ReraGenieLog inGet a buyer report

Home / Browse projects / Dadra & Nagar Haveli / SHASHIKALP SAROVAR

Registration lapsed No litigation declared Mixed project

SHASHIKALP SAROVAR

By AKS BUILDERS AND DEVELOPERES

RG-MH-00579 · RERA P49600000056 · Last updated on MahaRERA portal: 9 Jul 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 10 months past the filed date
  • Completion date moved by 43 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Dadra & Nagar Haveli registration emailed to you, free during the pilot beta.
Dec 2025Possession promised10 months past this date
24 of 66Construction stages doneacross 7 buildings; furthest along: Slabs of Super Structure, 55%
240 of 499Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 158 documents Report an error

SHASHIKALP SAROVAR is a Mixed project by AKS BUILDERS AND DEVELOPERES in Dadra & Nagar Haveli, registered with MahaRERA as P49600000056 on 4 Jul 2018. Possession was promised by 31 Dec 2025 and is now 10 months past that date. The completion date has moved by 43 months from the original filing. 259 of the 499 units on this registration are recorded sold or booked, and 24 of 66 construction stages are filed complete.

At a glance

Project

  • NameSHASHIKALP SAROVAR
  • TypeMixed
  • Location
    • SURVEY NO. 44/9
    • OPP. SWAMINARAYAN TEMPLE
    • ATHAL
    • SILVASSA
    • Others
    • Dadra & Nagar Haveli
    • 396230
  • Pincode396230
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P49600000056
  • ReraGenie IDRG-MH-00579

Builder

  • NameAKS BUILDERS AND DEVELOPERES
  • Entity typePartnership
  • PartnersPINKI ANILKUMAR SINGH, BRAHMDEV BHAGWATI SINGH, ARVIND CHANDRABALI SINGH, MADANLAL HARILAL GUPTA

Key dates

10 months past promisethis monthRegisteredJul 2018First promiseMay 2022Revised toDec 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on4 Jul 2018
  • Promised completion31 Dec 2025
  • Revised completionRevised to 31 Dec 2025 (originally 30 May 2022)
  • Buildings6 building records
  • Documents filed158 files

Current status

52%259 of 499 units booked
62.3%Work done, per cost certificate

Figures as on 9 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SHASHIKALP SAROVAR - A BUILDINGNA119462066
SHASHIKALP SAROVAR - B BUILDINGNA11918018
SHASIKALP SAROVAR - CD BUILDINGNA1191350135
SHASHIKALP SAROVAR - F BUILDINGNA11972072
SHASHIKALP SAROVAR - G BUILDINGNA1191170117
SHASHIKALP SAROVAR - E BUILDINGNA11990090

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building7

As on 9 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

24 of 66 construction stages are filed complete across 7 buildings. The stage furthest along is Slabs of Super Structure, at 55%.

SHASHIKALP SAROVAR - A BUILDING35%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure55%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises10%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks25%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
SHASHIKALP SAROVAR - B BUILDING35%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure55%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises10%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks25%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
SHASIKALP SAROVAR - CD BUILDING82%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
SHASHIKALP SAROVAR - F BUILDING0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
SHASHIKALP SAROVAR - G BUILDING82%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
SHASHIKALP SAROVAR - E BUILDING0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
NA Plot Without StructureNot stated
ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 9 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes33%
Water SupplyYes33%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes67%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes33%
Street LightingYes33%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes33%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes33%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes100%

Land and ownership3

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area12,200 sq m
Land owned byThe promoter, with other names on the file
Named landowners3
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on13 Dec 2025
LandownerVillageDistrict
PRIYANKSINH ISHWARSINH PARMAR-Dadra & Nagar Haveli
MEHULSINH ISHWARSINH PARMAR-Dadra & Nagar Haveli
RANJANBEN ISHWARSINGH PARMAR-Dadra & Nagar Haveli

Approvals and building plan

Sanctioning authorityPlanning and development authority
Permissible FSI22790.95
Proposed, not sanctioned22,791 sq m
Buildings approved6
Buildings sanctioned6

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchHotel Vishwanath Bldg Ground Floor Near Silvassa Char Rasta Silvasa Dadra And Nagar Haveli 396230
Estimated costRs 32.50 cr
Cost incurredRs 20.25 cr
Work done62.31%
BuildingWingEstimatedIncurred
SHASIKALP SAROVAR - CD BUILDINGNARs 8.75 crRs 8.75 cr
SHASHIKALP SAROVAR - G BUILDINGNARs 8.00 crRs 8.00 cr
SHASHIKALP SAROVAR - A BUILDINGNARs 6.12 crRs 2.45 cr
SHASHIKALP SAROVAR - F BUILDINGNARs 3.50 cr-
SHASHIKALP SAROVAR - E BUILDINGNARs 3.50 cr-
SHASHIKALP SAROVAR - B BUILDINGNARs 2.63 crRs 1.05 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectNarendrakumar Sharma
EngineerJiten Patel
Chartered AccountantANIL JAIN
Chartered AccountantMukesh Choksi
PartnerRole in project
AKS BUILDERS AND DEVELOPERES-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT49600011960May 2022 → May 2023

Reason as filed by the promoterWe have a project in the name of “Shashikalp Sarovar” having Rera Number P49600000056 which is expiring on date 30 th May 2022. We have just applied for Fire NOC of one of the buildings, Wing G in the said project and hope to get it within 30 days. We also expect to apply for OC for our Wing C latest by Decmeber’2022. We would need and extension of RERA date by a year and half to complete the rest of the project and obtain OC for the same. The delay in construction is caused due to unavailability of labours, material and free movability of materials during lock down imposed from March 2020 to

EXT49600017688May 2022 → Dec 2025

Reason as filed by the promoterDue to unforeseen circumstances and various challenges encountered during the course of the project, we are experiencing delays in completing the construction as per the agreed timeline. These challenges include, but are not limited to, inclement weather conditions, supply chain disruptions, and labor shortages. Despite our best efforts to mitigate these issues, they have significantly impacted the progress of the project. We fully understand the importance of adhering to the agreed-upon timeline and the inconvenience this may cause to our firm. We assure you that our team is working diligentl

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Jun 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Jun 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Jun 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 29 Jun 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed158

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 158 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: form 1.pdf9 Jul 2026
Withdrawal Update Form 2File: FORM 2.pdf9 Jul 2026
Withdrawal Update Form 3File: FORM 3 (31-12-2025)_compressed.pdf9 Jul 2026
Withdrawal Update Form 1File: FORM 1.pdf8 Jul 2026
Withdrawal Update Form 2File: FORM 2.pdf8 Jul 2026
Withdrawal Update Form 3File: FORM 3_compressed.pdf8 Jul 2026
Form 5 (FY 2020-2021)File: Form 5 2020 - 2021-1.pdf9 Dec 2025
Form 5 (FY 2021-2022)File: Form 5 2021 - 2022-2.pdf9 Dec 2025
Form 5 (FY 2022-2023)File: Form 5 2022 - 2023-3.pdf9 Dec 2025
Form 5 (FY 2018-2019)File: From 5 (2018 - 2019).pdf9 Dec 2025
Form 5 (FY 2019-2020)File: Form 5 (2019 - 2020).pdf9 Dec 2025
Form 5 (FY 2023-2024)File: FORM 5 (2023 - 2024).pdf9 Dec 2025
Form 5 (FY 2024-2025)File: Form 5 (2024-2025).pdf9 Dec 2025
Form 1File: 23A-31-3-24-merged-6.pdf2 Dec 2025
Form 2File: ENGINEER 31-03-2024.pdf2 Dec 2025
Form 3File: Form 3 31-03-2024.pdf2 Dec 2025
Disclosure of Sold and Booked InventoryFile: Sold and Unsold 31-03-2024.pdf2 Dec 2025
Form 1File: 24A-30-06-24-merged-5.pdf2 Dec 2025
Form 2File: ENGINEER 30-06-2024.pdf2 Dec 2025
Form 3File: FORM 3 30-06-2024.pdf2 Dec 2025
Disclosure of Sold and Booked InventoryFile: Sold and Unsold 30-06-2024.pdf2 Dec 2025
Form 1File: 25A-30-09-24-merged-4.pdf2 Dec 2025
Form 2File: ENGINEER 30-09-2024.pdf2 Dec 2025
Form 3File: FORM 3 30-09-2024.pdf2 Dec 2025
Disclosure of Sold and Booked InventoryFile: Sold and Unsold 30-09-2024.pdf2 Dec 2025
Form 1File: 26A-31-12-24-merged-3.pdf2 Dec 2025
Form 2File: ENGINEER 31-12-2024.pdf2 Dec 2025
Form 3File: FORM 3 31-12-2024.pdf2 Dec 2025
Disclosure of Sold and Booked InventoryFile: Sold and Unsold 31-12-2024.pdf2 Dec 2025
Form 1File: 27A-31-3-25-merged-2.pdf2 Dec 2025
Form 2File: ENGINEER 31-03-2025.pdf2 Dec 2025
Form 3File: FORM 3 31-03-2025.pdf2 Dec 2025
Disclosure of Sold and Booked InventoryFile: Sold and Unsold 31-03-2025.pdf2 Dec 2025
Form 1File: 28A-30-6-25-merged-1.pdf2 Dec 2025
Form 2File: ENGINEER 30-06-2025.pdf2 Dec 2025
Form 3File: FORM 3 30-06-2025.pdf2 Dec 2025
Disclosure of Sold and Booked InventoryFile: Sold and Unsold 30-06-2025.pdf2 Dec 2025
Form 1File: 31-03-21.pdf14 Nov 2025
Form 2File: ENGINEER 31-03-2021.pdf14 Nov 2025
Form 3File: Form 3 31-03-2021.pdf14 Nov 2025
Disclosure of Sold and Booked InventoryFile: Sold and Unsold Inventory 31-03-2021.pdf14 Nov 2025
Disclosure of Sold and Booked InventoryFile: Sold and Unsold Inventory 30-06-2021.pdf14 Nov 2025
Form 1File: 30-06-21.pdf14 Nov 2025
Form 2File: ENGINEER 30-06-2021.pdf14 Nov 2025
Form 3File: ENGINEER 30-06-2021.pdf14 Nov 2025
Form 1File: 30-09-21.pdf14 Nov 2025
Form 2File: 30-09-2021.pdf14 Nov 2025
Form 3File: Form 3 30-09-2021.pdf14 Nov 2025
Disclosure of Sold and Booked InventoryFile: Sold and Unsold Inventory 30-09-2021.pdf14 Nov 2025
Form 1File: 31-12-21.pdf14 Nov 2025
Form 2File: ENGINEER 31-12-2021.pdf14 Nov 2025
Form 3File: Form 3 31-12-2021.pdf14 Nov 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold 31-12-2021.pdf14 Nov 2025
Form 1File: 31-03-22.pdf14 Nov 2025
Form 2File: ENGINEER 31-03-2022.pdf14 Nov 2025
Form 3File: Form 3 31-03-2022.pdf14 Nov 2025
Disclosure of Sold and Booked InventoryFile: Sold and Unsold Inventory 31-03-2022.pdf14 Nov 2025
Form 1File: 30-06-22.pdf14 Nov 2025
Form 2File: 30-06-2022.pdf14 Nov 2025
Form 3File: Form 3 30-06-2022.pdf14 Nov 2025
Disclosure of Sold and Booked InventoryFile: Sold and Unsold Inventory 30-06-2022.pdf14 Nov 2025
Form 1File: 30-9-22.pdf14 Nov 2025
Form 2File: ENGINNER 30-09-2022.pdf14 Nov 2025
Form 3File: Form 3 30-09-2022.pdf14 Nov 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold 30-09-2022.pdf14 Nov 2025
Form 1File: 31-12-22.pdf14 Nov 2025
Form 2File: eNGINEER 31-12-2022.pdf14 Nov 2025
Form 3File: Form 3 31-12-2022.pdf14 Nov 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold 31-12-2022.pdf14 Nov 2025
Form 1File: 31-3-23.pdf14 Nov 2025
Form 2File: ENGINEER 31-03-2023.pdf14 Nov 2025
Form 3File: Form 3 31-03-2023.pdf14 Nov 2025
Disclosure of Sold and Booked InventoryFile: sold Unsold 31-03-2023.pdf14 Nov 2025
Form 1File: 30-06-23.pdf14 Nov 2025
Form 2File: 30-06-2023.pdf14 Nov 2025
Form 3File: Form 3 30-06-2023.pdf14 Nov 2025
Disclosure of Sold and Booked InventoryFile: Sold and Unsold Inventory 30-06-2023.pdf14 Nov 2025
Form 1File: 30-09-23.pdf14 Nov 2025
Form 2File: ENGINEER 30-09-2023.pdf14 Nov 2025
Form 3File: Form 3 30-09-2023.pdf14 Nov 2025

How this compares with Dadra & Nagar Haveli

52%of this project is bookeddistrict median 30%
10%of Dadra & Nagar Haveli projects moved their completion datethis one moved by 43 months
28%of Dadra & Nagar Haveli registrations have lapsed or been cancelledthis one is among them

Computed across the 210+ Dadra & Nagar Haveli projects on ReraGenie, from their own filings.

Keep SHASHIKALP SAROVAR on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near ATHAL, SILVASSA210+ in Dadra & Nagar Haveli

2 kmSHASHIKALP SAROVARCompleted 34Lapsed / revoked 18Other 39Dot size: filed unitsN

Filed coordinates, straight-line distance. 91 registered projects within 2 km.

Builder: AKS BUILDERS AND DEVELOPERES

AKS BUILDERS AND DEVELOPERES has 1 registration on MahaRERA, including SHASHIKALP SAROVAR. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Dadra & Nagar Haveli district page.

Frequently asked questions

What does it mean that SHASHIKALP SAROVAR shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if SHASHIKALP SAROVAR is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHASHIKALP SAROVAR?

The registered promoter entity is AKS BUILDERS AND DEVELOPERES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHASHIKALP SAROVAR?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SHASHIKALP SAROVAR?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHASHIKALP SAROVAR?

The professionals named in the filing: Architect: Narendrakumar Sharma; Engineer: Jiten Patel; Chartered Accountant: ANIL JAIN; Chartered Accountant: Mukesh Choksi. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHASHIKALP SAROVAR?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHASHIKALP SAROVAR. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHASHIKALP SAROVAR to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.