Home / Browse projects / Dadra & Nagar Haveli / PRAMUKH GARDENS-2
PRAMUKH GARDENS-2
RG-MH-00957 · RERA P49600000122 · Last updated on MahaRERA portal: 18 Apr 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- All 1 earlier projects delivered on promise
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 13 other registrations and every project registered within 2 km.
See what the report covers Free either way: or have every new Dadra & Nagar Haveli registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
PRAMUKH GARDENS-2 is a Residential / Group Housing project by PRAMUKH REALTY in Dadra & Nagar Haveli, registered with MahaRERA as P49600000122 on 22 Nov 2021. Possession is promised by 31 Dec 2027. 165 of the 172 units on this registration are recorded sold or booked, and 48 of 55 construction stages are filed complete.
At a glance
Project
- NamePRAMUKH GARDENS-2
- TypeResidential / Group Housing
- Location
- Kilvani naka road
- Nr. Dokmardi Bridge
- Dadra & Nagar Haveli
- 396230
- Pincode396230
- MapView location on Google Maps (as filed on RERA)
- RERA no.P49600000122
- ReraGenie IDRG-MH-00957
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on22 Nov 2021
- Promised completion31 Dec 2027
- Revised completionNone
- Buildings5 building records
- Documents filed86 files
Current status
Figures as on 18 Apr 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| A | NA | 12 | 8 | 32 | 0 | 32 |
| B | NA | 12 | 8 | 32 | 0 | 32 |
| C | NA | 11 | 0 | 36 | 0 | 36 |
| D | NA | 13 | 0 | 36 | 0 | 36 |
| E | NA | 13 | 0 | 36 | 0 | 36 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building5
As on 18 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
48 of 55 construction stages are filed complete across 5 buildings. The stage furthest along is Podiums (if any), at 0%.
A91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
B91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
C73%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
D91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
E91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 18 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 95% |
| Street Lighting | Yes | 95% |
| Community Buildings | Yes | 90% |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 95% |
| Open Parking | Yes | 90% |
Parking filed85
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| A | 1 | 20 | 21 |
| B | 1 | 15 | 16 |
| C | 1 | 20 | 21 |
| D | 1 | 15 | 16 |
| E | 1 | 10 | 11 |
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| A | NA | Rs 16.21 cr | Rs 17.08 cr |
| B | NA | Rs 16.21 cr | Rs 17.08 cr |
| - | NA | Rs 14.12 cr | Rs 13.21 cr |
| D | NA | Rs 12.50 cr | Rs 13.37 cr |
| E | NA | Rs 12.50 cr | Rs 13.37 cr |
| C | NA | Rs 10.88 cr | Rs 11.61 cr |
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Paradava Design Consultants |
| Engineer | Abhishek Golcha |
| Chartered Accountant | D.K. LAKHANI & CO |
| Partner | Role in project |
|---|---|
| PRAMUKH REALTY | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 18 Nov 2021 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 9 Oct 2021 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 9 Oct 2021 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 9 Oct 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2027
Documents filed86
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 86 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: FORM 1 PG-2.pdf | 18 Apr 2026 |
| Withdrawal Update Form 2File: FORM 2 PG 2.pdf | 18 Apr 2026 |
| Withdrawal Update Form 3File: FORM 3 PGS 2.pdf | 18 Apr 2026 |
| Withdrawal Update Form 1File: FORM 1 PGs 2.pdf | 20 Jan 2026 |
| Withdrawal Update Form 2File: Form 2 PGS 2.pdf | 20 Jan 2026 |
| Withdrawal Update Form 3File: PGs2 FORM 3_SIGNATURE.pdf | 20 Jan 2026 |
| Withdrawal Update Form 1File: FORM 1 PGS 2 OK.pdf | 18 Oct 2025 |
| Withdrawal Update Form 2File: FORM 2 PGS 2 OK.pdf | 18 Oct 2025 |
| Withdrawal Update Form 3File: Pramuk Reality PG-2.pdf | 18 Oct 2025 |
| Form 5 (FY 2024-2025)File: Signed PGS 2 Form 5.pdf | 14 Oct 2025 |
| Withdrawal Update Form 1File: WITHDRAWAL FORM 1.pdf | 2 Aug 2025 |
| Withdrawal Update Form 1File: WITHDRAWAL FORM 1.pdf | 2 Aug 2025 |
| Withdrawal Update Form 2File: Rera Form-2 June 2025 PGS-2 1.pdf | 2 Aug 2025 |
| Withdrawal Update Form 2File: Rera Form-2 June 2025 PGS-2 1.pdf | 2 Aug 2025 |
| Withdrawal Update Form 3File: Pramukh Garden - 2 Withdrawal Application Form3 SIGN.pdf | 2 Aug 2025 |
| Withdrawal Update Form 3File: Pramukh Garden - 2 Withdrawal Application Form3 SIGN.pdf | 2 Aug 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1) (UT)File: FORM 1 PGs-2.pdf | 24 Apr 2025 |
| Certificates of CA (Form 3) (UT)File: FORM 3 PGs-2.pdf | 24 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2) (UT)File: FORM 2 PGs-2.pdf | 24 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A)File: Form 2A Pgs-2.pdf | 24 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1) (UT)File: PGs-2 FORM 1.pdf | 25 Jan 2025 |
| Certificates of CA (Form 3) (UT)File: PGs-2 FORM 3.pdf | 25 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2) (UT)File: PGs-2 FORM 2.pdf | 25 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A)File: PGs-2 FORM 2A.pdf | 25 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1) (UT)File: Form 1 PGs-2.pdf | 18 Oct 2024 |
| Certificates of CA (Form 3) (UT)File: Form 3 PGs 2.pdf | 18 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2) (UT)File: Form 2 PGs-2.pdf | 18 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A)File: Form 2A PGs.pdf | 18 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: PG 2 Form 5.pdf | 10 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1) (UT)File: PG-2 Form 1.pdf | 19 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2) (UT)File: PG-2 Form 2.pdf | 19 Jul 2024 |
| Certificates of CA (Form 3) (UT)File: PG2 Form 3.pdf | 19 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A)File: PG 2- 2A.pdf | 19 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1) (UT)File: PG2 Form 1.pdf | 20 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2) (UT)File: PG2 Form 2.pdf | 20 Apr 2024 |
| Certificates of CA (Form 3) (UT)File: PG2 Form 3.pdf | 20 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A)File: PG2 Form 2A.pdf | 20 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1) (UT)File: FORM 1 PGS 2 DEC 2023.pdf | 19 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2) (UT)File: FORM 2 PGS 2 DEC 2023.pdf | 19 Jan 2024 |
| Certificates of CA (Form 3) (UT)File: FORM 3 PGS2 DEC 2023_compressed.pdf | 19 Jan 2024 |
| Engineers Certificate on Quality Assurance (Form 2A)File: 2A PG2.pdf | 19 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1) (UT)File: Form 1 PGS2 Sep 23.pdf | 27 Nov 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2) (UT)File: Form 2 PGS2 Sep23.pdf | 27 Nov 2023 |
| Certificates of CA (Form 3) (UT)File: Form 3 PR PGS2 Sep 23.pdf | 27 Nov 2023 |
| Engineers Certificate on Quality Assurance (Form 2A)File: 2nd quarter PG2 2A.pdf | 27 Nov 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 PGS2 Project F Y -2022-23.pdf | 26 Sep 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1) (UT)File: Form 1.pdf | 28 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2) (UT)File: PG-2 FORM 2.pdf | 28 Jul 2023 |
| Certificates of CA (Form 3) (UT)File: form 3.pdf | 28 Jul 2023 |
| Engineers Certificate on Quality Assurance (Form 2A)File: pg2 2A.pdf | 28 Jul 2023 |
| Certificates of CA (Form 3) (UT)File: PGS2 FORM 3.PDF | 10 May 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1) (UT)File: PGS2 FORM 1.pdf | 9 May 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2) (UT)File: PGS2 FORM 2.pdf | 9 May 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: form 5 21 22.pdf | 15 Nov 2022 |
| Engineers Certificate on Quality Assurance (Form 2A)File: PGS2 2ND 2223.pdf | 8 Oct 2022 |
| Engineers Certificate on Quality Assurance (Form 2A)File: PGS2 1ST 2223.pdf | 20 Jul 2022 |
| Proforma of Allotment letterFile: AFS PG2 30112021.pdf | 1 Dec 2021 |
| Copy of the legal title reportFile: pgs2 title.pdf | 18 Nov 2021 |
| Certificates of CA (Form 3) (UT)File: form 3.PDF | 12 Oct 2021 |
| Details of encumbrancesFile: Encumbrances.pdf | 11 Oct 2021 |
| Declaration in FORM BFile: FORM B.pdf | 11 Oct 2021 |
| Proforma of Allotment letterFile: ALLOTMENT LETTER.pdf | 11 Oct 2021 |
| Proforma of Allotment letterFile: AFS.pdf | 11 Oct 2021 |
| OtherFile: FORMATE D.pdf | 11 Oct 2021 |
| Layout approvalFile: 1 LAYOUT.pdf | 9 Oct 2021 |
| Building plan approvalFile: 3.pdf | 9 Oct 2021 |
| Building plan approvalFile: 4.pdf | 9 Oct 2021 |
| Building plan approvalFile: 5.pdf | 9 Oct 2021 |
| Building plan approvalFile: 7.pdf | 9 Oct 2021 |
| Building plan approvalFile: 9.pdf | 9 Oct 2021 |
| Building plan approvalFile: 11.pdf | 9 Oct 2021 |
| Building plan approvalFile: 13.pdf | 9 Oct 2021 |
| Copy of Layout Approval (in case of layout)File: 1 LAYOUT.pdf | 9 Oct 2021 |
| Building Plan Approval (IOD)File: 3.pdf | 9 Oct 2021 |
| Building Plan Approval (IOD)File: 4.pdf | 9 Oct 2021 |
| Building Plan Approval (IOD)File: 5.pdf | 9 Oct 2021 |
| Building Plan Approval (IOD)File: 7.pdf | 9 Oct 2021 |
| Building Plan Approval (IOD)File: 9.pdf | 9 Oct 2021 |
| Building Plan Approval (IOD)File: 11.pdf | 9 Oct 2021 |
| Building Plan Approval (IOD)File: 13.pdf | 9 Oct 2021 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| PRAMUKH SNEH | SAMARVANI | 253 | Completed | Dec 2018 | Sep 2018 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Dadra & Nagar Haveli
Computed across the 210+ Dadra & Nagar Haveli projects on ReraGenie, from their own filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 13 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 86 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep PRAMUKH GARDENS-2 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Nr. Dokmardi Bridge210+ in Dadra & Nagar Haveli
Filed coordinates, straight-line distance. 61 registered projects within 2 km.
PRAMUKH SHIVANTA
ROYAL ENTERPRISE
SHASHIKALP SAROVAR
AKS BUILDERS AND DEVELOPERES
Ekdant Silver Oak
Ekdant Developers
Nagjua Ananta
MICROMEGA PROJECTS
ROYAL VIEW-II
M & P DEVELOPERS
PARADISE ONE
JMB REALTY
See every Dadra & Nagar Haveli project, with the district possession charts
Builder: PRAMUKH REALTY
Pramukh Realty has 14 registrations on MahaRERA, including Pramukh Sneh Phase 2 and Nakshatra A-B. Its filings disclose 5 earlier MahaRERA projects: declares 5 of 5 past projects completed on time. Read the full track record. See more projects on the Dadra & Nagar Haveli district page.
Frequently asked questions
What are my rights if PRAMUKH GARDENS-2 is delayed beyond 31 Dec 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of PRAMUKH GARDENS-2?
The registered promoter entity is PRAMUKH REALTY, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in PRAMUKH GARDENS-2?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for PRAMUKH GARDENS-2?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at PRAMUKH GARDENS-2?
The professionals named in the filing: Architect: Paradava Design Consultants; Engineer: Abhishek Golcha; Chartered Accountant: D.K. LAKHANI & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in PRAMUKH GARDENS-2?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback