ORION IMPERIA

By Mpoonam Developers LLP

RG-MH-00509 · RERA P49600000043 · Last updated on MahaRERA portal: 9 Jun 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 59 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Dadra & Nagar Haveli registration emailed to you, free during the pilot beta.
Dec 2030Possession promisedmoved 59 months from the original
41 of 110Construction stages doneacross 10 buildings; furthest along: Basement (if any), 70%
409 of 718Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 145 documents Report an error

ORION IMPERIA is a Mixed project by Mpoonam Developers LLP in Dadra & Nagar Haveli, registered with MahaRERA as P49600000043 on 12 Dec 2017. Possession is promised by 31 Dec 2030. The completion date has moved by 59 months from the original filing. 309 of the 718 units on this registration are recorded sold or booked, and 41 of 110 construction stages are filed complete.

At a glance

Project

  • NameORION IMPERIA
  • TypeMixed
  • Location
    • Naroli Char Rasta
    • Naroli
    • Dadra & Nagar Haveli
    • 396235
  • Pincode396235
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P49600000043
  • ReraGenie IDRG-MH-00509

Builder

  • NameMpoonam Developers LLP
  • Entity typeLimited Liability Partnership
  • LLPINAAY-6562
  • GSTIN26AAFFL5526K1Z4
  • PartnersRajeshbhai Maganbhai Ahir, Charit Gautambhai Desai, Tushar Manubhai Ahir, Vallabhbhai Bavbhai Ahir, Kamal Punambhai Ahir, Chandrasing Chhitusing Chauhan, Vinodbhai Devjibhai Ahir, Dinesh Kathadbhai Ahir, Paresh Punambhai Ahir

Key dates

this monthRegisteredDec 2017First promiseJan 2026Revised toDec 2030

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on12 Dec 2017
  • Promised completion31 Dec 2030
  • Revised completionRevised to 31 Dec 2030 (originally 1 Jan 2026)
  • Buildings10 building records
  • Documents filed145 files

Current status

43%309 of 718 units booked
57.5%Work done, per cost certificate

Figures as on 9 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A1NA10972072
A2NA10972072
A3NA10972072
B1NA11972072
CNA11972072
D1NA10936036
D2NA99808
ENA3298486170
B2NA11972072
B3NA11972072

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building10

As on 9 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

41 of 110 construction stages are filed complete across 10 buildings. The stage furthest along is Basement (if any), at 70%.

A15%
ActivityProgress
Excavation50%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
A20%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
A322%
ActivityProgress
Excavation100%
Basement (if any)70%
Podiums (if any)0%
Plinth70%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
B191%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
C2%
ActivityProgress
Excavation25%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
D10%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
D20%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
E91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
B291%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
B391%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 9 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes70%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes75%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%

Parking filed584

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots584
Closed/Covered457
Open Space127
BuildingClosed/CoveredOpen SpaceTotal
A1361046
A236036
A3361046
B1531972
C72072
D1102636
D2808
E8440124
B272072
B3502272

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area31,399 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityDadra and Nagar Haveli Planning and Development Authority
Permissible FSI60453.16
Proposed, not sanctioned60,453 sq m
Buildings approved10
Buildings sanctioned10

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSpecialised Commercial BR VIA House Plot no 135 GIDC Char Rasta VAPI DIST VALSAD 396195
Estimated costRs 141.16 cr
Cost incurredRs 81.12 cr
Work done57.47%
BuildingWingEstimatedIncurred
ENARs 27.08 crRs 27.08 cr
CNARs 17.21 crRs 1.34 cr
B3NARs 14.25 crRs 14.25 cr
B1NARs 14.23 crRs 14.23 cr
B2NARs 14.23 crRs 14.23 cr
-NARs 11.25 crRs 9.22 cr
A1NARs 10.27 cr-
A2NARs 10.27 cr-
A3NARs 10.27 crRs 78.16 lakh
D1NARs 6.55 cr-
D2NARs 5.55 cr-

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDesign Work Group
EngineerSquare Design & Project Management
Chartered Accountantr. j. desai & co
PartnerRole in project
Mpoonam Developers LLP-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA19112518372Jan 2026 → Dec 2030

Reason as filed by the promoterThe project comprises a large layout with ten buildings, namely A1, A2, A3, B1, B2, B3, C, D1, D2, and E. Out of these, we have successfully completed Buildings B1, B2, B3, and E, for which we have received the Occupation Certificate (OC) and have handed over possession to the majority of the respective allottees. The progress of the remaining Buildings A1, A2, A3, C, D1, and D2 was delayed due to a combination of unforeseen factors. These include the unprecedented disruption caused by the COVID-19 pandemic, financial constraints and liquidity challenges during the construction phase, delays i

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 1 Dec 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 1 Dec 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 1 Dec 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 1 Dec 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2030

Documents filed145

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 145 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: ARCHITECT FORM -1 Q4 FY 2025-26.pdf9 Jun 2026
Withdrawal Update Form 2File: ENGINEER - Form Q4 FY-2025-26 ON 01-04-2026 (1).pdf9 Jun 2026
Withdrawal Update Form 3File: FORM - 3 - MAHA RERA -CA CERTIFICATE 31-03-26 compressed.pdf9 Jun 2026
Withdrawal Update Form 1File: Form 1 September 2025.pdf19 Nov 2025
Withdrawal Update Form 1File: Form 1 June 2025.pdf19 Nov 2025
Withdrawal Update Form 2File: Form 2 September 2025.pdf19 Nov 2025
Withdrawal Update Form 2File: Form 2 June 2025.pdf19 Nov 2025
Withdrawal Update Form 3File: Form 3 September 2025.pdf19 Nov 2025
Withdrawal Update Form 3File: Form 3 June 2025.pdf19 Nov 2025
Form 1File: Form 1 September 2025.pdf11 Nov 2025
Form 2File: Form 2 September 2025.pdf11 Nov 2025
Form 3File: Form 3 September 2025.pdf11 Nov 2025
Disclosure of Sold and Booked InventoryFile: CIRCULAR-29 - SEPT 25.pdf11 Nov 2025
Certificates of CA (Form 3) (UT)File: FORM - 3 - MAHA RERA -CA CERTIFICATE 30-06-25_11.pdf23 Jul 2025
Certificates of CA (Form 3) (UT)File: FORM - 3 - MAHA RERA -CA CERTIFICATE 31-03-25.pdf29 Apr 2025
Certificates of CA (Form 3) (UT)File: FORM - 3 - MAHA RERA -CA CERTIFICATE 30-09-2024.pdf27 Jan 2025
Certificates of CA (Form 3) (UT)File: FORM - 3 - MAHA RERA -CA CERTIFICATE 31-12-2024.pdf27 Jan 2025
Certificates of Architect (Form 1) (UT)(Mandatory for only ongoing project)File: ARCHITECT'S CERTIFICATE 01-04-2024.pdf21 Jan 2025
Certificates of Architect (Form 1) (UT)(Mandatory for only ongoing project)File: ARCHITECT'S CERTIFICATE 01-07-2024.pdf21 Jan 2025
Certificates of Architect (Form 1) (UT)(Mandatory for only ongoing project)File: ARCHITECT'S CERTIFICATE 01-10-2024.pdf21 Jan 2025
Certificates of Architect (Form 1) (UT)(Mandatory for only ongoing project)File: ARCHITECT'S CERTIFICATE 01-01-2025.pdf21 Jan 2025
Certificates of Engineer (Form 2) (UT) (Mandatory for only ongoing project)File: ENGINEER CERTIFICATE 01-04-2024.pdf21 Jan 2025
Certificates of Engineer (Form 2) (UT) (Mandatory for only ongoing project)File: ENGINEER CERTIFICATE 01-07-2024.pdf21 Jan 2025
Certificates of Engineer (Form 2) (UT) (Mandatory for only ongoing project)File: ENGINEER CERTIFICATE 01-10-2024.pdf21 Jan 2025
Certificates of Engineer (Form 2) (UT) (Mandatory for only ongoing project)File: ENGINEER CERTIFICATE 01-01-2025.pdf21 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM-5 2023-24.pdf21 Jan 2025
Certificates of CA (Form 3) (UT)File: FORM - 3 - MAHA RERA -CA CERTIFICATE 31-03-2024 1_compressed.pdf7 Dec 2024
Certificates of CA (Form 3) (UT)File: FORM - 3 - MAHA RERA -CA CERTIFICATE 30-06-2024_compress.pdf7 Dec 2024
Certificates of Architect (Form 1) (UT)(Mandatory for only ongoing project)File: Form 1_compressed.pdf12 Mar 2024
Certificates of Engineer (Form 2) (UT) (Mandatory for only ongoing project)File: Form 2.pdf12 Mar 2024
Certificates of CA (Form 3) (UT)File: FORM - 3 - MAHA RERA.pdf17 Feb 2024
Certificates of CA (Form 3) (UT)File: FORM - 3 - MAHA RERA.pdf17 Feb 2024
Certificates of Engineer (Form 2) (UT) (Mandatory for only ongoing project)File: FORM -2 JAN 2023.pdf19 Jan 2024
Certificates of Engineer (Form 2) (UT) (Mandatory for only ongoing project)File: FORM -2 APR 2023.pdf19 Jan 2024
Certificates of Engineer (Form 2) (UT) (Mandatory for only ongoing project)File: FORM -2 JULY 2023.pdf19 Jan 2024
Certificates of Engineer (Form 2) (UT) (Mandatory for only ongoing project)File: FORM -2 OCT 2023.pdf19 Jan 2024
Annual Report / Audited Financial Statements for the immediately preceding three financial yearsFile: FINANCIAL STATEMENT 2021-22.pdf18 Jan 2024
Annual Report / Audited Financial Statements for the immediately preceding three financial yearsFile: FINAL AUDITED FINANCIAL STATEMENT FY 2022-23_compressed.pdf18 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM-5 21-22.pdf18 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM-5 22-23.pdf18 Jan 2024
Certificates of Architect (Form 1) (UT)(Mandatory for only ongoing project)File: FORM -1 Q4 FY 2022-23_compressed.pdf12 Jan 2024
Certificates of Architect (Form 1) (UT)(Mandatory for only ongoing project)File: 2_compressed.pdf12 Jan 2024
Certificates of Architect (Form 1) (UT)(Mandatory for only ongoing project)File: FORM -1 Q2 FY 2023-24_compressed.pdf12 Jan 2024
Certificates of CA (Form 3) (UT)File: FORM 3 FINAL_compressed.pdf12 Jan 2024
Certificates of CA (Form 3) (UT)File: FORM - 3 - Q4_compressed.pdf12 Jan 2024
Certificates of CA (Form 3) (UT)File: FORM - 3 - RERA CERTIFICATE_compressed.pdf12 Jan 2024
Certificates of Architect (Form 1) (UT)(Mandatory for only ongoing project)File: Form -1_compressed.pdf3 Feb 2023
Certificates of Architect (Form 1) (UT)(Mandatory for only ongoing project)File: FORM -1_compressed.pdf3 Feb 2023
Certificates of Architect (Form 1) (UT)(Mandatory for only ongoing project)File: Form -1_compressed.pdf3 Feb 2023
Certificates of Architect (Form 1) (UT)(Mandatory for only ongoing project)File: FORM -1_compressed.pdf3 Feb 2023
Certificates of Architect (Form 1) (UT)(Mandatory for only ongoing project)File: FORM -1_compressed.pdf3 Feb 2023
Certificates of Engineer (Form 2) (UT) (Mandatory for only ongoing project)File: FORM -2.pdf3 Feb 2023
Certificates of Engineer (Form 2) (UT) (Mandatory for only ongoing project)File: FORM -2_compressed.pdf3 Feb 2023
Certificates of Engineer (Form 2) (UT) (Mandatory for only ongoing project)File: FORM -2_compressed.pdf3 Feb 2023
Certificates of CA (Form 3) (UT)File: FORM 3_compressed.pdf3 Feb 2023
Certificates of CA (Form 3) (UT)File: FORM - 3 - Q-2 - 2022-23.pdf3 Feb 2023
Certificates of CA (Form 3) (UT)File: FORM - 3 -RERA_compressed.pdf3 Feb 2023
Certificates of Architect (Form 1) (UT)(Mandatory for only ongoing project)File: Form - 1_compressed.pdf11 Apr 2022
Certificates of Engineer (Form 2) (UT) (Mandatory for only ongoing project)File: FORM - 2_compressed.pdf11 Apr 2022
Certificates of CA (Form 3) (UT)File: FORM -3 - RERA_compressed.pdf11 Apr 2022
Annual Report / Audited Financial Statements for the immediately preceding three financial yearsFile: FINANCIAL STATEMENT 2020-21_Compress.pdf11 Apr 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FINAL - AUDIT REPORT AND FINANCIAL STATEMENT FY 2019-20_Compressed.pdf11 Apr 2022
Certificates of Engineer (Form 2) (UT) (Mandatory for only ongoing project)File: Form 2_compressed.pdf7 Feb 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM - 5.pdf31 Dec 2021
Certificates of Architect (Form 1) (UT)(Mandatory for only ongoing project)File: FORM_1_Q2_compressed.pdf25 Nov 2021
Certificates of Engineer (Form 2) (UT) (Mandatory for only ongoing project)File: FORM_2_Q_1_compressed.pdf25 Nov 2021
Certificates of CA (Form 3) (UT)File: Form -3 - Q-2 - Lotus Infra_compressed.pdf25 Nov 2021
Certificates of Architect (Form 1) (UT)(Mandatory for only ongoing project)File: ARCHITECT_FORM_1.pdf2 Nov 2021
Certificates of Architect (Form 1) (UT)(Mandatory for only ongoing project)File: Form -3 - Q-2 - Lotus Infra_compressed.pdf2 Nov 2021
Certificates of CA (Form 3) (UT)File: Form-3 Q-1 - Lotus Infra_compressed.pdf2 Nov 2021
PAN CardFile: PAN CARD -MPD LLP.pdf16 Oct 2021
OtherFile: Partnership_Deed_MPoonam Developers LLP.pdf16 Oct 2021
Certificates of Architect (Form 1) (UT)(Mandatory for only ongoing project)File: ARCHITECT FORM - 1-compressed.pdf15 Jul 2021
Certificates of Engineer (Form 2) (UT) (Mandatory for only ongoing project)File: ENGINEER -FORM - 2_compress.pdf15 Jul 2021
Certificates of CA (Form 3) (UT)File: RERA FORM -3 Q-4 2020-21_compress.pdf15 Jul 2021
Annual Report / Audited Financial Statements for the immediately preceding three financial yearsFile: LOTUS INFRA 2019-2020_compressed.pdf29 May 2021
Certificates of CA (Form 5) (UT)File: FORM 5_compressed.pdf29 May 2021
Certificates of Architect (Form 1) (UT)(Mandatory for only ongoing project)File: Q2 Architect 20-21_compressed.pdf12 May 2021
Certificates of Architect (Form 1) (UT)(Mandatory for only ongoing project)File: Q3 Architect 20-21_compressed.pdf12 May 2021
Certificates of Engineer (Form 2) (UT) (Mandatory for only ongoing project)File: Q2 Eng 20-21.pdf12 May 2021

How this compares with Dadra & Nagar Haveli

43%of this project is bookeddistrict median 30%
10%of Dadra & Nagar Haveli projects moved their completion datethis one moved by 59 months
28%of Dadra & Nagar Haveli registrations have lapsed or been cancelledthis one is on the register

Computed across the 210+ Dadra & Nagar Haveli projects on ReraGenie, from their own filings.

Keep ORION IMPERIA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Naroli210+ in Dadra & Nagar Haveli

2 kmORION IMPERIALapsed / revoked 4Other 13Dot size: filed unitsN

Filed coordinates, straight-line distance. 17 registered projects within 2 km.

Builder: Mpoonam Developers LLP

Mpoonam Developers LLP has 1 registration on MahaRERA, including ORION IMPERIA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Dadra & Nagar Haveli district page.

Frequently asked questions

What are my rights if ORION IMPERIA is delayed beyond 31 Dec 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ORION IMPERIA?

The registered promoter entity is Mpoonam Developers LLP, a limited liability partnership as per the filing. Its LLPIN AAY-6562 and GSTIN 26AAFFL5526K1Z4 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ORION IMPERIA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ORION IMPERIA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ORION IMPERIA?

The professionals named in the filing: Architect: Design Work Group; Engineer: Square Design & Project Management; Chartered Accountant: r. j. desai & co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ORION IMPERIA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ORION IMPERIA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ORION IMPERIA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.