Home / Browse projects / Dadra & Nagar Haveli / THE PALACIO

Registration lapsed No litigation declared Residential / Group Housing project

THE PALACIO

By TABP Build LLP

RG-MH-00920 · RERA P49600000110 · Last updated on MahaRERA portal: 3 May 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 19 months past the filed date
  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Dadra & Nagar Haveli registration emailed to you, free during the pilot beta.
Mar 2025Possession promised19 months past this date
246 of 286Construction stages doneacross 26 buildings; furthest along: Basement (if any), 95%
16 of 26Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 126 documents Report an error

THE PALACIO is a Residential / Group Housing project by TABP Build LLP in Dadra & Nagar Haveli, registered with MahaRERA as P49600000110 on 20 Jul 2021. Possession was promised by 1 Mar 2025 and is now 19 months past that date. The completion date has moved by 12 months from the original filing. 10 of the 26 units on this registration are recorded sold or booked, and 246 of 286 construction stages are filed complete.

At a glance

Project

  • NameTHE PALACIO
  • TypeResidential / Group Housing
  • Location
    • ATHAL SILVASSA ROAD
    • ATHAL
    • Others
    • Dadra & Nagar Haveli
    • 396230
  • Pincode396230
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P49600000110
  • ReraGenie IDRG-MH-00920

Builder

  • NameTABP Build LLP
  • Entity typePartnership
  • PartnersBabu Punnen Mundamthadathil, Prabhat Pratapji Rajpurohit, Tushar Ashok Choradiya, Ajit Ramesh Patil
  • Other registrations1 more →
  • Completed1 of 2
  • No longer live1 lapsed, de-registered or revoked

Key dates

19 months past promisethis monthRegisteredJul 2021First promiseMar 2024Revised toMar 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on20 Jul 2021
  • Promised completion1 Mar 2025
  • Revised completionRevised to 1 Mar 2025 (originally 3 Mar 2024)
  • Buildings26 building records
  • Documents filed126 files

Current status

38%10 of 26 units booked

Figures as on 3 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
1NA42101
2NA42101
3NA42101
4NA42101
5NA42101
6NA42101
7NA42101
8NA42101
9NA42101
10NA42101
11NA42101
12NA42101
13NA42101
28NA42101
29NA42101
30NA42101
31NA42101
32NA42101
33NA42101
34NA42101
35NA42101
36NA42101
37NA42101
38NA42101
39NA42101
40NA42101

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building20

As on 3 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection. The count above covers all 26 buildings; the table lists the first 20.

246 of 286 construction stages are filed complete across 26 buildings. The stage furthest along is Basement (if any), at 95%.

191%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
282%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
391%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
473%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
591%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
691%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
791%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
888%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.65%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
984%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.75%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%
1084%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.70%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%
1187%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.62%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
1288%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.67%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
1376%
ActivityProgress
Excavation100%
Basement (if any)95%
Podiums (if any)0%
Plinth95%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%
2891%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
2991%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
3091%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
3191%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
3291%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
3391%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
3491%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 3 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed52

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots52
Open Space52
BuildingOpen SpaceTotal
122
222
322
422
522
622
722
822
922
1022
1122
1222
1322
2822
2922
3022
3122
3222
3322
3422
3522
3622
3722
3822
3922
4022

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area9,375 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on23 Jul 2025

Approvals and building plan

Permissible FSI8006.0
Proposed, not sanctioned8,006 sq m
Buildings approved26
Buildings sanctioned26

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchVAPI ROAD OPP JUMMA MASZID, SILVASSA 396230

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAr Sandeep Hardikar
ArchitectThe AHP Architects
EngineerS and V Engineers
EngineerPrafulkumar Meghajibhai Javia
Chartered AccountantMavani Santoki & Co.
Chartered AccountantKakaria and Associates LLP
PartnerRole in project
TABP Build LLP-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT49600019227Mar 2024 → Mar 2025

Reason as filed by the promoterWith reference to above I hereby state that, We TABP Build LLP (Promoter Firm) has Registered the project The Palacio vide Registration No. P49600000110 valid till 03/03/2024. Your honour will appreciate the fact that we have completed the Contraction work almost 74% till Quarter Ending 31/12/2023, however due to post Covid-19 second wave operation at the site were disrupted due to labour issues. Hence, hereby we request your Honor to allow Extension of Project till 01/03/2025.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 9 Jul 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 9 Jul 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 9 Jul 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 9 Jul 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed126

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 126 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2024-2025)File: Signed form 5.pdf3 May 2026
Form 1File: FROM_1 _THE_PALACIO_PHASE 2-31-12-21_compressed.pdf23 Jul 2025
Form 2File: FROM_2 _THE_PALACIO_PHASE 2-31-12-21_compressed.pdf23 Jul 2025
Form 3File: Tabp Palacio 2.pdf23 Jul 2025
Disclosure of Sold and Booked InventoryFile: Tabp Palacio 2.pdf23 Jul 2025
Certificates of Architect (Form 1) (UT)(Mandatory for only ongoing project)File: 01 FORM-1_compressed.pdf24 Apr 2025
Certificates of CA (Form 3) (UT)File: form 3 tabp 31325.pdf24 Apr 2025
Certificates of Engineer (Form 2) (UT) (Mandatory for only ongoing project)File: 02 TABP 4 BHK RERA FORM 2 (31 03 2025) (R01).pdf24 Apr 2025
Certificates of Architect (Form 1) (UT)(Mandatory for only ongoing project)File: Form 1_compressed.pdf7 Feb 2025
Certificates of CA (Form 3) (UT)File: Form 3.pdf7 Feb 2025
Certificates of Engineer (Form 2) (UT) (Mandatory for only ongoing project)File: Form 2.pdf7 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A)File: Form 2A.pdf7 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Phase 2.pdf19 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Phase 2.pdf19 Nov 2024
Certificates of Architect (Form 1) (UT)(Mandatory for only ongoing project)File: 01 TABP 4 BHK RERA FORM 1 (30 09 2024) (R01)_compressed.pdf14 Nov 2024
Certificates of CA (Form 3) (UT)File: Form 3_compressed.pdf14 Nov 2024
Certificates of Engineer (Form 2) (UT) (Mandatory for only ongoing project)File: 02 TABP 4 BHK RERA FORM 2 (30 09 2024) (R01)_compressed.pdf14 Nov 2024
Certificates of Architect (Form 1) (UT)(Mandatory for only ongoing project)File: Form 1_compressed.pdf17 Jul 2024
Certificates of Engineer (Form 2) (UT) (Mandatory for only ongoing project)File: Form2_compressed.pdf17 Jul 2024
Certificates of CA (Form 3) (UT)File: Form 3.pdf17 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A)File: Form 2A.pdf17 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A)File: Form 2A Phase 2.pdf17 Apr 2024
Other - FinanceFile: SOLD UNSOLD P2.pdf17 Apr 2024
Certificates of Architect (Form 1) (UT)(Mandatory for only ongoing project)File: 01 4BHK RERA FORM 1 (31 03 2024) (R01)_compressed.pdf13 Apr 2024
Certificates of Engineer (Form 2) (UT) (Mandatory for only ongoing project)File: 02 TABP 4BHK RERA FORM 2 ( 31 03 2024) (R01)_compressed.pdf13 Apr 2024
Certificates of CA (Form 3) (UT)File: Form 3 Phase 2.pdf13 Apr 2024
Declaration in FORM BFile: Form B.pdf8 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A)File: Form 2A.pdf8 Mar 2024
Other - FinanceFile: Sold unsold.pdf8 Mar 2024
Certificates of Architect (Form 1) (UT)(Mandatory for only ongoing project)File: Form 1 Phase 2_compressed.pdf23 Jan 2024
Certificates of Engineer (Form 2) (UT) (Mandatory for only ongoing project)File: Form 2 Phase 2_compressed.pdf23 Jan 2024
Certificates of CA (Form 3) (UT)File: Form 3 Phase 2_compressed.pdf23 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Phase 2.pdf2 Nov 2023
Certificates of Architect (Form 1) (UT)(Mandatory for only ongoing project)File: TABP phase 2 Form 1_compressed.pdf27 Oct 2023
Certificates of Engineer (Form 2) (UT) (Mandatory for only ongoing project)File: TABP phase 2 Form 2_compressed.pdf27 Oct 2023
Certificates of CA (Form 3) (UT)File: Form 3 Phase 2_compressed.pdf27 Oct 2023
Certificates of Architect (Form 1) (UT)(Mandatory for only ongoing project)File: Form 1 Phase 2_compressed.pdf25 Jul 2023
Certificates of Engineer (Form 2) (UT) (Mandatory for only ongoing project)File: Form 2 Phase 2_compressed.pdf25 Jul 2023
Certificates of CA (Form 3) (UT)File: Form 3.pdf25 Jul 2023
Certificates of Architect (Form 1) (UT)(Mandatory for only ongoing project)File: From-1,Phase II, 31-03-2023_compressed.pdf13 Apr 2023
Certificates of Engineer (Form 2) (UT) (Mandatory for only ongoing project)File: From-2,Phase II, 31-03-2023_compressed.pdf13 Apr 2023
Certificates of CA (Form 3) (UT)File: Form 3 Phase 2.pdf13 Apr 2023
Certificates of Architect (Form 1) (UT)(Mandatory for only ongoing project)File: FROM_1 _THE_PALACIO_PHASE 2-31-12-21_compressed.pdf18 Feb 2023
Certificates of Architect (Form 1) (UT)(Mandatory for only ongoing project)File: TABP-From-1-Phase-II_compressed.pdf18 Feb 2023
Certificates of Architect (Form 1) (UT)(Mandatory for only ongoing project)File: Form 1 30 6 22_compressed.pdf18 Feb 2023
Certificates of Architect (Form 1) (UT)(Mandatory for only ongoing project)File: from_1_4bhk_phase-2_30 09 2022_compressed.pdf18 Feb 2023
Certificates of Architect (Form 1) (UT)(Mandatory for only ongoing project)File: Form 1_compressed.pdf18 Feb 2023
Certificates of Engineer (Form 2) (UT) (Mandatory for only ongoing project)File: FROM_2 _THE_PALACIO_PHASE 2-31-12-21_compressed.pdf18 Feb 2023
Certificates of Engineer (Form 2) (UT) (Mandatory for only ongoing project)File: TABP-From-2-Phase-II_compressed.pdf18 Feb 2023
Certificates of Engineer (Form 2) (UT) (Mandatory for only ongoing project)File: Form-2-4BHK-Enginr-Certificate-30 6 22.pdf18 Feb 2023
Certificates of Engineer (Form 2) (UT) (Mandatory for only ongoing project)File: form-2_4bhk_phase-2_30 09 2022_compressed.pdf18 Feb 2023
Certificates of Engineer (Form 2) (UT) (Mandatory for only ongoing project)File: Form 2_compressed.pdf18 Feb 2023
Certificates of CA (Form 3) (UT)File: Form 3.pdf18 Feb 2023
Certificates of CA (Form 3) (UT)File: FORM 3 Latest.pdf18 Feb 2023
Certificates of CA (Form 3) (UT)File: Form 3.pdf18 Feb 2023
Certificates of CA (Form 3) (UT)File: Form 3.pdf18 Feb 2023
Certificates of CA (Form 3) (UT)File: Form 3.pdf18 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 final.pdf18 Feb 2023
Proforma of Allotment letterFile: AFS draft.pdf13 Jul 2021
Layout approvalFile: Tabp , 2.PDF9 Jul 2021
Layout approvalFile: Tabp , 3 plan_compressed.pdf9 Jul 2021
Layout approvalFile: Tabp , 4 plan_compressed.pdf9 Jul 2021
Layout approvalFile: Tabp , 5 plan_compressed.pdf9 Jul 2021
Layout approvalFile: Tabp , 6 plan_compressed.pdf9 Jul 2021
Layout approvalFile: Tabp , 7 plan_compressed.pdf9 Jul 2021
Layout approvalFile: Tabp , 8 plan_compressed.pdf9 Jul 2021
Layout approvalFile: Tabp , 9 plan_compressed.pdf9 Jul 2021
Layout approvalFile: Tabp , 10 plan_compressed.pdf9 Jul 2021
Layout approvalFile: Tabp ,11 plan_compressed.pdf9 Jul 2021
Layout approvalFile: Tabp , 12 plan_compressed.pdf9 Jul 2021
Layout approvalFile: Tabp , 13 plan_compressed.pdf9 Jul 2021
Layout approvalFile: Tabp , 29 plan_compressed.pdf9 Jul 2021
Layout approvalFile: Tabp , 30 plan_compressed.pdf9 Jul 2021
Layout approvalFile: Tabp , 31_compressed.pdf9 Jul 2021
Layout approvalFile: Tabp , 32.PDF9 Jul 2021
Layout approvalFile: Tabp , 33.PDF9 Jul 2021
Layout approvalFile: Tabp , 34.PDF9 Jul 2021
Layout approvalFile: Tabp , 35.PDF9 Jul 2021
Layout approvalFile: Tabp , 36.PDF9 Jul 2021
Layout approvalFile: Tabp , 37.PDF9 Jul 2021

How this compares with Dadra & Nagar Haveli

38%of this project is bookeddistrict median 30%
10%of Dadra & Nagar Haveli projects moved their completion datethis one moved by 12 months
28%of Dadra & Nagar Haveli registrations have lapsed or been cancelledthis one is among them

Computed across the 210+ Dadra & Nagar Haveli projects on ReraGenie, from their own filings.

Keep THE PALACIO on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near ATHAL210+ in Dadra & Nagar Haveli

2 kmTHE PALACIOCompleted 2Lapsed / revoked 1Other 2Dot size: filed unitsN

Filed coordinates, straight-line distance. 5 registered projects within 2 km.

Builder: TABP Build LLP

TABP Build LLP has 2 registrations on MahaRERA, including PALACIO Phase 1 and THE PALACIO. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Dadra & Nagar Haveli district page.

Frequently asked questions

What does it mean that THE PALACIO shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if THE PALACIO is delayed beyond 1 Mar 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of THE PALACIO?

The registered promoter entity is TABP Build LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in THE PALACIO?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for THE PALACIO?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at THE PALACIO?

The professionals named in the filing: Architect: Ar Sandeep Hardikar; Architect: The AHP Architects; Engineer: S and V Engineers; Engineer: Prafulkumar Meghajibhai Javia; Chartered Accountant: Mavani Santoki & Co.; Chartered Accountant: Kakaria and Associates LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in THE PALACIO?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About THE PALACIO. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save THE PALACIO to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.