Home / Browse projects / Dadra & Nagar Haveli / THE GRANDE VILLA
THE GRANDE VILLA
RG-MH-00929 · RERA P49600000114 · Last updated on MahaRERA portal: 13 Feb 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.
See what the report covers Free either way: or have every new Dadra & Nagar Haveli registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
THE GRANDE VILLA is a Residential / Group Housing project by GRAYSCALE ARCHITECTS in Dadra & Nagar Haveli, registered with MahaRERA as P49600000114 on 10 Aug 2021. Possession is promised by 31 Dec 2026. 17 of the 17 units on this registration are recorded sold or booked, and 187 of 187 construction stages are filed complete.
At a glance
Project
- NameTHE GRANDE VILLA
- TypeResidential / Group Housing
- Location
- BEHIND SILVASSA COURT
- SILVASSA
- Others
- Dadra & Nagar Haveli
- 396230
- Pincode396230
- MapView location on Google Maps (as filed on RERA)
- RERA no.P49600000114
- ReraGenie IDRG-MH-00929
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on10 Aug 2021
- Promised completion31 Dec 2026
- Revised completionNone
- Buildings17 building records
- Documents filed147 files
Current status
Figures as on 13 Feb 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| ROW HOUSE NO 01 | NA | 4 | 1 | 1 | 0 | 1 |
| ROW HOUSE NO 02 | NA | 4 | 1 | 1 | 0 | 1 |
| ROW HOUSE NO 03 | NA | 4 | 1 | 1 | 0 | 1 |
| ROW HOUSE NO 04 | NA | 4 | 1 | 1 | 0 | 1 |
| ROW HOUSE NO 05 | NA | 4 | 1 | 1 | 0 | 1 |
| ROW HOUSE NO 07 | NA | 4 | 1 | 1 | 0 | 1 |
| ROW HOUSE NO 08 | NA | 4 | 1 | 1 | 0 | 1 |
| ROW HOUSE NO 09 | NA | 4 | 1 | 1 | 0 | 1 |
| ROW HOUSE NO 10 | NA | 4 | 1 | 1 | 0 | 1 |
| ROW HOUSE NO 11 | NA | 4 | 1 | 1 | 0 | 1 |
| ROW HOUSE NO 12 | NA | 4 | 1 | 1 | 0 | 1 |
| ROW HOUSE NO 13 | NA | 4 | 1 | 1 | 0 | 1 |
| ROW HOUSE NO 14 | NA | 3 | 1 | 1 | 0 | 1 |
| ROW HOUSE NO 15 | NA | 3 | 1 | 1 | 0 | 1 |
| ROW HOUSE NO 16 | NA | 3 | 1 | 1 | 0 | 1 |
| ROW HOUSE NO 17 | NA | 3 | 1 | 1 | 0 | 1 |
| ROW HOUSE NO 18 | NA | 3 | 1 | 1 | 0 | 1 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building17
As on 13 Feb 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
187 of 187 construction stages are filed complete across 17 buildings.
ROW HOUSE NO 01100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
ROW HOUSE NO 02100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
ROW HOUSE NO 03100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
ROW HOUSE NO 04100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
ROW HOUSE NO 05100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
ROW HOUSE NO 07100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
ROW HOUSE NO 08100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
ROW HOUSE NO 09100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
ROW HOUSE NO 10100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
ROW HOUSE NO 11100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
ROW HOUSE NO 12100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
ROW HOUSE NO 13100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
ROW HOUSE NO 14100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
ROW HOUSE NO 15100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
ROW HOUSE NO 16100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
ROW HOUSE NO 17100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
ROW HOUSE NO 18100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 13 Feb 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed17
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| ROW HOUSE NO 01 | 1 | 1 |
| ROW HOUSE NO 02 | 1 | 1 |
| ROW HOUSE NO 03 | 1 | 1 |
| ROW HOUSE NO 04 | 1 | 1 |
| ROW HOUSE NO 05 | 1 | 1 |
| ROW HOUSE NO 07 | 1 | 1 |
| ROW HOUSE NO 08 | 1 | 1 |
| ROW HOUSE NO 09 | 1 | 1 |
| ROW HOUSE NO 10 | 1 | 1 |
| ROW HOUSE NO 11 | 1 | 1 |
| ROW HOUSE NO 12 | 1 | 1 |
| ROW HOUSE NO 13 | 1 | 1 |
| ROW HOUSE NO 14 | 1 | 1 |
| ROW HOUSE NO 15 | 1 | 1 |
| ROW HOUSE NO 16 | 1 | 1 |
| ROW HOUSE NO 17 | 1 | 1 |
| ROW HOUSE NO 18 | 1 | 1 |
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| MAHESHBHAI GAJUBHAI PATEL | - | Dadra & Nagar Haveli |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| - | NA | Rs 60.00 lakh | Rs 60.00 lakh |
| ROW HOUSE NO 01 | NA | Rs 22.00 lakh | Rs 22.00 lakh |
| ROW HOUSE NO 02 | NA | Rs 22.00 lakh | Rs 22.00 lakh |
| ROW HOUSE NO 03 | NA | Rs 22.00 lakh | Rs 22.00 lakh |
| ROW HOUSE NO 04 | NA | Rs 22.00 lakh | Rs 22.00 lakh |
| ROW HOUSE NO 05 | NA | Rs 22.00 lakh | Rs 22.00 lakh |
| ROW HOUSE NO 07 | NA | Rs 22.00 lakh | Rs 22.00 lakh |
| ROW HOUSE NO 08 | NA | Rs 22.00 lakh | Rs 22.00 lakh |
| ROW HOUSE NO 09 | NA | Rs 22.00 lakh | Rs 22.00 lakh |
| ROW HOUSE NO 10 | NA | Rs 22.00 lakh | Rs 22.00 lakh |
| ROW HOUSE NO 11 | NA | Rs 22.00 lakh | Rs 22.00 lakh |
| ROW HOUSE NO 12 | NA | Rs 22.00 lakh | Rs 22.00 lakh |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | MALIKARJUN AMBEGAVE |
| Architect | RIYAZ JIVANI |
| Engineer | DIXANT H RIBADIA |
| Chartered Accountant | KUNAL B SHAH |
| Chartered Accountant | SAGAR ODHAVJI WAGHELA |
| Partner | Role in project |
|---|---|
| GRAYSCALE ARCHITECTS | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 29 Jul 2021 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 29 Jul 2021 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 24 Jul 2021 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 29 Jul 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2026
Documents filed147
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 147 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: FORM 1 MAR 2024.pdf | 13 Feb 2026 |
| Withdrawal Update Form 1File: FORM 1 MAR 2024.pdf | 13 Feb 2026 |
| Withdrawal Update Form 1File: FORM 1 MAR 2024.pdf | 13 Feb 2026 |
| Withdrawal Update Form 2File: FORM 2 MAR 2024.pdf | 13 Feb 2026 |
| Withdrawal Update Form 2File: FORM 2 MAR 2024.pdf | 13 Feb 2026 |
| Withdrawal Update Form 2File: FORM 2 MAR 2024.pdf | 13 Feb 2026 |
| Withdrawal Update Form 3File: FORM 3 MAR 2024.pdf | 13 Feb 2026 |
| Withdrawal Update Form 3File: FORM 3 MAR 2024.pdf | 13 Feb 2026 |
| Withdrawal Update Form 3File: FORM 3 MAR 2024.pdf | 13 Feb 2026 |
| Engineers Certificate on Quality Assurance (Form 2A)File: Form 2A mar 2024.pdf | 20 Feb 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 21-22.pdf | 20 Feb 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 22-23.pdf | 20 Feb 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 23-24.pdf | 20 Feb 2025 |
| Certificates of Architect (Form 1) (UT)(Mandatory for only ongoing project)File: FORM 1 JUNE 2023.pdf | 31 Jan 2025 |
| Certificates of Architect (Form 1) (UT)(Mandatory for only ongoing project)File: FORM 1 SEPT 2023.pdf | 31 Jan 2025 |
| Certificates of Architect (Form 1) (UT)(Mandatory for only ongoing project)File: FORM 1 SEPT 2023.pdf | 31 Jan 2025 |
| Certificates of Architect (Form 1) (UT)(Mandatory for only ongoing project)File: FORM 1 DEC 2023.pdf | 31 Jan 2025 |
| Certificates of Architect (Form 1) (UT)(Mandatory for only ongoing project)File: FORM 1 MAR 2024.pdf | 31 Jan 2025 |
| Certificates of Architect (Form 1) (UT)(Mandatory for only ongoing project)File: FORM 1 MAR 2023.pdf | 31 Jan 2025 |
| Certificates of CA (Form 3) (UT)File: FORM 3 MAR 2024.pdf | 31 Jan 2025 |
| Certificates of CA (Form 3) (UT)File: FORM 3 DEC 2023.pdf | 31 Jan 2025 |
| Certificates of CA (Form 3) (UT)File: FORM 3 SEPT 2023.pdf | 31 Jan 2025 |
| Certificates of CA (Form 3) (UT)File: FORM 3 SEPT 2023.pdf | 31 Jan 2025 |
| Certificates of CA (Form 3) (UT)File: FORM 3 JUNE 2023.pdf | 31 Jan 2025 |
| Certificates of CA (Form 3) (UT)File: FORM 3 MAR 2023.pdf | 31 Jan 2025 |
| Certificates of Engineer (Form 2) (UT) (Mandatory for only ongoing project)File: FORM 2 MAR 2023.pdf | 31 Jan 2025 |
| Certificates of Engineer (Form 2) (UT) (Mandatory for only ongoing project)File: FORM 2 JUNE 2023.pdf | 31 Jan 2025 |
| Certificates of Engineer (Form 2) (UT) (Mandatory for only ongoing project)File: FORM 2 SEPT 2023.pdf | 31 Jan 2025 |
| Certificates of Engineer (Form 2) (UT) (Mandatory for only ongoing project)File: FORM 2 SEPT 2023.pdf | 31 Jan 2025 |
| Certificates of Engineer (Form 2) (UT) (Mandatory for only ongoing project)File: FORM 2 DEC 2023.pdf | 31 Jan 2025 |
| Certificates of Engineer (Form 2) (UT) (Mandatory for only ongoing project)File: FORM 2 MAR 2024.pdf | 31 Jan 2025 |
| Certificates of Architect (Form 1) (UT)(Mandatory for only ongoing project)File: FORM 1 SEPT 2021.pdf | 23 Jun 2023 |
| Certificates of Architect (Form 1) (UT)(Mandatory for only ongoing project)File: FORM 1 DEC 2021.pdf | 23 Jun 2023 |
| Certificates of Architect (Form 1) (UT)(Mandatory for only ongoing project)File: FORM 1 MAR 2022.pdf | 23 Jun 2023 |
| Certificates of Architect (Form 1) (UT)(Mandatory for only ongoing project)File: FORM 1 JUNE 2022.pdf | 23 Jun 2023 |
| Certificates of Architect (Form 1) (UT)(Mandatory for only ongoing project)File: FORM 1 SEPT 2022.pdf | 23 Jun 2023 |
| Certificates of Architect (Form 1) (UT)(Mandatory for only ongoing project)File: FORM 1 DEC 2022.pdf | 23 Jun 2023 |
| Certificates of Engineer (Form 2) (UT) (Mandatory for only ongoing project)File: 30-09-2021 ER CERTIFIACTE.pdf | 23 Jun 2023 |
| Certificates of Engineer (Form 2) (UT) (Mandatory for only ongoing project)File: 31-12-2021 ER CERTIFIACTE.pdf | 23 Jun 2023 |
| Certificates of Engineer (Form 2) (UT) (Mandatory for only ongoing project)File: 31-03-2022 ER CERTIFIACTE.pdf | 23 Jun 2023 |
| Certificates of Engineer (Form 2) (UT) (Mandatory for only ongoing project)File: 30-06-2022 ER CERTIFIACTE.pdf | 23 Jun 2023 |
| Certificates of Engineer (Form 2) (UT) (Mandatory for only ongoing project)File: 30-09-2022 ER CERTIFIACTE.pdf | 23 Jun 2023 |
| Certificates of Engineer (Form 2) (UT) (Mandatory for only ongoing project)File: 31-12-2022 ER CERTIFIACTE.pdf | 23 Jun 2023 |
| Certificates of CA (Form 3) (UT)File: FORM 3 SEPT 2021.pdf | 23 Jun 2023 |
| Certificates of CA (Form 3) (UT)File: FORM 3 DEC 2021.pdf | 23 Jun 2023 |
| Certificates of CA (Form 3) (UT)File: FORM 3 MAR 2022.pdf | 23 Jun 2023 |
| Certificates of CA (Form 3) (UT)File: FORM 3 JUNE 2022.pdf | 23 Jun 2023 |
| Certificates of CA (Form 3) (UT)File: FORM 3 SEPT 2022.pdf | 23 Jun 2023 |
| Certificates of CA (Form 3) (UT)File: FORM 3 DEC 2022.pdf | 23 Jun 2023 |
| Layout approvalFile: plot - 11_compressed.pdf | 29 Jul 2021 |
| Copy of the legal title reportFile: TR.pdf | 29 Jul 2021 |
| Copy of Layout Approval (in case of layout)File: plot - 11_compressed.pdf | 29 Jul 2021 |
| Commencement CertificatesFile: certificate.pdf | 29 Jul 2021 |
| Commencement CertificatesFile: plot - 01_compressed (1).pdf | 29 Jul 2021 |
| Commencement CertificatesFile: plot - 02_compressed.pdf | 29 Jul 2021 |
| Commencement CertificatesFile: plot - 03_compressed.pdf | 29 Jul 2021 |
| Commencement CertificatesFile: plot - 04_compressed.pdf | 29 Jul 2021 |
| Commencement CertificatesFile: plot - 05_compressed.pdf | 29 Jul 2021 |
| Commencement CertificatesFile: plot - 07_compressed.pdf | 29 Jul 2021 |
| Commencement CertificatesFile: plot - 08_compressed.pdf | 29 Jul 2021 |
| Commencement CertificatesFile: plot - 09_compressed.pdf | 29 Jul 2021 |
| Commencement CertificatesFile: plot - 10_compressed.pdf | 29 Jul 2021 |
| Commencement CertificatesFile: plot - 12_compressed.pdf | 29 Jul 2021 |
| Commencement CertificatesFile: plot - 13_compressed.pdf | 29 Jul 2021 |
| Commencement CertificatesFile: plot - 14_compressed.pdf | 29 Jul 2021 |
| Commencement CertificatesFile: plot - 15_compressed.pdf | 29 Jul 2021 |
| Commencement CertificatesFile: plot - 16_compressed.pdf | 29 Jul 2021 |
| Commencement CertificatesFile: plot - 17_compressed.pdf | 29 Jul 2021 |
| Commencement CertificatesFile: plot - 18_compressed.pdf | 29 Jul 2021 |
| Layout approvalFile: plot - 01_compressed.pdf | 24 Jul 2021 |
| Layout approvalFile: plot - 02_compressed.pdf | 24 Jul 2021 |
| Building plan approvalFile: plot - 01_compressed.pdf | 24 Jul 2021 |
| Building plan approvalFile: plot - 02_compressed.pdf | 24 Jul 2021 |
| Building plan approvalFile: plot - 03_compressed.pdf | 24 Jul 2021 |
| Building plan approvalFile: plot - 04_compressed.pdf | 24 Jul 2021 |
| Building plan approvalFile: plot - 05_compressed.pdf | 24 Jul 2021 |
| Building plan approvalFile: plot - 07_compressed.pdf | 24 Jul 2021 |
| Building plan approvalFile: plot - 08_compressed.pdf | 24 Jul 2021 |
| Building plan approvalFile: plot - 09_compressed.pdf | 24 Jul 2021 |
| Building plan approvalFile: plot - 10_compressed.pdf | 24 Jul 2021 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| INFINITY SAPPHIREP49600000177 | SILVASSA, Dadra & Nagar Haveli | 40 | Mar 2025 | Ongoing | Dec 2028 | Not due yet |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Dadra & Nagar Haveli
Computed across the 210+ Dadra & Nagar Haveli projects on ReraGenie, from their own filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 147 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep THE GRANDE VILLA on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near SILVASSA210+ in Dadra & Nagar Haveli
Filed coordinates, straight-line distance. 69 registered projects within 2 km.
PRAMUKH SHIVANTA
ROYAL ENTERPRISE
SHASHIKALP SAROVAR
AKS BUILDERS AND DEVELOPERES
Ekdant Silver Oak
Ekdant Developers
Nagjua Ananta
MICROMEGA PROJECTS
ROYAL VIEW-II
M & P DEVELOPERS
PARADISE ONE
JMB REALTY
See every Dadra & Nagar Haveli project, with the district possession charts
Builder: GRAYSCALE ARCHITECTS
GRAYSCALE ARCHITECTS has 2 registrations on MahaRERA, including THE GRANDE VILLA and INFINITY SAPPHIRE. Its filings disclose 2 earlier MahaRERA projects: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Dadra & Nagar Haveli district page.
Frequently asked questions
What are my rights if THE GRANDE VILLA is delayed beyond 31 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of THE GRANDE VILLA?
The registered promoter entity is GRAYSCALE ARCHITECTS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in THE GRANDE VILLA?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for THE GRANDE VILLA?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at THE GRANDE VILLA?
The professionals named in the filing: Architect: MALIKARJUN AMBEGAVE; Architect: RIYAZ JIVANI; Engineer: DIXANT H RIBADIA; Chartered Accountant: KUNAL B SHAH; Chartered Accountant: SAGAR ODHAVJI WAGHELA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in THE GRANDE VILLA?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback