SILVASSA COMMERCIAL HUB
RG-MH-00767 · RERA P49600000088 · Last updated on MahaRERA portal: 25 Apr 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.
See what the report covers Free either way: or have every new Dadra & Nagar Haveli registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SILVASSA COMMERCIAL HUB is a Commercial project by MILAN KHANDUBHAI PATEL in Dadra & Nagar Haveli, registered with MahaRERA as P49600000088 on 24 Feb 2020. Possession is promised by 30 Dec 2026. 0 of the 80 units on this registration are recorded sold or booked, and 2 of 11 construction stages are filed complete.
At a glance
Project
- NameSILVASSA COMMERCIAL HUB
- TypeCommercial
- Location
- SURVEY NO 3131/4/1 VAPI SILVASSA ROAD BESIDE PATEL PETROL PUMP
- SILVASSA
- Dadra & Nagar Haveli
- 396230
- Pincode396230
- MapView location on Google Maps (as filed on RERA)
- RERA no.P49600000088
- ReraGenie IDRG-MH-00767
Builder
- NameMILAN KHANDUBHAI PATEL
- Entity typeIndividual
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on24 Feb 2020
- Promised completion30 Dec 2026
- Revised completionNone
- Buildings1 building record
- Documents filed85 files
Current status
Figures as on 25 Apr 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| SILVASSA COMMERCIAL HUB | NA | 3 | 3 | 0 | 80 | 80 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 25 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
2 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 90%.
SILVASSA COMMERCIAL HUB: 45% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 90% |
| Podiums (if any) | 0% |
| Plinth | 90% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 60% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 40% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 20% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities16
As on 25 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 50% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 50% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
| RCC BOX DRAIN | Yes | 90% |
Parking filed37
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| SILVASSA COMMERCIAL HUB | NA | Rs 4.07 cr | Rs 2.64 cr |
| - | NA | Rs 3.32 cr | Rs 79.60 lakh |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | GAURI NAIKNAVARE |
| Architect | TEJAS M SHUKLA |
| Engineer | KRUPALI KADAM |
| Engineer | DEEPAK PATEL |
| Chartered Accountant | KUNAL SHAH |
| Chartered Accountant | MANISH I SHAH |
| Partner | Role in project |
|---|---|
| MILAN KHANDUBHAI PATEL | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 18 Feb 2020 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 18 Feb 2020 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 18 Feb 2020 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 18 Feb 2020Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 30 Dec 2026
Documents filed85
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 85 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: FORM 1 JUNE 2023.pdf | 25 Apr 2026 |
| Form 2File: FORM 2 JUNE 2023.pdf | 25 Apr 2026 |
| Form 3File: FORM 3 JUNE 2023.pdf | 25 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD JUNE 2023.pdf | 25 Apr 2026 |
| Withdrawal Update Form 1File: FORM 1 JUNE 2023.pdf | 25 Apr 2026 |
| Withdrawal Update Form 1File: FORM 1 SEPT 2023.pdf | 25 Apr 2026 |
| Withdrawal Update Form 1File: FORM 1 DEC 2023.pdf | 25 Apr 2026 |
| Withdrawal Update Form 1File: FORM 1 MAR 2024.pdf | 25 Apr 2026 |
| Withdrawal Update Form 1File: FORM 1 JUNE 2024.pdf | 25 Apr 2026 |
| Withdrawal Update Form 1File: FORM 1 SEPT 2024.pdf | 25 Apr 2026 |
| Withdrawal Update Form 1File: FORM 1 DEC 2024.pdf | 25 Apr 2026 |
| Withdrawal Update Form 1File: FORM 1 MAR 2025.pdf | 25 Apr 2026 |
| Withdrawal Update Form 2File: FORM 2 JUNE 2023.pdf | 25 Apr 2026 |
| Withdrawal Update Form 2File: FORM 2 SEPT 2023.pdf | 25 Apr 2026 |
| Withdrawal Update Form 2File: FORM 2 DEC 2023.pdf | 25 Apr 2026 |
| Withdrawal Update Form 2File: FORM 2 MAR 2024.pdf | 25 Apr 2026 |
| Withdrawal Update Form 2File: FORM 2 JUNE 2024.pdf | 25 Apr 2026 |
| Withdrawal Update Form 2File: FORM 2 SEPT 2024.pdf | 25 Apr 2026 |
| Withdrawal Update Form 2File: FORM 2 DEC 2024.pdf | 25 Apr 2026 |
| Withdrawal Update Form 2File: FORM 2 MAR 2025.pdf | 25 Apr 2026 |
| Withdrawal Update Form 3File: FORM 3 JUNE 2023.pdf | 25 Apr 2026 |
| Withdrawal Update Form 3File: FORM 3 SEPT 2023.pdf | 25 Apr 2026 |
| Withdrawal Update Form 3File: FORM 3 DEC 2023.pdf | 25 Apr 2026 |
| Withdrawal Update Form 3File: FORM 3 MAR 2024.pdf | 25 Apr 2026 |
| Withdrawal Update Form 3File: FORM 3 JUNE 2024_compressed.pdf | 25 Apr 2026 |
| Withdrawal Update Form 3File: FORM 3 SEPT 2024.pdf | 25 Apr 2026 |
| Withdrawal Update Form 3File: FORM 3 DEC 2024.pdf | 25 Apr 2026 |
| Withdrawal Update Form 3File: FORM 3 MAR 2025.pdf | 25 Apr 2026 |
| Form 1File: FORM 1 MAR 2023.pdf | 24 Apr 2026 |
| Form 2File: FORM 2 MAR 2023.pdf | 24 Apr 2026 |
| Form 3File: FORM 3 MAR 2023.pdf | 24 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD MAR 2023.pdf | 24 Apr 2026 |
| Withdrawal Update Form 1File: FORM 1 MAR 2023.pdf | 24 Apr 2026 |
| Withdrawal Update Form 2File: FORM 2 MAR 2023.pdf | 24 Apr 2026 |
| Withdrawal Update Form 3File: FORM 3 MAR 2023.pdf | 24 Apr 2026 |
| Certificates of Architect (Form 1) (UT)(Mandatory for only ongoing project)File: form 1 sept 2022.pdf | 16 Feb 2023 |
| Certificates of Architect (Form 1) (UT)(Mandatory for only ongoing project)File: form 1 dec 2022.pdf | 16 Feb 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2) (UT)File: from 2 sept 2022.pdf | 16 Feb 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2) (UT)File: form 2 dec 2022.pdf | 16 Feb 2023 |
| Certificates of CA (Form 3) (UT)File: Form 3 dec 22_compressed.pdf | 16 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: 2021-2022 SIGN.pdf | 16 Feb 2023 |
| Engineers Certificate on Quality Assurance (Form 2A)File: mar 20.pdf | 16 Feb 2023 |
| Engineers Certificate on Quality Assurance (Form 2A)File: june 20.pdf | 16 Feb 2023 |
| Engineers Certificate on Quality Assurance (Form 2A)File: sept 20.pdf | 16 Feb 2023 |
| Engineers Certificate on Quality Assurance (Form 2A)File: dec 20.pdf | 16 Feb 2023 |
| Engineers Certificate on Quality Assurance (Form 2A)File: mar 21.pdf | 16 Feb 2023 |
| Engineers Certificate on Quality Assurance (Form 2A)File: june 21.pdf | 16 Feb 2023 |
| Engineers Certificate on Quality Assurance (Form 2A)File: sept 21.pdf | 16 Feb 2023 |
| Engineers Certificate on Quality Assurance (Form 2A)File: dec 21.pdf | 16 Feb 2023 |
| Engineers Certificate on Quality Assurance (Form 2A)File: mar 22.pdf | 16 Feb 2023 |
| Engineers Certificate on Quality Assurance (Form 2A)File: june 22.pdf | 16 Feb 2023 |
| Engineers Certificate on Quality Assurance (Form 2A)File: sept 22.pdf | 16 Feb 2023 |
| Engineers Certificate on Quality Assurance (Form 2A)File: dec 22.pdf | 16 Feb 2023 |
| Certificates of Architect (Form 1) (UT)(Mandatory for only ongoing project)File: FORM 1 ARCHITECHT CERTsept 21.pdf | 7 Dec 2022 |
| Certificates of Architect (Form 1) (UT)(Mandatory for only ongoing project)File: FORM 1_31122021.pdf | 7 Dec 2022 |
| Certificates of Architect (Form 1) (UT)(Mandatory for only ongoing project)File: FORM 1_31032022.pdf | 7 Dec 2022 |
| Certificates of Architect (Form 1) (UT)(Mandatory for only ongoing project)File: FORM 1_30062022.pdf | 7 Dec 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2) (UT)File: FORM 2 ENGINEER CERT 30092021.pdf | 7 Dec 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2) (UT)File: FORM 2_31122021.pdf | 7 Dec 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2) (UT)File: FORM 2_31032022.pdf | 7 Dec 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2) (UT)File: FORM 2_30062022.pdf | 7 Dec 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2) (UT)File: FORM 2 ENGINEER CERT.pdf | 7 Dec 2022 |
| Certificates of CA (Form 3) (UT)File: Form 3 CA Certificate.pdf | 7 Dec 2022 |
| Certificates of CA (Form 3) (UT)File: Form 3 CA Certificate.pdf | 7 Dec 2022 |
| Certificates of CA (Form 3) (UT)File: Form 3 CA Certificate.pdf | 7 Dec 2022 |
| Certificates of CA (Form 3) (UT)File: Form 3 CA Certificate.pdf | 7 Dec 2022 |
| Certificates of CA (Form 3) (UT)File: Form 3 CA Certificate.pdf | 7 Dec 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM5.pdf | 21 Jun 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20) (UT)File: FORM5.pdf | 21 Jun 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21) (UT)File: ANNUALRETURN.pdf | 21 Jun 2022 |
| Layout approvalFile: LAYOUT PLAN.pdf | 18 Feb 2020 |
| Building plan approvalFile: BUILDING PLAN.pdf | 18 Feb 2020 |
| PAN CardFile: PAN CARD.pdf | 18 Feb 2020 |
| Copy of the legal title reportFile: TITLE SEARCH REPORT.pdf | 18 Feb 2020 |
| Details of encumbrancesFile: NO ENCUMBERANCE CERTIFICATE.pdf | 18 Feb 2020 |
| Copy of Layout Approval (in case of layout)File: LAYOUT PLAN.pdf | 18 Feb 2020 |
| Building Plan Approval (IOD)File: BUILDING PLAN.pdf | 18 Feb 2020 |
| Commencement CertificatesFile: CONSTRUCTION PERMISSION.pdf | 18 Feb 2020 |
| Declaration in FORM BFile: FORM B.pdf | 18 Feb 2020 |
| Certificates of Architect (Form 1) (UT)(Mandatory for only ongoing project)File: FORM 1 ARCHITECT CERTIFICATE_compressed.pdf | 18 Feb 2020 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Dadra & Nagar Haveli
Computed across the 210+ Dadra & Nagar Haveli projects on ReraGenie, from their own filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 85 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep SILVASSA COMMERCIAL HUB on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near SILVASSA210+ in Dadra & Nagar Haveli
Filed coordinates, straight-line distance. 83 registered projects within 2 km.
PRAMUKH SHIVANTA
ROYAL ENTERPRISE
SHASHIKALP SAROVAR
AKS BUILDERS AND DEVELOPERES
Ekdant Silver Oak
Ekdant Developers
Nagjua Ananta
MICROMEGA PROJECTS
ROYAL VIEW-II
M & P DEVELOPERS
PARADISE ONE
JMB REALTY
See every Dadra & Nagar Haveli project, with the district possession charts
Builder: MILAN KHANDUBHAI PATEL
MILAN KHANDUBHAI PATEL has 1 registration on MahaRERA, including SILVASSA COMMERCIAL HUB. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Dadra & Nagar Haveli district page.
Frequently asked questions
What are my rights if SILVASSA COMMERCIAL HUB is delayed beyond 30 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SILVASSA COMMERCIAL HUB?
The registered promoter entity is MILAN KHANDUBHAI PATEL, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SILVASSA COMMERCIAL HUB?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SILVASSA COMMERCIAL HUB?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SILVASSA COMMERCIAL HUB?
The professionals named in the filing: Architect: GAURI NAIKNAVARE; Architect: TEJAS M SHUKLA; Engineer: KRUPALI KADAM; Engineer: DEEPAK PATEL; Chartered Accountant: KUNAL SHAH; Chartered Accountant: MANISH I SHAH. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SILVASSA COMMERCIAL HUB?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback