Home / Browse projects / Dadra & Nagar Haveli / SAHAJANAND INTEGRITY

Registered No litigation declared Commercial project

SAHAJANAND INTEGRITY

By SHREEJI DEVELOPERS

RG-MH-00756 · RERA P49600000086 · Last updated on MahaRERA portal: 30 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 26 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Dadra & Nagar Haveli registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
8 of 11Construction stages donefurthest along: Installation of Lifts, 95%
103 of 150Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 92 documents Report an error

SAHAJANAND INTEGRITY is a Commercial project by SHREEJI DEVELOPERS in Dadra & Nagar Haveli, registered with MahaRERA as P49600000086 on 13 Feb 2020. Possession is promised by 30 Dec 2026. 47 of the 150 units on this registration are recorded sold or booked, and 8 of 11 construction stages are filed complete.

At a glance

Project

  • NameSAHAJANAND INTEGRITY
  • TypeCommercial
  • Location
    • SURVEY NO 886/1/2/1/1
    • AMLI SILVASSA
    • Others
    • Dadra & Nagar Haveli
    • 396230
  • Pincode396230
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P49600000086
  • ReraGenie IDRG-MH-00756

Builder

  • NameSHREEJI DEVELOPERS
  • Entity typePartnership
  • PartnersRAJESHKUMAR GORDHANBHAI AMIN, SUNIL CHAUHAN, RANJITSINH DANABHAI CHAUHAN, KAMLESHKUMAR R CHAUHAN, KETAN N SOLANKI
  • Other registrations26 more →
  • Completed11 of 27
  • No longer live4 lapsed, de-registered or revoked
  • Past their filed date1
  • Declared earlier projects7 →

Key dates

this monthRegisteredFeb 2020PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on13 Feb 2020
  • Promised completion30 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed92 files

Current status

31%47 of 150 units booked
99.4%Work done, per cost certificate

Figures as on 30 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SAHAJANAND INTERGITYNA11110150150

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 30 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 11 construction stages are filed complete. The stage furthest along is Installation of Lifts, at 95%.

SAHAJANAND INTERGITY: 81% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%

Progress on shared amenities15

As on 30 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes95%
Street LightingYes95%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes95%
Electrical meter room, sub-station, receiving stationYes90%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%

Parking filed34

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots34
Closed/Covered1
Open Space33

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,000 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on29 Jul 2025

Approvals and building plan

Sanctioning authorityDADRA AND NAGAR HAVELI PLANNING & DEVELOPMENT AUTHORITY
Permissible FSI7703.34
Proposed, not sanctioned7,703 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGROUND FLOOR OPP VB MALL OPP GOVT SUPPLY DEPOT SILVASSA 396230
Estimated costRs 21.35 cr
Cost incurredRs 21.22 cr
Work done99.39%
BuildingWingEstimatedIncurred
SAHAJANAND INTERGITYNARs 14.83 crRs 14.83 cr
-NARs 6.52 crRs 6.39 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectTEJAS SHUKLA
ArchitectAVINASH NAWATHE ARCHITECTS
EngineerANIL N PATEL
EngineerJ+W Consultants
Chartered AccountantKUNAL B SHAH
PartnerRole in project
SHREEJI DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 13 Jan 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 13 Jan 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 13 Jan 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 13 Jan 2020Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Dec 2026

Documents filed92

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 92 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1 MAR 2025.pdf30 Apr 2026
Withdrawal Update Form 1File: FORM 1 MAR 2025.pdf30 Apr 2026
Withdrawal Update Form 1File: FORM 1 MAR 2025.pdf30 Apr 2026
Withdrawal Update Form 1File: FORM 1 MAR 2025.pdf30 Apr 2026
Withdrawal Update Form 2File: FORM 2 MAR 2025.pdf30 Apr 2026
Withdrawal Update Form 2File: FORM 2 MAR 2025.pdf30 Apr 2026
Withdrawal Update Form 2File: FORM 2 MAR 2025.pdf30 Apr 2026
Withdrawal Update Form 2File: FORM 2 MAR 2025.pdf30 Apr 2026
Withdrawal Update Form 3File: FORM 3 MAR 2025.pdf30 Apr 2026
Withdrawal Update Form 3File: FORM 3 MAR 2025.pdf30 Apr 2026
Withdrawal Update Form 3File: FORM 3 MAR 2025.pdf30 Apr 2026
Withdrawal Update Form 3File: FORM 3 MAR 2025.pdf30 Apr 2026
Certificates of Architect (Form 1) (UT)(Mandatory for only ongoing project)File: FORM 1 MAR 2025.pdf1 May 2025
Certificates of CA (Form 3) (UT)File: FORM 3 MAR 2025_compressed.pdf1 May 2025
Certificates of Engineer (Form 2) (UT) (Mandatory for only ongoing project)File: FORM 2 MAR 2025.pdf1 May 2025
Form 2AFile: FORM 2A MAR 2025.pdf1 May 2025
Certificates of Architect (Form 1) (UT)(Mandatory for only ongoing project)File: form 1 DEC 2024.pdf22 Feb 2025
Certificates of CA (Form 3) (UT)File: FORM 3 DEC 2024_compressed.pdf22 Feb 2025
Certificates of Engineer (Form 2) (UT) (Mandatory for only ongoing project)File: form 2 DEC 2024.pdf22 Feb 2025
Form 2AFile: form 2 A DEC 2024.pdf22 Feb 2025
Certificates of Architect (Form 1) (UT)(Mandatory for only ongoing project)File: form 1 30-06-2024.pdf2 Dec 2024
Certificates of Architect (Form 1) (UT)(Mandatory for only ongoing project)File: form 1 30-09-2024.pdf2 Dec 2024
Certificates of CA (Form 3) (UT)File: FORM 3 SEPT 2023_compressed.pdf2 Dec 2024
Certificates of CA (Form 3) (UT)File: FORM 3 DEC 23.pdf2 Dec 2024
Certificates of CA (Form 3) (UT)File: FORM 3 MAR 2024.pdf2 Dec 2024
Certificates of CA (Form 3) (UT)File: FORM 3 JUNE 2024.pdf2 Dec 2024
Certificates of CA (Form 3) (UT)File: FORM 3 SEPT 2024.pdf2 Dec 2024
Certificates of Engineer (Form 2) (UT) (Mandatory for only ongoing project)File: form 2 30-06-2024.pdf2 Dec 2024
Certificates of Engineer (Form 2) (UT) (Mandatory for only ongoing project)File: form 2 30-09-2024.pdf2 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Rera-2023-2024.pdf30 Oct 2024
Certificates of Architect (Form 1) (UT)(Mandatory for only ongoing project)File: Form 1 Mar 23.pdf15 May 2024
Certificates of Architect (Form 1) (UT)(Mandatory for only ongoing project)File: FORM 1 JUNE 23.pdf15 May 2024
Certificates of Architect (Form 1) (UT)(Mandatory for only ongoing project)File: FORM 1.pdf15 May 2024
Certificates of Architect (Form 1) (UT)(Mandatory for only ongoing project)File: FORM 1.pdf15 May 2024
Certificates of Architect (Form 1) (UT)(Mandatory for only ongoing project)File: FORM 1.pdf15 May 2024
Certificates of Engineer (Form 2) (UT) (Mandatory for only ongoing project)File: Form 2 Mar 23.pdf15 May 2024
Certificates of Engineer (Form 2) (UT) (Mandatory for only ongoing project)File: FORM 2 JUNE 23.pdf15 May 2024
Certificates of Engineer (Form 2) (UT) (Mandatory for only ongoing project)File: FORM 2.pdf15 May 2024
Certificates of Engineer (Form 2) (UT) (Mandatory for only ongoing project)File: FORM 2.pdf15 May 2024
Certificates of Engineer (Form 2) (UT) (Mandatory for only ongoing project)File: FORM 2.pdf15 May 2024
Certificates of CA (Form 3) (UT)File: FORM 3 MARCH.pdf15 May 2024
Certificates of CA (Form 3) (UT)File: FORM 3 JUNE.pdf15 May 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 FY 2022-23.pdf15 May 2024
Certificates of Architect (Form 1) (UT)(Mandatory for only ongoing project)File: form 1, dec 2021.pdf17 Feb 2023
Certificates of Architect (Form 1) (UT)(Mandatory for only ongoing project)File: form 1 , march 2022.pdf17 Feb 2023
Certificates of Architect (Form 1) (UT)(Mandatory for only ongoing project)File: form 1 , june 2022.pdf17 Feb 2023
Certificates of Architect (Form 1) (UT)(Mandatory for only ongoing project)File: form 1, sept 2022.pdf17 Feb 2023
Certificates of Architect (Form 1) (UT)(Mandatory for only ongoing project)File: form 1, dec 2022.pdf17 Feb 2023
Certificates of Engineer (Form 2) (UT) (Mandatory for only ongoing project)File: form 2, dec 2021.pdf17 Feb 2023
Certificates of Engineer (Form 2) (UT) (Mandatory for only ongoing project)File: form 2 , march 2022.pdf17 Feb 2023
Certificates of Engineer (Form 2) (UT) (Mandatory for only ongoing project)File: form 2, june 2022.pdf17 Feb 2023
Certificates of Engineer (Form 2) (UT) (Mandatory for only ongoing project)File: form 2, sept 2022.pdf17 Feb 2023
Certificates of Engineer (Form 2) (UT) (Mandatory for only ongoing project)File: form 2, dec 2022.pdf17 Feb 2023
Certificates of CA (Form 3) (UT)File: form 3, march 2022_compressed.pdf17 Feb 2023
Certificates of CA (Form 3) (UT)File: form 3 , june 2022_compressed.pdf17 Feb 2023
Certificates of CA (Form 3) (UT)File: form 3, sept 2022_compressed.pdf17 Feb 2023
Certificates of CA (Form 3) (UT)File: form 3 , dec 2022_compressed.pdf17 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20) (UT)File: form 5 , march 2020.pdf17 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21) (UT)File: form 5 , march 2021.pdf17 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: form 5 , march 2022.pdf17 Feb 2023
Certificates of CA (Form 3) (UT)File: FORM 3 SEPT 21 FINAL.pdf28 Feb 2022
Certificates of CA (Form 3) (UT)File: FORM 3 DEC 21 FINAL.pdf28 Feb 2022
Certificates of Architect (Form 1) (UT)(Mandatory for only ongoing project)File: FORM 1 SEP 21.pdf26 Feb 2022
Certificates of Architect (Form 1) (UT)(Mandatory for only ongoing project)File: FORM 1 DEC 21.pdf26 Feb 2022
Certificates of Engineer (Form 2) (UT) (Mandatory for only ongoing project)File: FORM 2 SEP 21.pdf26 Feb 2022
Certificates of Engineer (Form 2) (UT) (Mandatory for only ongoing project)File: FORM 2 DEC 21.pdf26 Feb 2022
Form 2AFile: FORM 2A SEP 21.pdf26 Feb 2022
Form 2AFile: FORM 2A DEC 21.pdf26 Feb 2022
Certificates of CA (Form 3) (UT)File: FORM 3 SHREEJI MARCH 21_compressed.pdf4 Oct 2021
Certificates of CA (Form 3) (UT)File: FORM 3 SHREEJI JUNE 21_compressed.pdf4 Oct 2021
Certificates of Architect (Form 1) (UT)(Mandatory for only ongoing project)File: FORM 1 SHREEJI 30 JUNE 2021.pdf13 Sep 2021
Certificates of Engineer (Form 2) (UT) (Mandatory for only ongoing project)File: FORM 2 SHREEJI 30 JUNE 2021.pdf13 Sep 2021
Form 2AFile: FORM 2A SHREEJI 30 JUNE 2021.pdf13 Sep 2021
Certificates of Architect (Form 1) (UT)(Mandatory for only ongoing project)File: form 1 - arch certf shreeji developers.pdf9 Jun 2021
Certificates of Engineer (Form 2) (UT) (Mandatory for only ongoing project)File: form 2 engg certf - shreeji developers.pdf9 Jun 2021
Proforma of Allotment letterFile: AGREEMENT- SHREEJI DEVELOPERS.pdf9 Jun 2021
Form 2AFile: form 2a - eng certf for quality assurance - shreeji developers.pdf9 Jun 2021
Layout approvalFile: LAYOUT PLAN APPROVED_compressed.pdf13 Jan 2020
Building plan approvalFile: BUILDIN PLAN APPROVED_compressed.pdf13 Jan 2020
PAN CardFile: PAN CARD.pdf13 Jan 2020

How this compares with Dadra & Nagar Haveli

31%of this project is bookeddistrict median 30%
10%of Dadra & Nagar Haveli projects moved their completion datethis one has not
28%of Dadra & Nagar Haveli registrations have lapsed or been cancelledthis one is on the register

Computed across the 210+ Dadra & Nagar Haveli projects on ReraGenie, from their own filings.

Keep SAHAJANAND INTEGRITY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near AMLI SILVASSA210+ in Dadra & Nagar Haveli

2 kmSAHAJANAND INTEGRITYCompleted 20Lapsed / revoked 17Other 25Dot size: filed unitsN

Filed coordinates, straight-line distance. 62 registered projects within 2 km.

Builder: SHREEJI DEVELOPERS

SHREEJI DEVELOPERS has 27 registrations on MahaRERA, including SAHAJANAND INTEGRITY and SHREEJI DREAMS. Its filings disclose 7 earlier MahaRERA projects: declares 6 of 7 past projects completed on time. Read the full track record. See more projects on the Dadra & Nagar Haveli district page.

Frequently asked questions

What are my rights if SAHAJANAND INTEGRITY is delayed beyond 30 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SAHAJANAND INTEGRITY?

The registered promoter entity is SHREEJI DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SAHAJANAND INTEGRITY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SAHAJANAND INTEGRITY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SAHAJANAND INTEGRITY?

The professionals named in the filing: Architect: TEJAS SHUKLA; Architect: AVINASH NAWATHE ARCHITECTS; Engineer: ANIL N PATEL; Engineer: J+W Consultants; Chartered Accountant: KUNAL B SHAH. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SAHAJANAND INTEGRITY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SAHAJANAND INTEGRITY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SAHAJANAND INTEGRITY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.