
D91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
E91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
F91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
G91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 10 Oct 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | Yes | 100% |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 100% |
| Open Parking | Yes | 100% |
Parking filed166
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Open Space | Total |
|---|---|---|
| C | 37 | 37 |
| D | 37 | 37 |
| E | 24 | 24 |
| F | 31 | 31 |
| G | 37 | 37 |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners1
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | swapnil sopan jagtap |
| Partner | Role in project |
|---|---|
| Pramukh realty | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 17 Oct 2018 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 17 Oct 2018 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 17 Oct 2018 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 17 Oct 2018Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed56
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Nakshatra C to G Form 5.pdf | 10 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Nakshatra C to G Form 5.pdf | 10 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Nakshatra C to G Form 5.pdf | 10 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Nakshatra C to G Form 5.pdf | 10 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Nakshatra C to G Project F Y -2022-23.pdf | 26 Sep 2023 |
| Architect’s Certificate on Completion of Project (Form 4) (UT)File: nakshatra C to G form 4.pdf | 5 Sep 2023 |
| OtherFile: Nakshatra C to G All Building Full OC.pdf | 5 Sep 2023 |
| Certificates of Engineer (Form 2) (UT) (Mandatory for only ongoing project)File: Form 2.pdf | 25 Jul 2023 |
| Certificates of Architect (Form 1) (UT)(Mandatory for only ongoing project)File: Form 1.pdf | 24 Jul 2023 |
| Certificates of CA (Form 3) (UT)File: Form 3.pdf | 24 Jul 2023 |
| Engineers Certificate on Quality Assurance (Form 2A)File: Nakshatra 2A.pdf | 24 Jul 2023 |
| OtherFile: E F OC.pdf | 14 Jun 2023 |
| OtherFile: D OC.pdf | 14 Jun 2023 |
| OtherFile: Nakshatra C to G Project Closure Letter.pdf | 14 Jun 2023 |
| Certificates of Engineer (Form 2) (UT) (Mandatory for only ongoing project)File: NAK FORM 2.pdf | 2 Jun 2023 |
| Certificates of CA (Form 3) (UT)File: NAK FORM 3.pdf | 31 May 2023 |
| Certificates of Architect (Form 1) (UT)(Mandatory for only ongoing project)File: NAK FORM 1.pdf | 9 May 2023 |
| Certificates of CA (Form 5) (UT)File: form 5 21 22.pdf | 15 Nov 2022 |
| Engineers Certificate on Quality Assurance (Form 2A)File: NAK CTOG 2ND 2223.pdf | 8 Oct 2022 |
| OtherFile: nakshatra society reg certificate.pdf | 30 Aug 2022 |
| Engineers Certificate on Quality Assurance (Form 2A)File: NAK CTOG 1ST 2223.pdf | 20 Jul 2022 |
| OtherFile: oc nakshatra C.pdf | 28 Feb 2022 |
| CERSAI detailsFile: CERSAI_Search_Report_200225047364_For_Asset_Based_Search_01_12_2021_12_01_13_104.pdf | 1 Dec 2021 |
| Certificates of CA (Form 5) (UT)File: NAKSHATRA (C to G).pdf | 21 Oct 2021 |
| OtherFile: nakshatra G bldg OC.pdf | 26 Aug 2021 |
| Proforma of Allotment letterFile: AFS C TO G FOR RERA_compressed.pdf | 20 Feb 2021 |
| Proforma of Allotment letterFile: AFS NAK C to G FINAL AS ON FEB-21.pdf | 16 Feb 2021 |
| Certificates of CA (Form 5) (UT)File: NAKSHATRA-C TO G FORM-5 YEAR 19-20.pdf | 7 Jan 2021 |
| Certificates of CA (Form 5) (UT)File: FORM 5 NAKSHATRA C TO G 310319.pdf | 24 Oct 2019 |
| Proforma of Allotment letterFile: nakshatra phase2 afs.pdf | 22 Nov 2018 |
| Declaration in FORM BFile: Nakshatra Ph2 Form B.pdf | 26 Oct 2018 |
| Certificates of CA (Form 3) (UT)File: nakshatra phase 2 ca form 3.pdf | 26 Oct 2018 |
| Certificates of Architect (Form 1) (UT)(Mandatory for only ongoing project)File: nakshatra C TO H architects certificate.pdf | 19 Oct 2018 |
| Certificates of Engineer (Form 2) (UT) (Mandatory for only ongoing project)File: nakshatra C to H engineers certificate.pdf | 19 Oct 2018 |
| Proforma of Allotment letterFile: nakshatra phase 2 allotment letter.pdf | 19 Oct 2018 |
| Layout approvalFile: layout plan plan.pdf | 17 Oct 2018 |
| Building plan approvalFile: Temp00802_3.pdf | 17 Oct 2018 |
| Building plan approvalFile: Temp00803_4.pdf | 17 Oct 2018 |
| Building plan approvalFile: Temp00804_5.pdf | 17 Oct 2018 |
| Building plan approvalFile: Temp00805_6.pdf | 17 Oct 2018 |
| Building plan approvalFile: Temp00806_7.pdf | 17 Oct 2018 |
| Building plan approvalFile: Temp00807_8.pdf | 17 Oct 2018 |
| PAN CardFile: PAN CARD.pdf | 17 Oct 2018 |
| Copy of the legal title reportFile: TCR.pdf | 17 Oct 2018 |
| Details of encumbrancesFile: encumbrance certificate.pdf | 17 Oct 2018 |
| Copy of Layout Approval (in case of layout)File: layout plan plan.pdf | 17 Oct 2018 |
| Building Plan Approval (IOD)File: Temp00802_3.pdf | 17 Oct 2018 |
| Building Plan Approval (IOD)File: Temp00803_4.pdf | 17 Oct 2018 |
| Building Plan Approval (IOD)File: Temp00804_5.pdf | 17 Oct 2018 |
| Building Plan Approval (IOD)File: Temp00805_6.pdf | 17 Oct 2018 |
| Building Plan Approval (IOD)File: Temp00806_7.pdf | 17 Oct 2018 |
| Building Plan Approval (IOD)File: Temp00807_8.pdf | 17 Oct 2018 |
| Commencement CertificatesFile: Comencement Certificate.pdf | 17 Oct 2018 |
| Annual Report / Audited Financial Statements for the immediately preceding three financial yearsFile: AUDIT REPORT 15 16.pdf | 17 Oct 2018 |
| Annual Report / Audited Financial Statements for the immediately preceding three financial yearsFile: AUDIT REPORT 16 17.pdf | 17 Oct 2018 |
| Annual Report / Audited Financial Statements for the immediately preceding three financial yearsFile: AUDIT REPORT 17 18.pdf | 17 Oct 2018 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| PRAMUKH SNEH | SAMARVARNI DADRA NAGAR HAVELI | 250 | Completed | Dec 2018 | Oct 2018 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Dadra & Nagar Haveli
Computed across the 210+ Dadra & Nagar Haveli projects on ReraGenie, from their own filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 13 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 56 filed documents as one ZIP, foldered, with a manifest
Keep NAKSHATRA C to G on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near SAMARVANI AREA210+ in Dadra & Nagar Haveli
Filed coordinates, straight-line distance. 42 registered projects within 2 km.
PRAMUKH SHIVANTA
ROYAL ENTERPRISE
SHASHIKALP SAROVAR
AKS BUILDERS AND DEVELOPERES
Ekdant Silver Oak
Ekdant Developers
Nagjua Ananta
MICROMEGA PROJECTS
ROYAL VIEW-II
M & P DEVELOPERS
PARADISE ONE
JMB REALTY
See every Dadra & Nagar Haveli project, with the district possession charts
Builder: Pramukh realty
Pramukh Realty has 14 registrations on MahaRERA, including Pramukh Sneh Phase 2 and Nakshatra A-B. Its filings disclose 5 earlier MahaRERA projects: declares 5 of 5 past projects completed on time. Read the full track record. See more projects on the Dadra & Nagar Haveli district page.
Frequently asked questions
What are my rights if NAKSHATRA C to G is delayed beyond 30 Oct 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of NAKSHATRA C to G?
The registered promoter entity is Pramukh realty, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in NAKSHATRA C to G?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for NAKSHATRA C to G?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at NAKSHATRA C to G?
The professionals named in the filing: Architect: swapnil sopan jagtap. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in NAKSHATRA C to G?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback