Home / Browse projects / Dadra & Nagar Haveli / EKDANT SHLOK
EKDANT SHLOK
By Kalpeshkumar Takhatsinh Parmar
RG-MH-95213 · RERA P49600000144 · Last updated on MahaRERA portal: 16 Jul 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 25 months past the filed date
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Dadra & Nagar Haveli registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
EKDANT SHLOK is a Mixed project by Kalpeshkumar Takhatsinh Parmar in Dadra & Nagar Haveli, registered with MahaRERA as P49600000144 on 21 Nov 2022. Possession was promised by 30 Sep 2024 and is now 25 months past that date. 31 of the 69 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete.
At a glance
Project
- NameEKDANT SHLOK
- TypeMixed
- Location
- next to Lions English School
- Ring Road
- Silvassa
- Dadra & Nagar Haveli
- 396230
- Pincode396230
- MapView location on Google Maps (as filed on RERA)
- RERA no.P49600000144
- ReraGenie IDRG-MH-95213
Builder
- NameKalpeshkumar Takhatsinh Parmar
- Entity typeIndividual
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on21 Nov 2022
- Promised completion30 Sep 2024
- Revised completionNone
- Buildings1 building record
- Documents filed93 files
Current status
Figures as on 16 Jul 2025, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Ekdant Shlok | NA | 12 | 0 | 60 | 8 | 68 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 16 Jul 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
10 of 11 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 0%.
Ekdant Shlok91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
NA Plot Without StructureNot stated
| Activity | Progress |
|---|---|
| Excavation | Not applicable |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | Not applicable |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | Not applicable |
| Sanitary Fittings within the flats / premises | Not applicable |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | Not applicable |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | Not applicable |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | Not applicable |
Progress on shared amenities15
As on 16 Jul 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed58
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Kalpeshkumar T Parmar | - | Dadra & Nagar Haveli |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Kalateet Designs |
| Engineer | Dharmendra B Shah |
| Chartered Accountant | Mavani Santoki & Co. |
| Partner | Role in project |
|---|---|
| Kalpeshkumar Takhatsinh Parmar | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 3 Nov 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 24 Sep 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 24 Sep 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 24 Sep 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed93
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 93 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: Form 1 (UT) architect certificate.pdf | 16 Jul 2025 |
| Form 2File: Form 2 engineers certificate.pdf | 16 Jul 2025 |
| Form 3File: Form 3 (31-12-2022).pdf | 16 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Disclosure.pdf | 16 Jul 2025 |
| Form 1File: FORM 1 (UT) Architech certificate (1).pdf | 16 Jul 2025 |
| Form 2File: FORM 2 UT.pdf | 16 Jul 2025 |
| Form 3File: Form 3.pdf | 16 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Disclosure.pdf | 16 Jul 2025 |
| Form 1File: Architect certificate 30 06 2023.pdf | 16 Jul 2025 |
| Form 2File: Form 2.pdf | 16 Jul 2025 |
| Form 3File: Form 3.pdf | 16 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Disclosure.pdf | 16 Jul 2025 |
| Form 1File: Form 1.pdf | 16 Jul 2025 |
| Form 2File: Form 2.pdf | 16 Jul 2025 |
| Form 3File: Form 3.pdf | 16 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: sold unsold ekdant.pdf | 16 Jul 2025 |
| Form 1File: Form 1.pdf | 16 Jul 2025 |
| Form 2File: From 2.pdf | 16 Jul 2025 |
| Form 3File: Form 3.pdf | 16 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Disclosure.pdf | 16 Jul 2025 |
| Form 1File: FORM 1 UT Architech certificate.pdf | 16 Jul 2025 |
| Form 2File: form 2 Ekdant Shlok.pdf | 16 Jul 2025 |
| Form 3File: Form 3.pdf | 16 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: SOLD_UNSOLD.pdf | 16 Jul 2025 |
| Form 1File: Form 1 UT 30,06,2024.pdf | 16 Jul 2025 |
| Form 2File: Form 2.pdf | 16 Jul 2025 |
| Form 3File: Form 3-1_merged_compressed.pdf | 16 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Disclosure.pdf | 16 Jul 2025 |
| Form 1File: Architech certificate 30- 09-2024.pdf | 16 Jul 2025 |
| Form 2File: Engineers certificate form 2 30-09-2024.pdf | 16 Jul 2025 |
| Form 3File: Form 3_compressed.pdf | 16 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Disclosure.pdf | 16 Jul 2025 |
| Form 2A (FY 2022-2023)File: FORM 2A Quality Assurance certificate.pdf | 16 Jul 2025 |
| Form 2A (FY 2023-2024)File: Form 2A.pdf | 16 Jul 2025 |
| Architect’s Certificate on Completion of Project (Form 4) (UT)File: Form 4 sthapatya associates.pdf | 5 Feb 2025 |
| Other - TechnicalFile: Sthapatya Associayes OC.pdf | 5 Feb 2025 |
| Other - TechnicalFile: Society formation.pdf | 5 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3) (UT)File: Form 3_compressed.pdf | 28 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1) (UT)File: Architech certificate 30- 09-2024.pdf | 26 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2) (UT)File: Engineers certificate form 2 30-09-2024.pdf | 26 Nov 2024 |
| Engineers Certificate on Quality Assurance (Form 2A)File: Engineers certificate Form 2A 30-09-2024.pdf | 26 Nov 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 signed.pdf | 19 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1) (UT)File: Form 1 UT 30,06,2024.pdf | 1 Aug 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2) (UT)File: Form 2.pdf | 1 Aug 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3) (UT)File: Form 3-1_merged_compressed.pdf | 1 Aug 2024 |
| Engineers Certificate on Quality Assurance (Form 2A)File: Form 2A 30,6,24.pdf | 1 Aug 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3) (UT)File: Form 3.pdf | 29 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1) (UT)File: FORM 1 UT Architech certificate.pdf | 26 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2) (UT)File: form 2 Ekdant Shlok.pdf | 26 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A)File: Qualtiy Assurance 31032024.pdf | 26 Apr 2024 |
| Other - FinanceFile: SOLD_UNSOLD.pdf | 26 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1) (UT)File: Form 1.pdf | 5 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2) (UT)File: From 2.pdf | 5 Feb 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3) (UT)File: Form 3.pdf | 5 Feb 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5.pdf | 3 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3) (UT)File: Form 3.pdf | 26 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A)File: Form 2A.pdf | 26 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1) (UT)File: Form 1.pdf | 25 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2) (UT)File: Form 2_compressed.pdf | 25 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1) (UT)File: Architect certificate 30 06 2023.pdf | 27 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2) (UT)File: Form 2.pdf | 27 Jul 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3) (UT)File: Form 3.pdf | 27 Jul 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1) (UT)File: FORM 1 (UT) Architech certificate (1)_compressed.pdf | 21 Apr 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2) (UT)File: STEEL CRETE (FORM 2 UT)_compressed.pdf | 21 Apr 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3) (UT)File: Form 3 C A certificate.pdf | 21 Apr 2023 |
| Engineers Certificate on Quality Assurance (Form 2A)File: FORM 2A Quality Assurance certificate_compressed.pdf | 21 Apr 2023 |
| Other - TechnicalFile: sold inventary ekdant shlok.pdf | 21 Apr 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1) (UT)File: Form 1 (UT) architect certificate.pdf | 25 Feb 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2) (UT)File: Form 2 engineers certificate.pdf | 25 Feb 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3) (UT)File: Form 3 (31-12-2022).pdf | 25 Feb 2023 |
| Engineers Certificate on Quality Assurance (Form 2A)File: Form 2A engineers certificate.pdf | 25 Feb 2023 |
| Copy of the legal title reportFile: Title cum opinion report (ekdant shlok) (srv 848)_compressed.pdf | 3 Nov 2022 |
| Proforma of Allotment letterFile: Allotment letter (Ekdant Shlok)_compressed.pdf | 3 Nov 2022 |
| Proforma of Agreement for saleFile: Final AFS EKDANT SHLOK.pdf | 3 Nov 2022 |
| Deviation Report with respect to Allotment letterFile: Deviation declaration for Allotment Letter and AFS.pdf | 3 Nov 2022 |
| Deviation Report with respect to model copy of AgreementFile: Deviation declaration for Allotment Letter and AFS.pdf | 3 Nov 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3) (UT)File: Form 3 CA Annexure D compressed.pdf | 19 Oct 2022 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank Declaration letter Ekdant shlok.pdf | 1 Oct 2022 |
| Layout approvalFile: Approved Drawings-2_compressed.pdf | 24 Sep 2022 |
| Layout approvalFile: Approved Drawings-3_compressed.pdf | 24 Sep 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Dadra & Nagar Haveli
Computed across the 210+ Dadra & Nagar Haveli projects on ReraGenie, from their own filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 93 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep EKDANT SHLOK on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Silvassa210+ in Dadra & Nagar Haveli
Filed coordinates, straight-line distance. 51 registered projects within 2 km.
PRAMUKH SHIVANTA
ROYAL ENTERPRISE
SHASHIKALP SAROVAR
AKS BUILDERS AND DEVELOPERES
Ekdant Silver Oak
Ekdant Developers
Nagjua Ananta
MICROMEGA PROJECTS
ROYAL VIEW-II
M & P DEVELOPERS
PARADISE ONE
JMB REALTY
See every Dadra & Nagar Haveli project, with the district possession charts
Builder: Kalpeshkumar Takhatsinh Parmar
Kalpeshkumar Takhatsinh Parmar has 1 registration on MahaRERA, including EKDANT SHLOK. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Dadra & Nagar Haveli district page.
Frequently asked questions
What does it mean that EKDANT SHLOK shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if EKDANT SHLOK is delayed beyond 30 Sep 2024?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of EKDANT SHLOK?
The registered promoter entity is Kalpeshkumar Takhatsinh Parmar, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in EKDANT SHLOK?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for EKDANT SHLOK?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at EKDANT SHLOK?
The professionals named in the filing: Architect: Kalateet Designs; Engineer: Dharmendra B Shah; Chartered Accountant: Mavani Santoki & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in EKDANT SHLOK?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback