ReraGenieLog inGet a buyer report

Home / Browse projects / Dadra & Nagar Haveli / HORIZON GREENS

Registered No litigation declared Residential / Group Housing project

HORIZON GREENS

By MAGIC RETREAT

RG-MH-03476 · RERA P49600000164 · Last updated on MahaRERA portal: 9 Jan 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.

See what the report covers Free either way: or have every new Dadra & Nagar Haveli registration emailed to you, free during the pilot beta.
Mar 2031Possession promisedno revision filed
16 of 132Construction stages doneacross 12 buildings; furthest along: Internal walls, 80%
0Complaints at MahaRERAon this registration
Jump to the 62 documents Report an error

HORIZON GREENS is a Residential / Group Housing project by MAGIC RETREAT in Dadra & Nagar Haveli, registered with MahaRERA as P49600000164 on 2 May 2024. Possession is promised by 31 Mar 2031.

At a glance

Project

  • NameHORIZON GREENS
  • TypeResidential / Group Housing
  • Location
    • SURVEY NO 258 (OLD SURVEY NO 22/5)
    • DHAPSA
    • NAROLI ROAD
    • SILVASSA
    • Others
    • Dadra & Nagar Haveli
    • 396230
  • Pincode396230
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P49600000164
  • ReraGenie IDRG-MH-03476

Builder

  • NameMAGIC RETREAT
  • Entity typePartnership
  • PartnersMOTILAL C SHAH, NARPAT S RAJPUROHIT, RUSHAB M SHAH, PRATIK M SHAH
  • Other registrations1 more →
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredMay 2024PromisedMar 2031

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on2 May 2024
  • Promised completion31 Mar 2031
  • Revised completionNone
  • Buildings12 building records
  • Documents filed62 files

Current status

16.1%Work done, per cost certificate

Figures as on 9 Jan 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A WINGNA60000
B WINGNA60000
C WINGNA60000
D WINGNA60000
E WINGNA60000
F WINGNA60000
G WINGNA60000
H WINGNA50000
I WINGNA50000
J WINGNA50000
K WINGNA50000
CHENAB BUILDINGNA50000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building12

As on 9 Jan 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

16 of 132 construction stages are filed complete across 12 buildings. The stage furthest along is Internal walls, at 80%.

A WING0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
B WING0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
C WING0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
D WING0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
E WING0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
F WING0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
G WING12%
ActivityProgress
Excavation33%
Basement (if any)0%
Podiums (if any)0%
Plinth33%
Stilt Floor33%
Slabs of Super Structure33%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
H WING0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
I WING67%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
J WING0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
K WING0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
CHENAB BUILDING100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 9 Jan 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes22%
Water SupplyYes22%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes22%
Storm Water DrainsYes22%
Landscaping & Tree PlantingYes22%
Street LightingYes10%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes22%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes22%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed12

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots12
Closed/Covered12
BuildingClosed/CoveredTotal
A WING11
B WING11
C WING11
D WING11
E WING11
F WING11
G WING11
H WING11
I WING11
J WING11
K WING11
CHENAB BUILDING11

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area17,348 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on6 Oct 2025

Approvals and building plan

Sanctioning authorityDADRA AND NAGAR HAVELI PLANNING AND DEVELOPMENT AUTHORITY
Permissible FSI17238.2
Proposed, not sanctioned17,238 sq m
Buildings approved12
Buildings sanctioned12

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHOP NO 3 TO 10 JAINEEL COMPLEX NAROLI ROAD SILVASSA
Estimated costRs 33.99 cr
Cost incurredRs 5.47 cr
Work done16.08%
BuildingWingEstimatedIncurred
D WINGNARs 5.34 cr-
G WINGNARs 5.19 crRs 2.79 cr
F WINGNARs 4.86 cr-
C WINGNARs 4.28 cr-
E WINGNARs 4.17 cr-
B WINGNARs 4.03 cr-
CHENAB BUILDINGNARs 2.68 crRs 2.68 cr
A WINGNARs 2.44 cr-
-NARs 1.00 cr-

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAMITKUMAR JAVIYA
EngineerKUSHANG Paajapati
Chartered AccountantAmitkumar
PartnerRole in project
MAGIC RETREAT-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 25 Apr 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 12 Mar 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 12 Apr 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 12 Mar 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2031

Documents filed62

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: form 1 30-06-2025.pdf9 Jan 2026
Withdrawal Update Form 2File: Form 2 30092025.pdf9 Jan 2026
Withdrawal Update Form 3File: FORM 3 30092025.pdf9 Jan 2026
Withdrawal Update Form 1File: form 1 30-06-2025.pdf6 Oct 2025
Withdrawal Update Form 2File: form 2 30-06-2025.pdf6 Oct 2025
Withdrawal Update Form 3File: form 3 30-06-2025.pdf6 Oct 2025
Form 1File: form 1 30062024.pdf13 Jun 2025
Form 2File: FORM 2 MAGIC 30062024.pdf13 Jun 2025
Form 3File: Form 3 30062024.pdf13 Jun 2025
Disclosure of Sold and Booked InventoryFile: 30062024.pdf13 Jun 2025
Form 1File: form 1 30092024.pdf13 Jun 2025
Form 2File: FORM 2 30092024.pdf13 Jun 2025
Form 3File: FORM 3 3092024.pdf13 Jun 2025
Disclosure of Sold and Booked InventoryFile: 30092024.pdf13 Jun 2025
Form 1File: form 1 31122024.pdf13 Jun 2025
Form 2File: form 2 31122024.pdf13 Jun 2025
Form 3File: FORM 3 31122024.pdf13 Jun 2025
Disclosure of Sold and Booked InventoryFile: 31122024.pdf13 Jun 2025
Form 1File: form 1 31032025.pdf13 Jun 2025
Form 2File: form 2 31032025.pdf13 Jun 2025
Form 3File: Form 3 31032025.pdf13 Jun 2025
Disclosure of Sold and Booked InventoryFile: 31032025.pdf13 Jun 2025
Architect’s Certificate on Completion of Project (Form 4) (UT)File: FORM 4 (1).pdf3 Dec 2024
Other - TechnicalFile: PART OC.pdf3 Dec 2024
Copy of the legal title reportFile: area justification.pdf25 Apr 2024
Other - LegalFile: area justification.pdf25 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3) (UT)File: FORM 3 NEW.pdf18 Apr 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A Separate Bank Account.pdf18 Apr 2024
Building plan approvalFile: LAYOUT MAP HIGHLIGHTED.pdf12 Apr 2024
Copy of the legal title reportFile: NEW TITLE REPORT.pdf12 Apr 2024
Building Plan Approval (IOD)File: LAYOUT MAP HIGHLIGHTED.pdf12 Apr 2024
Other - LegalFile: SALE DEED MAGIC RETREAT.pdf12 Apr 2024
Other - LegalFile: 712.pdf12 Apr 2024
Details of encumbrances concerned to FinanceFile: Legal Encum New.pdf29 Mar 2024
Details of encumbrances concerned to LegalFile: Legal Encum New.pdf29 Mar 2024
Other - TechnicalFile: Annexure A New.pdf29 Mar 2024
Other - TechnicalFile: Declaration cum Undertaking New.pdf29 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1) (UT)File: Form 01 MAGIC PDF.pdf27 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2) (UT)File: FORM 2 MAGIC.pdf27 Mar 2024
Layout approvalFile: BEAS and RAVI BUILDING.pdf12 Mar 2024
Layout approvalFile: GANGA and SUTLEJ BUILDING.pdf12 Mar 2024
Layout approvalFile: krishna and kaveri.pdf12 Mar 2024
Layout approvalFile: narmada and jhelam building.pdf12 Mar 2024
Layout approvalFile: TAPI 1 2 AND MAHANADI building.pdf12 Mar 2024
Layout approvalFile: yamuna and chenab.pdf12 Mar 2024
PAN CardFile: Pan Card Magic Retreat.pdf12 Mar 2024
Copy of Layout Approval (in case of layout)File: BEAS and RAVI BUILDING.pdf12 Mar 2024
Copy of Layout Approval (in case of layout)File: GANGA and SUTLEJ BUILDING.pdf12 Mar 2024
Copy of Layout Approval (in case of layout)File: krishna and kaveri.pdf12 Mar 2024
Copy of Layout Approval (in case of layout)File: narmada and jhelam building.pdf12 Mar 2024
Copy of Layout Approval (in case of layout)File: TAPI 1 2 AND MAHANADI building.pdf12 Mar 2024
Copy of Layout Approval (in case of layout)File: yamuna and chenab.pdf12 Mar 2024
Commencement CertificatesFile: CP full.pdf12 Mar 2024
Declaration in FORM BFile: FORM B MAGIC.pdf12 Mar 2024
CERSAI detailsFile: CERSAI_Search_Report.pdf12 Mar 2024
Annual Report / Audited Financial Statements for the immediately preceding three financial yearsFile: ITR 2021.pdf12 Mar 2024
Annual Report / Audited Financial Statements for the immediately preceding three financial yearsFile: ITR 2022.pdf12 Mar 2024
Annual Report / Audited Financial Statements for the immediately preceding three financial yearsFile: ITR 2023.pdf12 Mar 2024
Proforma of Allotment letterFile: Allotment letter pdf.pdf12 Mar 2024
Proforma of Agreement for saleFile: AFS PDF.pdf12 Mar 2024
Deviation Report with respect to Allotment letterFile: deviation afs allotment.pdf12 Mar 2024
Deviation Report with respect to model copy of AgreementFile: deviation afs allotment.pdf12 Mar 2024

How this compares with Dadra & Nagar Haveli

10%of Dadra & Nagar Haveli projects moved their completion datethis one has not
28%of Dadra & Nagar Haveli registrations have lapsed or been cancelledthis one is on the register

Computed across the 210+ Dadra & Nagar Haveli projects on ReraGenie, from their own filings.

Keep HORIZON GREENS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near DHAPSA, NAROLI ROAD, SILVASSA210+ in Dadra & Nagar Haveli

2 kmHORIZON GREENSLapsed / revoked 3Other 12Dot size: filed unitsN

Filed coordinates, straight-line distance. 15 registered projects within 2 km.

Builder: MAGIC RETREAT

MAGIC RETREAT has 2 registrations on MahaRERA, including MAHADEV RESIDENCY NAROLI and HORIZON GREENS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Dadra & Nagar Haveli district page.

Frequently asked questions

What are my rights if HORIZON GREENS is delayed beyond 31 Mar 2031?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of HORIZON GREENS?

The registered promoter entity is MAGIC RETREAT, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in HORIZON GREENS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for HORIZON GREENS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at HORIZON GREENS?

The professionals named in the filing: Architect: AMITKUMAR JAVIYA; Engineer: KUSHANG Paajapati; Chartered Accountant: Amitkumar. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in HORIZON GREENS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About HORIZON GREENS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save HORIZON GREENS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.