Home / Browse projects / Dadra & Nagar Haveli / AKSHAR GREENS

Completed No litigation declared Mixed project

AKSHAR GREENS

By MUNIVAR DEVELOPERS

RG-MH-00321 · RERA P49600000009 · Last updated on MahaRERA portal: 21 May 2024

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 3 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 3 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Dadra & Nagar Haveli registration emailed to you, free during the pilot beta.
Oct 2023Possession promisedregistration recorded completed
44 of 44Construction stages doneacross 4 buildings; every applicable stage filed complete
0Complaints at MahaRERAon this registration
Jump to the 47 documents Report an error

AKSHAR GREENS is a Mixed project by MUNIVAR DEVELOPERS in Dadra & Nagar Haveli, registered with MahaRERA as P49600000009 on 2 Nov 2017. The registration is recorded completed; possession was promised by 9 Oct 2023.

At a glance

Project

  • NameAKSHAR GREENS
  • TypeMixed
  • Location
    • Dadra & Nagar Haveli
    • 396230
  • Pincode396230
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P49600000009
  • ReraGenie IDRG-MH-00321

Builder

  • NameMUNIVAR DEVELOPERS
  • Entity typePartnership
  • GSTIN26AAOFM1400G1ZM
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnersRAMESH KALUBHAI GUDRASIYA, SHARADKUMAR VALLABHBHAI DALSANIA
  • Other registrations3 more →
  • Completed3 of 4
  • Declared earlier projects3 →

Key dates

this monthRegisteredNov 2017PromisedOct 2023Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on2 Nov 2017
  • Promised completion9 Oct 2023
  • Revised completionNone
  • Buildings4 building records
  • Documents filed47 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING ANA100000
BUILDING BNA190000
BUILDING CNA190000
BUILDING DNA190000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 21 May 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

44 of 44 construction stages are filed complete across 4 buildings.

BUILDING A100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING B100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING C100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING D100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities16

As on 21 May 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%
DIESEL GENERATOR BACK UPYes100%

Parking filed95

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots95
Closed/Covered27
Open Space68
BuildingClosed/CoveredOpen SpaceTotal
BUILDING A01414
BUILDING B91726
BUILDING C92837
BUILDING D9918

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area7,900 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI17745.27
Proposed, not sanctioned15,431 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch1 T0 16 JAYPEE HOUSE OPP PATEL PETROL PUMP VAPI SILVASSA ROAD SILVASSA DADRA AND NAGAR HAVELI 396230

Certifying professionals and partners

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

PartnerRole in project
MUNIVAR DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 21 Oct 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 21 Oct 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 21 Oct 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 21 Oct 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed47

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate on Completion of Project (Form 4) (UT)File: FORM 4.pdf21 May 2024
OtherFile: ALL BUILDING OC.pdf21 May 2024
Other - FinanceFile: ALL BUILDING OC.pdf21 May 2024
OtherFile: FORM 4.pdf18 May 2024
OtherFile: PART OC A TOWER.pdf18 May 2024
OtherFile: PART OC B TOWER.PDF18 May 2024
OtherFile: PART OC C TOWER AND CLUB HOUSE.pdf18 May 2024
OtherFile: PART OC D TOWER.pdf18 May 2024
OtherFile: FORM 4 RERA.pdf15 May 2024
OtherFile: OC C TOWER and CLUB HOUSE AKSHAR GREENS_001.pdf15 May 2024
Certificates of CA (Form 5) (UT)File: FORM 5 MAR 22.pdf4 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20) (UT)File: GetUserDocumentFileContent.pdf29 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21) (UT)File: form 5, akshar march 2021.pdf21 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: form 5 , akshar march 2022.pdf21 Feb 2023
Certificates of CA (Form 3) (UT)File: FORM 3 MAR 22 AKSHAR GREENS.pdf7 Jun 2022
Certificates of Architect (Form 1) (UT)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE-6_compressed.pdf24 Feb 2022
Certificates of Architect (Form 1) (UT)(Mandatory for only ongoing project)File: Architects Certificate Dt-1-10-21_compressed.pdf24 Feb 2022
Certificates of Architect (Form 1) (UT)(Mandatory for only ongoing project)File: Architects Certificate Dt-1-1-22_compressed.pdf24 Feb 2022
Certificates of Engineer (Form 2) (UT) (Mandatory for only ongoing project)File: Engineers Certificate AG Dt-1-1-22.pdf24 Feb 2022
Certificates of Engineer (Form 2) (UT) (Mandatory for only ongoing project)File: Engineers Certificate AG Dt-1-10-21.pdf24 Feb 2022
Certificates of Engineer (Form 2) (UT) (Mandatory for only ongoing project)File: ENGINEER CERTIFICATE-6.pdf24 Feb 2022
Certificates of CA (Form 5) (UT)File: FORM 5 2019-20.pdf29 Sep 2021
Certificates of CA (Form 5) (UT)File: FORM 5 2020-21.pdf29 Sep 2021
Certificates of CA (Form 5) (UT)File: form 5.pdf27 Nov 2019
Certificates of Architect (Form 1) (UT)(Mandatory for only ongoing project)File: FORM 1 ARCHITECT CERTIFICATE.pdf26 Sep 2019
Certificates of Engineer (Form 2) (UT) (Mandatory for only ongoing project)File: FORM 2 ENGINEER CERTIFICATE.pdf26 Sep 2019
OtherFile: FORM 4.pdf26 Sep 2019
Certificates of Architect (Form 1) (UT)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE-ilovepdf-compressed (1).pdf3 Nov 2018
Certificates of Engineer (Form 2) (UT) (Mandatory for only ongoing project)File: ENGINEER CERTIFICATE-ilovepdf-compressed.pdf3 Nov 2018
Certificates of CA (Form 3) (UT)File: FORM 3 RERA.pdf3 Nov 2018
Certificates of CA (Form 5) (UT)File: MUNIVER (2).pdf3 Nov 2018
Layout approvalFile: LAYOUT MAP.PDF21 Oct 2017
Building plan approval or NA orderFile: BUILDING PLAN APPROVED (IOD)- NEW.pdf21 Oct 2017
PAN CardFile: PAN CARD- MUNIVAR DEVELOPRES.pdf21 Oct 2017
Copy of the legal title reportFile: TITLE REPORT- NEW.pdf21 Oct 2017
Details of encumbrancesFile: NO ENCUMBERANCE - SELF CERTIFIED COPY.pdf21 Oct 2017
Copy of Layout Approval (in case of layout)File: LAYOUT MAP.PDF21 Oct 2017
Building Plan Approval (IOD)File: BUILDING PLAN APPROVED (IOD)- NEW.pdf21 Oct 2017
Commencement CertificatesFile: commencement certificate-.pdf21 Oct 2017
Declaration in FORM BFile: Form B Munivar Developers-.pdf21 Oct 2017
Certificates of Architect (Form 1) (UT)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE.pdf21 Oct 2017
Certificates of Engineer (Form 2) (UT) (Mandatory for only ongoing project)File: ENGINEER CERTIFICATE.pdf21 Oct 2017
Certificates of CA (Form 3) (UT)File: CA CERTIFICATE - MUNIVAR DEVELOPERS.pdf21 Oct 2017
Annual Report / Audited Financial Statements for the immediately preceding three financial yearsFile: LAST 3 YEARS IT RETURNS.pdf21 Oct 2017
Proforma of Allotment letterFile: PROFORMA OF AGREEMENT OF SALE.pdf21 Oct 2017
Certificates of CA (Form 5) (UT)File: NOT APPLICABLE.pdf21 Oct 2017
OtherFile: NOT APPLICABLE.pdf21 Oct 2017

Promoter's earlier projects3

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

3 delivered on promise
ProjectLocationFlatsRegisteredStatusPromisedDelivered
AKSHAR HEIGHTSP49600000103SILVASSA, Dadra & Nagar Haveli-Mar 2021CompletedAug 2026Dec 2023
AKSHAR GREENS PHASE-2P49600000151SILVASSA, Dadra & Nagar Haveli144Apr 2023CompletedFeb 2026Mar 2025
AKSHAR GREENSDADRA NAGAR HAVELI238-CompletedOct 2022May 2022

How this compares with Dadra & Nagar Haveli

10%of Dadra & Nagar Haveli projects moved their completion datethis one has not
28%of Dadra & Nagar Haveli registrations have lapsed or been cancelledthis one is completed

Computed across the 210+ Dadra & Nagar Haveli projects on ReraGenie, from their own filings.

Keep AKSHAR GREENS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Dadra & Nagar Haveli210+ in Dadra & Nagar Haveli

2 kmAKSHAR GREENSCompleted 25Lapsed / revoked 10Other 33Dot size: filed unitsN

Filed coordinates, straight-line distance. 68 registered projects within 2 km.

Builder: MUNIVAR DEVELOPERS

MUNIVAR DEVELOPERS has 4 registrations on MahaRERA, including AKSHAR GREENS and AKSHAR HEIGHTS. Its filings disclose 3 earlier MahaRERA projects: declares 3 of 3 past projects completed on time. Read the full track record. See more projects on the Dadra & Nagar Haveli district page.

Frequently asked questions

What are my rights if AKSHAR GREENS is delayed beyond 9 Oct 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of AKSHAR GREENS?

The registered promoter entity is MUNIVAR DEVELOPERS, a partnership as per the filing. Its GSTIN 26AAOFM1400G1ZM can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in AKSHAR GREENS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for AKSHAR GREENS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

What should I check before booking in AKSHAR GREENS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About AKSHAR GREENS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save AKSHAR GREENS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.